Skip to content

docs(i18n): recover 46 guardrails translations - #17351

Closed
diegosouzapw wants to merge 2 commits into
release/v3.8.53from
docs/issues53-docs-delivery-20261020
Closed

diegosouzapw wants to merge 2 commits into
release/v3.8.53from
docs/issues53-docs-delivery-20261020

Conversation

@diegosouzapw

@diegosouzapw diegosouzapw commented Oct 20, 2026 •

Copy link
Copy Markdown
Collaborator

⚠️ base-red inherited: #17219

Recover the 46 GUARDRAILS translations completed by the interrupted translation wave. This is a partial, reviewable checkpoint: 20 GUARDRAILS locales remain stale, and RESILIENCE_GUIDE/ENVIRONMENT are not completed by this PR.

The change contains only 46 GUARDRAILS mirrors and their scoped .i18n-state.json records. The translation backend/fallback implementation was merged externally through #17255; no runtime code or agent-instruction mirror is included here.

Validation:

  • npm run check:docs-all: PASS before and after syncing the delivery branch to bbc90875c8a9086af4d0266b1549b16337e42248.
  • Structural comparison against d91f01137788d4b936048d177f8cb341651500d3: 46 changed mirrors, zero new structural regressions, zero reasoning leaks.
  • Reference audit: zero lost issue-reference regressions.
  • Chunk/content guard audit: 46/46 mirrors passed, including inline-code preservation.
  • Source/target hashes checked; only the GUARDRAILS source record changed. Japanese and Romanian content sampled, in addition to structural and inline-code checks.
  • The global translation drift gate still fails (13 drifted sources, 66 drifted targets, 128 stale targets; categories may overlap). This PR does not claim to make the full i18n gate green.

The remaining writer was stopped after the backend returned a local execution deadline of 60 seconds. The same failure occurred with concurrency reduced to one and the approved fallback chain. Existing work is preserved; no translation is treated as complete merely because hashes were recorded. No merge or deployment is part of this change.

Base reconciliation: synced with bbc90875c8a9086af4d0266b1549b16337e42248 after external merges #17303, #17236, #17255 and #17276. The 46 mirrors, their source and state are byte-identical to the audited checkpoint; the PR still changes only the 47 documentation/state files.

@diegosouzapw

Copy link
Copy Markdown
Collaborator Author

Closing as superseded, with the owner's approval: GUARDRAILS was fully re-translated in all 66 locales by #17950 (merged 2026-10-22) and the i18n drift gate is green on release/v3.8.53, so the 46-locale partial checkpoint here is no longer needed. Thanks for the recovery work — nothing of it is lost; the current mirrors cover it.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant