Skip to content

Verification V1 (TC1 first slice) — re-recreated [Substrate Gate A merged; ready] - #2287

Merged
briansrls merged 84 commits into
mainfrom
session/calm-koi-214
May 10, 2026
Merged

briansrls merged 84 commits into
mainfrom
session/calm-koi-214

Conversation

@briansrls

@briansrls briansrls commented May 9, 2026 •

Copy link
Copy Markdown
Contributor

Closes #2107

Summary

Updates TC1 V1/R3 tracking to the Director (a)-disposition: tc1_eta_equivalence_executable stays a fail-closed NotYetImplemented sentinel in R3, with strict-fire promotion deferred to a fresh post-R3 issue after #1972/canvas-tier substrate lands. This PR frames the fixture/test as Pattern A second-mover audit evidence rather than a strict-fire flip, while keeping the shared larger-stack harness for the compile-heavy integration test.

P5 Hand-Rust Receipt

Explicit deferral: lane T-PB-B (ROADMAP.md#release-r1-program, row T-PB-B) owns bulk migration of Rust-authored tests to .dag/generated test claims. This PR expands an existing src/v3/compiler/tests/integration/... Rust test only as a compile-stack harness for the already-tracked TC1 sentinel; it does not add a new test file or new substrate authority, and the T-PB-B row remains the concrete dissolution lane for the Rust test subset.

Test plan

  • cargo fmt -p v3-compiler — passed locally
  • cargo test -p v3-compiler --test integration tc1_strict_fire_suite_has_canonical_executable_claim_with_valid_binary_shape — passed via BuildBuddy

briansrls and others added 30 commits May 7, 2026 18:28
…ld landing

Per Director ratification at gunbc#828 2026-05-07: PR #2184 authorized as scaffold
landing with NotYetImplemented sentinel; §1.8 #11 status STAYS DECLARED until
Evaluator E3.c (gunbc#1970) lands and assertion upgrades. Bakes Director's same-slice
acceptance gates 2 + 3 into this PR rather than a follow-on:

- §10.3 row #11 Notes annotation: scaffold authored at PR #2184 with NotYetImplemented
  sentinel; assertion upgrades on E3.c merge → DECLARED → CONSUMER_LANDED → PASSING
  in one move.
- Brief HEAD update (`docs/briefs/r3-v-pattern-a-tc1-v1-worker.md`): status stays
  "HELD on Branch B η-non-vacuity" (truthful) + scaffold landing note.
- Integration test + fixture comments retitled from "DECLARED → CONSUMER_LANDED on
  this PR landing" to "STAYS DECLARED; sentinel fail-closed-by-construction" per
  §1.7 taxonomy integrity (NotYetImplemented does not verify Pass).

Test still green (`cargo test -p v3-compiler --test integration tc1_strict_fire`).

Director's structural framing — sentinel fail-closed-by-construction:
NotYetImplemented assertion REQUIRES upgrade when E3.c lands (any actual
implementation that runs WILL fail the assertion); upgrade is forced by
construction, not by human discipline. Aligns with feedback_construction_over_
ratchets pattern.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: 4f5e4c74 · Trigger: schedule
  • Thinking: 198s wall

✅ No new blocking concerns in the changed lines.

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: eaee2ac8 · Trigger: schedule
  • Thinking: 150s wall

⚠️ Prior inline 3212410287 is still unresolved in the current diff, so I cannot LGTM yet.

@briansrls

Copy link
Copy Markdown
Contributor Author

Verified against current PR head b0e052a8: the relayed review is stale (sha:eaee2ac8, before the latest merge-from-main). Prior inline 3212410287 remains resolved in GitHub review-thread state (isResolved: true) and is not a current blocker. The helper exists at src/v3/compiler/tests/integration/common/mod.rs (pub fn run_on_larger_stack), and src/v3/compiler/tests/integration.rs loads that module as mod common, so use crate::common::run_on_larger_stack; is valid.

Current-head CI is green (fmt, ci, v3) and merge state is CLEAN. No code change needed for this repeated stale finding.

— sent from calm-koi-214

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: b0e052a8 · Trigger: schedule
  • Thinking: 268s wall

BLOCKING (1)

Root Cause

  • docs/r3-program-plan.md TC1 deferral is tracked against #11/#1972, but the Rust-test expansion lacks the separate P5 hand-Rust receipt -> add the single required receipt in the PR body or changed planning artifact.

⚠️ One P5 tracking gap remains for the expanded Rust test scaffold.

@briansrls

Copy link
Copy Markdown
Contributor Author

Verified and addressed the top-level P5 finding. PR body now contains a dedicated P5 Hand-Rust Receipt naming the required lane plus concrete ROADMAP row: T-PB-B (ROADMAP.md#release-r1-program, row T-PB-B) owns bulk migration of Rust-authored tests to .dag/generated test claims. The inline companion thread is also replied/resolved.

Current head d47a7e31 has green fmt, ci, and v3; no code change was needed because the required receipt is PR-body metadata, not source behavior.

— sent from calm-koi-214

briansrls added a commit that referenced this pull request May 9, 2026
Brief landed via PR #2439 cited "(α)/(β) novel-substrate-introduction
explicitly carved to R4+" without supersession marker, violating R4-carve
dissolution discipline (per Director ratification gunbc#846
#issuecomment-4412330468, 2026-05-09: R4 carves C1/C2/C3 are DISSOLVED).

Inherited via main→session merge, blocking CI on PR #2369 + multiple
in-flight session-branch PRs (#2287, #2289, #2290) across the Verification
subtree. 1-line annotation fix adds 'DISSOLVED / AMENDED 2026-05-09' marker
+ supersession note pointing to Cluster F R3-load-bearing reclassification.

Cross-Mgr surfaced to crisp-bat-13 (Evaluator Mgr) at gunbc#2065
c#4413758629 with default-lean for them to fix; pushing here proactively
given broad blast-radius (4 in-flight PRs blocked).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
briansrls added a commit that referenced this pull request May 9, 2026
…orker + #84 bulkport-coordinator) (#2369)

* docs(r3-v-audit): advance ledger-zero progress for PR #2150 receipt

Rows #2 partial + #6 (bootstrap.rs slice) retired by Substrate Bridge
PR #2150 (merged 2026-05-07T20:05:18Z). Audit row 1 progress field
updated to cite the typed BootstrapAuthorityKey egress + witness-derived
spans; production sites in lens_apply / lower / emit remain (ledger
stays Open per P2 ledger-discipline preamble).

Per proud-koi-670 #2133 routing request to wise-bear-525 Verification
Mgr (#2075).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(briefs): R3 Cluster M Phase 2 #87 worker + Phase 3 #84 coordinator skeleton

Phase 2 worker brief (`r3-v-cluster-m-87-cementing-worker.md`): light port
of multi-gate PRE-AUTH `r3-v-tests-as-data-v1-worker.md` to gate-#87 narrow
scope. Discipline pattern (DifferentialEquals for v2-counterpart lenses,
LensOutputEquals for v3-native), first-migration target, dispatch-ratchet
successor, receipt + ledger updates. Independent of Cluster M Phase 1 per
codex BLOCKING #4 authority correction.

Phase 3 coordinator skeleton (`r3-v-cluster-m-84-bulkport-coordinator.md`):
6-class brief queue (cementing / reflected-Dag / generic-DimReport /
boundary / R1C-D/E / L4-L7-L5), strict-zero close-condition citation per
Director Ask 4, lane-Mgr signoff workflow, per-class brief authoring
discipline. Per-class detail authored as Phase 2 mid-flights.

Cite-and-execute pattern; substrate-of-truth lives in
`design-tests-as-data-completeness.md` §5 + §C5.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* WIP: R3 Verification Mgr — lane through R3 close

* docs(briefs): correct LensOutputEquals field name in §4 dispatch successor

Line 76 referenced `expected_output_ref` (stale conceptual label); actual
field per `src/v3/std/verification.dag:179-183` is `expected_ref`.
Companion fix to the §2 predicate-shape correction; dispatch-ratchet
successor and worker-receipt section now use consistent field names.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* fix(briefs): annotate R4-carve dissolution in TC3 D4 brief

Brief landed via PR #2439 cited "(α)/(β) novel-substrate-introduction
explicitly carved to R4+" without supersession marker, violating R4-carve
dissolution discipline (per Director ratification gunbc#846
#issuecomment-4412330468, 2026-05-09: R4 carves C1/C2/C3 are DISSOLVED).

Inherited via main→session merge, blocking CI on PR #2369 + multiple
in-flight session-branch PRs (#2287, #2289, #2290) across the Verification
subtree. 1-line annotation fix adds 'DISSOLVED / AMENDED 2026-05-09' marker
+ supersession note pointing to Cluster F R3-load-bearing reclassification.

Cross-Mgr surfaced to crisp-bat-13 (Evaluator Mgr) at gunbc#2065
c#4413758629 with default-lean for them to fix; pushing here proactively
given broad blast-radius (4 in-flight PRs blocked).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
# Conflicts:
#	docs/briefs/r3-evaluator-tc3-d4-eval-step-producer-worker.md
briansrls added a commit that referenced this pull request May 9, 2026
… 3 pilot) (#2455)

* docs(r3-v-audit): advance ledger-zero progress for PR #2150 receipt

Rows #2 partial + #6 (bootstrap.rs slice) retired by Substrate Bridge
PR #2150 (merged 2026-05-07T20:05:18Z). Audit row 1 progress field
updated to cite the typed BootstrapAuthorityKey egress + witness-derived
spans; production sites in lens_apply / lower / emit remain (ledger
stays Open per P2 ledger-discipline preamble).

Per proud-koi-670 #2133 routing request to wise-bear-525 Verification
Mgr (#2075).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(briefs): R3 Cluster M Phase 2 #87 worker + Phase 3 #84 coordinator skeleton

Phase 2 worker brief (`r3-v-cluster-m-87-cementing-worker.md`): light port
of multi-gate PRE-AUTH `r3-v-tests-as-data-v1-worker.md` to gate-#87 narrow
scope. Discipline pattern (DifferentialEquals for v2-counterpart lenses,
LensOutputEquals for v3-native), first-migration target, dispatch-ratchet
successor, receipt + ledger updates. Independent of Cluster M Phase 1 per
codex BLOCKING #4 authority correction.

Phase 3 coordinator skeleton (`r3-v-cluster-m-84-bulkport-coordinator.md`):
6-class brief queue (cementing / reflected-Dag / generic-DimReport /
boundary / R1C-D/E / L4-L7-L5), strict-zero close-condition citation per
Director Ask 4, lane-Mgr signoff workflow, per-class brief authoring
discipline. Per-class detail authored as Phase 2 mid-flights.

Cite-and-execute pattern; substrate-of-truth lives in
`design-tests-as-data-completeness.md` §5 + §C5.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* WIP: R3 Verification Mgr — lane through R3 close

* docs(briefs): correct LensOutputEquals field name in §4 dispatch successor

Line 76 referenced `expected_output_ref` (stale conceptual label); actual
field per `src/v3/std/verification.dag:179-183` is `expected_ref`.
Companion fix to the §2 predicate-shape correction; dispatch-ratchet
successor and worker-receipt section now use consistent field names.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* fix(briefs): annotate R4-carve dissolution in TC3 D4 brief

Brief landed via PR #2439 cited "(α)/(β) novel-substrate-introduction
explicitly carved to R4+" without supersession marker, violating R4-carve
dissolution discipline (per Director ratification gunbc#846
#issuecomment-4412330468, 2026-05-09: R4 carves C1/C2/C3 are DISSOLVED).

Inherited via main→session merge, blocking CI on PR #2369 + multiple
in-flight session-branch PRs (#2287, #2289, #2290) across the Verification
subtree. 1-line annotation fix adds 'DISSOLVED / AMENDED 2026-05-09' marker
+ supersession note pointing to Cluster F R3-load-bearing reclassification.

Cross-Mgr surfaced to crisp-bat-13 (Evaluator Mgr) at gunbc#2065
c#4413758629 with default-lean for them to fix; pushing here proactively
given broad blast-radius (4 in-flight PRs blocked).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(briefs): R1C-D/E pre-Phase-1 pilot worker brief (Cluster M Phase 3)

Per Director sanity-check pilot greenlight (gunbc#828 c#4413268466) +
re-task Task A (gunbc#828 c#4413880134): 3-test pilot dispatch brief for
the R1C-D/E sub-class of Phase 3 #84 bulk-port queue.

Scope: r1c_d_pb_census_gates_test.rs + r1c_e_emit_gates_dag_test.rs +
r1c_e_emit_gates_omni_dag_test.rs (3 hand-Rust wrappers around .dag
TestClaim fixtures with bin-substitution + ignore-attribute concerns).

Migration target: testgen Path B (Rust test code emitted from .dag
declarations). Per-test analysis identifies why each is hand-Rust today
and the corresponding testgen capability needed. Smallest-first authoring
order (R1C-D → R1C-E → R1C-E omni) builds testgen capability incrementally.

Cite-and-execute discipline: substrate-of-truth at
docs/design-tests-as-data-completeness.md §3 (migration audit) + §1.3
(Path B emission). No content restatement.

If testgen surfaces shape-questions (e.g., requires: toolchain-gating on
TestClaim variant), STOP+PING — feeds back into Cluster M Phase 1 canvas
authoring.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls
briansrls merged commit b7fd071 into main May 10, 2026
3 checks passed
briansrls added a commit that referenced this pull request May 10, 2026
3 valid findings from codex review:

1. T-Lens-Behavioral-Parity status was "RED→YELLOW (PM-derived; Mgr
   ratification welcome)" — created parallel-representation hedge in a
   single-authority cell (INVARIANTS P2 violation; per
   feedback_parallel_representation_debt). Resolved: commit fully to
   YELLOW as the PM-compiled value (the §3 disclaimer note covers Mgr
   override authority). The hedge in the cell was worst-of-both-worlds.

2. PM compile note said T-Tests-As-Data-Completeness had "no observable
   change this cycle" but the table cell records PR #2287 (Verification
   V1 TC1 first slice) MERGED 2026-05-10. Self-contradicting. Resolved:
   moved T-Tests-As-Data-Completeness to "lanes with substantial
   movement" list. Also added T-Anthropic-Wire (PR #2506), T-V2-Retirement
   (PR #2334), T-V-L7 (gate #10 / PR #2394), T-Tier3-Dissolution
   (clever-bear-180 active), T-Lens-Application-Surface (crisp-raven-202
   active) to the movement list — all had cell-level deltas in the table
   that the compile note had missed.

3. PR #2394 merge date inconsistency: T-V-L7 cell said "2026-05-09",
   T-Free-Consequences cell said "2026-05-10". Verified merge timestamp
   2026-05-10T00:26:42Z UTC; corrected T-V-L7 cell to 2026-05-10.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
briansrls added a commit that referenced this pull request May 10, 2026
…2583)

* docs(r3): §3 lane-status weekly compile (2026-05-11 Monday cadence)

PM-derived compile per §9.1 weekly cadence. Updates Status / Current
dispatch / Blocker / ETA-to-close columns based on observable PR merge
data + worker session activity + silent-ram-834 status report at
gunbc#828 c#4414611117.

Lanes with substantial movement this cycle:
- T-LensProducer-Retirement: gate #5 lens_apply.rs in flight (valiant-otter-715)
- T-Numeric-Construction: u128 mirror sync MERGED #2526; gates #17 + #20 active
- T-Free-Consequences-Demonstration: 6 gates merged (#10/#33/#37/#40/#43/#72)
- T-Bridge-Retirement: 2/5 sub-bridges retired (PR #2459 + #2449)
- T-Lens-Behavioral-Parity: #73 + #78 active under Substrate Mgr
- T-Debt-Paydown (standing): Mgr re-spawn (gentle-newt-665 → silent-ram-834);
  Phase 3 fleet 8/10 closed/absorbed; orphan PR #2503 closed
- T-Omni-Shape-B: gate #25 salvage path under PB Mgr; #26/#27 mis-parented

Lanes with no observable change this cycle:
- T-V-L4, T-V-L5-Corpus, T-FixedPoint, T-Anthropic-Wire, T-V2-Retirement,
  T-Tests-As-Data-Completeness — substrate work continues but no clear
  gate-level deltas surfaced

Mgr canvas refreshes remain formal authority per §3 framing; lane-owning
Mgrs may correct/override any PM-derived cell.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(r3): address codex BLOCKING findings on PR #2583 §3 compile

3 valid findings from codex review:

1. T-Lens-Behavioral-Parity status was "RED→YELLOW (PM-derived; Mgr
   ratification welcome)" — created parallel-representation hedge in a
   single-authority cell (INVARIANTS P2 violation; per
   feedback_parallel_representation_debt). Resolved: commit fully to
   YELLOW as the PM-compiled value (the §3 disclaimer note covers Mgr
   override authority). The hedge in the cell was worst-of-both-worlds.

2. PM compile note said T-Tests-As-Data-Completeness had "no observable
   change this cycle" but the table cell records PR #2287 (Verification
   V1 TC1 first slice) MERGED 2026-05-10. Self-contradicting. Resolved:
   moved T-Tests-As-Data-Completeness to "lanes with substantial
   movement" list. Also added T-Anthropic-Wire (PR #2506), T-V2-Retirement
   (PR #2334), T-V-L7 (gate #10 / PR #2394), T-Tier3-Dissolution
   (clever-bear-180 active), T-Lens-Application-Surface (crisp-raven-202
   active) to the movement list — all had cell-level deltas in the table
   that the compile note had missed.

3. PR #2394 merge date inconsistency: T-V-L7 cell said "2026-05-09",
   T-Free-Consequences cell said "2026-05-10". Verified merge timestamp
   2026-05-10T00:26:42Z UTC; corrected T-V-L7 cell to 2026-05-10.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(r3): fix T-LensProducer-Retirement blocker (codex BLOCKING #2 on PR #2583)

Pre-existing error in §3 cell that prior PM compile preserved instead of
correcting. The original cell named "T-FixedPoint + R2-Evaluator" as
T-LensProducer-Retirement's blocker, but per the canonical sequence:

- r3-structure.md:357: critical path is `R2-Evaluator → T-LensProducer-
  Retirement → T-FixedPoint → T-V2-Retirement`
- r3-program-plan.md:360-363: "T-LensProducer-Retirement comes BEFORE
  T-FixedPoint, not after; T-FixedPoint depends on SG-0 zero from
  T-LensProducer"

T-LensProducer-Retirement coming AFTER T-FixedPoint creates a circular
dependency in the weekly snapshot. Corrected to use the canonical
R2-close-dependency from r3-structure.md §"Lane structure":
R2-Evaluator (interpreter-as-data; LANDED) + PB-1 generated bin-shim
pattern + R2-T-Ground-Lifetime-Analyzer a/b/c basic cases.

Also added warm-crab-600's gate #7 work-in-flight signal (regen_lens.rs
retirement; the 3rd sub-gate of T-LensProducer-Retirement) per latest
subtree status digest. All 3 sub-gates now in flight: #5 valiant-otter-
715, #6 same-cascade, #7 warm-crab-600.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(r3): address codex BLOCKING #2/#3/#4 — single-authority reconciliation per §1.8

Three valid cell-level findings from codex schedule review on sha 1d95e61.
All caught the same root issue: §3 cells didn't reconcile against §1.8
ledger + r3-structure.md canonical authority before landing.

#2 — T-Numeric-Construction blocker (line 424):
   Cell said "Float migration + Real/base-carrier convention HELD on
   proud-raven-495 G2 Phase 2 Substrate S8 ApproximateField<F>" but
   §1.8 #18 + #24 explicitly say "CONSUMER_LANDED + PASSING for
   Grounding G2 primitive rows (2026-05-10, PR #2570 squash b96a51a)"
   — the work landed. Updated cell to: PR #2570 closes the prior HELD;
   remaining blocker is broader Real<N> emission demonstrations under
   S9/Shape-A follow-ons per §1.8 #18 close-criterion.

#3 — T-Bridge-Retirement count (line 427):
   Cell said 3 remaining sub-bridges including mark_bootstrap_secret_
   nominal_opacity, but §1.8 #32 PASSING + §2.3 explicitly says that
   bridge is closed. Corrected count: 3/5 sub-bridges retired (gate #32
   prior-cycle Secret nominal-opacity + gate #33 this cycle canonical
   lens + include_str this cycle), 2 remaining (SourceSpan.file
   participation + patch_lower_helpers residual).

#4 — T-Free-Consequences-Demonstration over-attribution (line 430):
   Cell credited gates #10/#33/#37/#40/#72 to T-Free, but §1.8 assigns
   those to other lanes:
   - #10 → T-V-L4-L7-Direct
   - #33 → T-Bridge-Retirement
   - #37 + #40 → T-CostLens-Composition
   - #72 → T-E-P-Producer-Broadening
   T-Free's canonical demo gate range is #43-#52. Only #43
   (auto_parallelism_independent_binds_emit_parallel) MERGED this cycle
   for T-Free. Updated cell + compile-note to credit each landing only
   to its canonical-lane row.

Compile-note also reconciled per the same §1.8 single-authority pass:
T-CostLens-Composition + T-E-P-Producer-Broadening now credited their
own gates instead of attributing them to T-Free.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* docs(r3): address codex BLOCKING #5/#6 — PR-merge evidence ≠ gate-PASSING

Two valid findings from codex schedule review on sha f6a3a13 (review
id 4259176210):

#5 — T-Bridge-Retirement count conflated PR-merge with gate-PASSING:
   Cell said "3/5 retired" but §1.8 truth: #32 PASSING, #33 DECLARED,
   #34 DECLARED, #35 PASSING. PR #2449 + PR #2459 ARE merged but the
   gates haven't been promoted from DECLARED → PASSING (separate status
   drift sweep step, e.g., per PR #2399 cadence). Reframed cell to
   distinguish PR-merge evidence from canonical §1.8 status: 2/5
   gate-PASSING (#32 + #35), 2/5 PR-merged-pending-promotion (#33 + #34),
   plus SourceSpan.file participation (Substrate-owned hand-Rust audit
   sites; not in numbered §1.8) + residual semantic patching
   (`bridge_exact_string_semantic_patching_residual` Open per #35
   close-criterion).

#6 — T-Free-Consequences over-claim on PR-merge:
   Cell said "gate #43 MERGED" but §1.8 #43 still DECLARED (PR #2495 is
   evidence toward promotion, not the promotion event). Same fix:
   reframe as PR-merge evidence accruing toward §1.8 gate promotion;
   canonical status authoritative.

Compile-note also reframed: explicitly distinguishes PR-merge evidence
from §1.8 gate-PASSING promotion. PR-merge events are listed as evidence
accruing toward promotion; canonical gate status varies per §1.8.

Common root: future Monday compiles must mechanically reconcile each
"landed/retired" claim against §1.8 status, NOT PR-merge events.
Discipline recorded in feedback_pm_compile_audits_pre_existing_errors
(updated to include PR-merge-vs-gate-promotion distinction).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls
briansrls deleted the session/calm-koi-214 branch June 1, 2026 18:42
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Verification V1 (TC1 first slice) — re-recreated [Substrate Gate A merged; ready]

1 participant