Skip to content

chore(NA): bump version to 9.5.0#262165

Merged
jbudz merged 21 commits intoelastic:mainfrom
mistic:bump-9.5.0
Apr 18, 2026
Merged

chore(NA): bump version to 9.5.0#262165
jbudz merged 21 commits intoelastic:mainfrom
mistic:bump-9.5.0

Conversation

@mistic
Copy link
Copy Markdown
Contributor

@mistic mistic commented Apr 9, 2026

Usually bump from 9.4.0 to 9.5.0

@mistic mistic self-assigned this Apr 9, 2026
@mistic mistic added chore Team:Operations Kibana-Operations Team release_note:skip Skip the PR/issue when compiling release notes backport:skip This PR does not require backporting v9.5.0 labels Apr 9, 2026
@mistic mistic marked this pull request as ready for review April 9, 2026 05:16
@mistic mistic requested review from a team as code owners April 9, 2026 05:16
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/kibana-operations (Team:Operations)

@macroscopeapp
Copy link
Copy Markdown
Contributor

macroscopeapp Bot commented Apr 9, 2026

Approvability

Verdict: Would Approve

This is a mechanical version bump from 9.4.0 to 9.5.0 with no runtime behavior changes. The changes update version strings in package.json files, rename test archive files to match the new version, and regenerate test fixtures. The large diff is entirely from test snapshot UUID changes.

Macroscope would have approved this PR. Enable approvability here.

@mistic mistic requested a review from jbudz April 9, 2026 05:21
@elastic elastic deleted a comment from elasticmachine Apr 11, 2026
@elastic elastic deleted a comment from elasticmachine Apr 15, 2026
@jbudz jbudz requested a review from a team as a code owner April 17, 2026 21:44
@jbudz
Copy link
Copy Markdown
Contributor

jbudz commented Apr 17, 2026

After https://buildkite.com/elastic/kibana-elasticsearch-snapshot-build/builds/8046 is promoted, we should be able to drop skip-ci

@elasticmachine
Copy link
Copy Markdown
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Metrics [docs]

✅ unchanged

History

cc @mistic

@jbudz jbudz merged commit b7ee9a1 into elastic:main Apr 18, 2026
18 checks passed
kapral18 added a commit to kapral18/kibana that referenced this pull request Apr 19, 2026
* main: (114 commits)
  Fix observability_ai_assistant_tool_call EBT error when connector is an inference endpoint (elastic#263334)
  init on install (elastic#263732)
  [One Workflow] fail-fast TaskRecovery for interrupted runs (elastic#261275)
  [Entity Store] Reset state error after successful task run (elastic#263087)
  [api-docs] 2026-04-19 Daily api_docs build (elastic#264280)
  [UII] Fix integration card row height calculation (elastic#264212)
  [scout] migrate FTR logstash api tests (elastic#262953)
  [StorageIndexAdapter] Set auto_expand_replicas to fix yellow health on single-node ES clusters (elastic#263096)
  [api-docs] 2026-04-18 Daily api_docs build (elastic#264260)
  [Scout] Update test config manifests (elastic#264257)
  [Security Solution][Detection Engine] enables AI rule creation feature flag (elastic#264036)
  [dashboards as code] only validate id on PUT route when creating new dashboard (elastic#264161)
  chore(NA): bump version to 9.5.0 (elastic#262165)
  skip failing test suite (elastic#263649)
  skip failing test suite (elastic#264236)
  [Discover] Convert remaining Enzyme tests to RTL (elastic#259676)
  auto-implement: Labels in model endpoints table of the model details flyout look misaligned (elastic#263770)
  [ci] Promote ES docker image after verification (elastic#263890)
  [Observability:Onboarding] Remove suppress global announcements that was breaking ensemble tests (elastic#264169)
  [Cases][AttachmentV2] Migrate persistable state part 2 - ML and AIOps charts (elastic#262597)
  ...
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport:skip This PR does not require backporting chore release_note:skip Skip the PR/issue when compiling release notes Team:Operations Kibana-Operations Team v9.5.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

6 participants