Repository navigation
docs(close/receipt): P1-B per-GAP manager routing for the 45 in-scope GAP rows - #4065
Merged
Merged
Conversation
…ster Per PM dispatch 2026-05-31 forced-dispatch item 2 (post-P1-A). Walks the 45 GAP rows from §2 of the P1 every-other-task roster (#4060) and routes each to the right manager lane with a concrete close-receipt shape. §3.5.1 — 45-row routing table (task_id × primary × secondary × close-receipt shape) covering every in-scope GAP from §2. §3.5.2 — distribution summary: - Modeling DFS: 20 GAP rows (substrate-fill dominant) - Compiler Spine: 13 (compiler stage + lens) - Target Realization: 5 - Runtime/TestClaim: 4 - Self-host/Release: 3 - TOTAL: 45 = §2 GAP count §3.5.3 — cross-receipt notes: MW-D8 C4, F2 active-skip, T-15 closure all strengthen specific routing rows but don't flip them PROVEN alone. PROVEN re-pass: walked all 45 GAP rows for stealth-DONE evidence; 0 flips. Every row's [SCHEDULED]/[ACTIVE]/no-DONE status from §2 holds on origin/main post-#4060. No fresh ODR/NOT-PROMISED proposals (safety rule honored). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
6 tasks
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Per PM dispatch 2026-05-31 forced-dispatch item 2 (post-P1-A). Appends §3.5 P1-B per-GAP manager routing to
docs/planning/v4-p1-other-task-roster-2026-05-30.md(landed via #4060).§3.5.1 — 45-row routing table: each in-scope GAP row from §2 mapped to (
primary manager,secondary manager,close-receipt shape that would flip the row to PROVEN).§3.5.2 — distribution summary by primary manager:
Modeling DFS carries ~44% of the corpus (substrate-fill dominant), Compiler Spine ~29% (compiler stage + lens). PR #3938 §11 architecture predicted this shape.
§3.5.3 — cross-receipt notes: MW-D8 C4 (
smart-stag-871), F2 active-skip (m1_rust_emit_probe_execution), and T-15 closure each strengthen specific routing rows (T-21, T-24, T-20, T-31, T-32) without flipping themPROVENalone.PROVEN re-pass walked all 45 GAP rows on
origin/mainpost-#4060 for stealth-DONE evidence; 0 GAP-to-PROVEN flips — every row's[SCHEDULED]/[ACTIVE]/ no-DONE status from §2 holds.Safety rule honored: no fresh
ODR/NOT-PROMISEDproposals; classification only.Test plan
.dag, or Rust seed touched — docs-only roster extension.awkto match §2 GAP count.origin/main(no stealth-DONE evidence found for any GAP row).