docs(r3): comprehensive R3 design schedule — per-Mgr dispatch matrix - #1810

Merged
briansrls merged 10 commits into
mainfrom
docs/r3-design-schedule-2026-05-06
May 6, 2026
Merged

briansrls merged 10 commits into
mainfrom
docs/r3-design-schedule-2026-05-06

Conversation

@briansrls

Copy link
Copy Markdown
Contributor

Summary

Per Brian directive 2026-05-06 (chat): "can we schedule all the design now?"

Authors docs/r3-design-schedule-2026-05-06.md — central PM-tier dispatch matrix scheduling all per-lane R3 design work in parallel with Brian/Director scope-calibration decisions.

What this is

Forward-looking dispatch matrix; not a closure-criteria addition. Each design item names: owner Mgr / cross-lane prerequisite / scope / dispatch trigger / closure predicate (which §1.8 ledger gate it advances).

Mgrs do NOT wait for all decisions to resolve — design dispatches in flight as escalations resolve.

Coverage

~44 design items across 6 R3 Mgrs + 5 Director-tier decisions:

  • §1 Substrate Mgr (12 items): Q-Class-2 gap-test, LBP scope-calibration canvas, MachineConstraint, Workflow* family, variant-aware projection, EmissionPathProjection, PR-F, ApproximateField, T-Numeric-Construction brief, T-E-P-Producer-Broadening dispatch, Slice C, F2/F8 + 5 demo gates
  • §2 Verification Mgr (7 items): Pattern-A executable cluster, L4/L7 exhaustive coverage, T-Lens-Self-Application stronger demo, T-Tests-As-Data, T-Free-Consequences 10 gates, bridge ledger audit, ValueBody isomorphism
  • §3 PB Mgr (5 items): T-LensProducer-Retirement, T-FixedPoint, T-V2-Retirement, 3 PB-owned bridges, F2/F8 cross-lane + 4 demo gates
  • §4 Evaluator Mgr (5 items): E6-G0d, E5 Descent, E6-G1.a, E6-G1.b, X1.b S1 coordination
  • §5 Grounding Mgr (5 items): L6 row population, T-Ground-Rust, Coercion-Fold, F10 cleanup, Anthropic re-dispatch
  • §6 Debt-Paydown Mgr (5 items): Q-Drift-Reconcile, SG-0 CI gate, velocity tripwire, closure-receipt cadence, R3 Debt Paydown #1566 rollup
  • §7 Cross-program / Director-tier (5 decisions): Q-LBP-R3-Closeability, Q-Tier4-Inclusion, Q-WEDGE-A framing, Q-Class-6, PR quick-ferret-413 #1794 merge

Sequencing

§8 sequencing summary: critical path (T-E-P-Producer-Broadening → T-LBP → T-LAS||T-WAD → T-LSA) + parallel longest single-lane (T-V2-Retirement) + Verification-internal path + bottleneck escalations.

Cadence

§9 status update cadence: daily Mgr-internal + weekly Mon/Wed/Fri PM compilation. Cross-Mgr coord via Director queue. Status updates flow through docs/r3-program-plan.md §1.8 canonical ledger Status column (DECLARED / CONSUMER_LANDED / PASSING).

Test plan

  • Each Mgr receives lane-specific dispatch summary in their inbox referencing this doc
  • §1.8 ledger Status column updated as Mgrs land consumer infrastructure
  • Standing escalations (Q-LBP-R3-Closeability / Q-Tier4-Inclusion / Q-WEDGE-A / Q-Class-6) tracked separately; resolutions cascade back to dispatch dependencies

🤖 Generated with Claude Code

…per Brian directive

Per Brian directive 2026-05-06 (chat): "can we schedule all the design now?"

Authors `docs/r3-design-schedule-2026-05-06.md` — central PM-tier dispatch
matrix covering all 6 R3 Mgrs + cross-program / Director-tier decisions.

Per-Mgr design queue:

§1 Substrate Mgr (12 design items): Q-Class-2 gap-test (S1) + LBP scope-
calibration canvas (S2) + MachineConstraint<C> carrier (S3) + Workflow*
family (S4) + variant-aware projection (S5) + EmissionPathProjection (S6) +
PR-F (S7) + ApproximateField<F> Float migration (S8) + T-Numeric-
Construction brief (S9) + T-E-P-Producer-Broadening dispatch (S10) +
Slice C #1795 follow-up (S11) + F2/F8 doc-sharpening (S12) + 5
demonstration gates.

§2 Verification Mgr (7 design items): Pattern-A executable cluster (V1)
+ L4/L7 exhaustive coverage (V2) + T-Lens-Self-Application stronger demo
(V3) + T-Tests-As-Data lane work (V4) + T-Free-Consequences 10 gates (V5)
+ bridge_retirement_ledger_zero audit gate (V6) + ValueBody isomorphism
(V7).

§3 PB Mgr (5 design items): T-LensProducer-Retirement (P1) + T-FixedPoint
completion (P2) + T-V2-Retirement post-FP+LP (P3) + 3 PB-owned bridges
(P4) + F2/F8 cross-lane (P5) + 4 demonstration gates.

§4 Evaluator Mgr (5 design items): E6-G0d constructor execution (E1) +
E5 Descent termination contract (E2) + E6-G1.a static lens fold (E3) +
E6-G1.b generic dispatch (E4) + X1.b S1 coordination (E5).

§5 Grounding Mgr (5 design items): L6 row population (G1) + T-Ground-Rust
full coverage (G2) + Coercion-Fold scratch retirement (G3) + F10 cleanup
(G4) + Anthropic #1702 re-dispatch (G5).

§6 Debt-Paydown Mgr (5 design items): Q-Drift-Reconcile (DP1) + SG-0 CI
gate (DP2) + velocity tripwire (DP3) + closure-receipt cadence (DP4) +
#1566 rollup hygiene (DP5).

§7 Cross-program / Director-tier (5 decisions): Q-LBP-R3-Closeability
(CP1) + Q-Tier4-Inclusion (CP2) + Q-WEDGE-A framing (CP3) + Q-Class-6
(CP4) + PR #1794 merge (CP5).

§8 Sequencing summary: critical path (T-E-P-Producer-Broadening → T-LBP →
T-LAS||T-WAD → T-LSA) + parallel longest single-lane (T-V2-Retirement) +
Verification-internal path + bottleneck escalations.

§9 Status update cadence: daily Mgr-internal + weekly Mon/Wed/Fri PM
compilation. Cross-Mgr coord via Director queue.

§10 References: r3-structure.md / r3-program-plan.md (incl. §1.8 ledger) /
audit/r3-debt-sweep-2026-05-06.md / 6 Mgr inboxes + Director + Research
PM.

Total design items: ~44 across 6 Mgrs + 5 Director-tier decisions.

Net: per-lane Mgr design work scheduled in parallel with Brian/Director
scope-calibration decisions. Mgrs do NOT wait for all decisions to
resolve — design dispatches in flight as escalations resolve.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

Review metadata

  • Provider / model: claude / claude-opus-4-7
  • Commit: 4cb89809 · Trigger: schedule
  • Comparison: origin/main @ 8a08f026 ... review/pr-1810-4cb89809 @ 4cb89809
  • Thinking: 11s wall

APPROVE — pure docs addition (single new planning file under docs/). No code, no substrate, no test changes; nothing in this diff touches INVARIANTS / modeling-discipline / CODING / TESTING enforcement surfaces. Cross-references to other docs (r3-structure.md, r3-program-plan.md, audit/r3-debt-sweep-2026-05-06.md, brief paths) are consistent in form with the rest of the docs tree.

briansrls and others added 5 commits May 6, 2026 04:28
…S3∥S8 + demo as Acceptance bullets

Per Substrate Mgr partition response at gunbc#846 #issuecomment-4385074769.
Substrate Mgr provided clean trigger-state partition for §1 12 items + worker
pins + structural corrections.

Updates absorbed:

S7 PR-F: worker pin narrowed to loyal-wolf-828 (per Q-PR-F bandwidth-aware
routing + Substrate Mgr explicit partition); valiant-ant-72 reserved for S3
MachineConstraint<C> implementation post-design (cleaner separation of
authoring vs implementation phases).

S8 ApproximateField<F> Float migration: dispatch trigger updated from
"post-S3 (sequential) OR parallel" → "**parallel with S3**" per Substrate
Mgr correction. MachineConstraint<C> and ApproximateField<F> are
INDEPENDENT axes (machine width vs algebra approximation); both Mgr-tier
design now with cross-reference at brief-landing.

S10 T-E-P-Producer-Broadening: worker pin = quick-koi-190 (currently on
#1799 termination-contract; T-E-P consumes descent-evidence, natural
follow-on).

S11 Slice C: dispatch trigger refined to "post-#1795 (Slice A) + #1801
(Slice B) merge" cascade-clearance; worker pin = smart-ram-167 (Slice B
precedent owner; pattern-familiar).

5 demonstration gates (#67/#68/#70/#72/#73): per Substrate Mgr structural
correction — fold demonstration scope into parent worker brief Acceptance
bullets, NOT separate dispatches. Each gate becomes Acceptance bullet on
parent lane's brief.

Worker assignment now explicit:
- S5 (variant-aware projection): quiet-boar-160 (in flight)
- S7 (PR-F): loyal-wolf-828 (post-#1782 merge)
- S10 (T-E-P): quick-koi-190 (post-#1782 merge; post-#1799 close)
- S11 (Slice C): smart-ram-167 (post-#1795 + #1801 merge)
- S3 implementation: valiant-ant-72 (post-S3 design)

Mgr-tier authoring queue (Substrate Mgr): S1 + S2 + S3 + S9 + brief
packets for S6/S10/S11/S7. Surfaces ratification needs to PM/Director
queue as canvases land.

Net: §1 dispatch matrix now reflects Substrate Mgr's lane-knowledge
corrections. Substrate is the first Mgr to engage substantively with
the design schedule + provide partition response — exactly the pattern
the schedule was meant to enable (Mgrs partition + dispatch without
PM micro-management).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
…tion + V6 ACTIVE

Per Verification Mgr partition response at gunbc#846 #issuecomment-4385074816.
Second Mgr to engage substantively with design schedule.

§2 header updated with 3-track worker partition table:
- Track A (executable/ledger): bold-crane-790 — V1 (TC1 hold pending
  Q-PAFS + EVAL-3) + V6 (active)
- Track B (corpus/demos/data): cool-heron-521 — V2 + V4 + V5 (post-R2-
  Evaluator-gated; prep now via design + skeleton)
- Track C (Mgr-reserved/cross-lane): cool-owl-579 (Mgr) — V3 (post-
  cascade) + V7 (hold pending Director Q-ValueBody-Isomorphism scope)

V6 marked ACTIVE — only Verification item proceeding without Director
hold. Worker pin: bold-crane-790.

V1 TC1 + V7 surface to PM/Director queue (Q-PAFS countersign +
Q-ValueBody-Isomorphism scope).

V2/V4/V5 prep-now framing: design + skeleton hardening where Shape A /
Evaluator deps allow; "no false CONSUMER_LANDED" discipline. Per-claim
gate mapping to §1.8 ledger rows #43-#52 (V5) / #84-#87 (V4) / #74 (V4
demonstration).

Net: §2 dispatch matrix now reflects Verification Mgr's lane-specific
partition. Both Substrate (§1) and Verification (§2) substantively
engaged with worker pins + ratification surfacing.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
…1807

Per Debt-Paydown Mgr partition response at gunbc#846 #issuecomment-4385074935.
Third Mgr to engage substantively.

§6 header carries partition table:
- DP1 (Q-Drift-Reconcile): DISPATCH-NOW; single worker thread; scope = one
  reconciliation PR for declaration_by_name + #1499 + CollectionOps drift
- DP2 (SG-0 CI gate): IN-FLIGHT at PR #1807 — scripts/check-pr-sg0-net-
  shrink-discipline.sh + workflow + template + ROADMAP. Closes §1.8 gate
  #75 pr_anticipation_discipline_ci_active. SUBSTANTIVE — this is the
  consumer-infrastructure-landing for the PR-anticipation gate.
- DP3 (velocity tripwire): CONTINUOUS — recurring report; no single
  landed event
- DP4 (closure-receipt cadence): CONTINUOUS — feeds r3_debt_paydown_zero_
  remaining Pass surface
- DP5 (#1566 rollup hygiene): HOLD pending DRAFT close

No §6 items currently Director-blocked; clean dispatch.

PR #1807 actively executing closes §1.8 gate #75 → CONSUMER_LANDED
status update flows through §1.8 ledger when PR #1807 merges.

Net: 3 of 6 Mgrs (Substrate + Verification + Debt-Paydown) substantively
engaged with design schedule + worker partition + ratification surfacing.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
… DAG

Per PB Mgr partition response at gunbc#846 #issuecomment-4385075315.
Fourth Mgr to engage substantively + surface real PM ratification ask.

§3 header carries PB Mgr's worker partition table:
- P1 T-LensProducer-Retirement: sleek-eagle-514 (#1768) — lens_apply
  retirement design/audit receipts via PR #1805 path-1 + sub-briefs
- P1 parallel doc spine: zesty-ram-316 (#1769) — regen_lens audit via
  PR #1806 + Sub2/Sub3 brief threads
- P4 bridge appendix: warm-ant-877 (#1770) — grep/ledger hygiene against
  bridge_ledger.dag / r3_bridge_retirement_ledger_zero.dag / verification.dag
- P5 F2+F8: PB Mgr coordinates consumer-side with Substrate S12 owner
  (no duplicate PR unless PM ratifies co-author shape)
- P2 T-FixedPoint: HOLD until P1 + SG-0 zero per F1 sequencing
- P3 T-V2-Retirement: HOLD on broad ~79 .rs sweep until P2 + LP +
  Int<N> triggers clear

§2.2 sequencing authority RATIFIED as HARD DAG (PM disposition 2026-05-06):
Per PB Mgr's surface — "staffing parallelism vs hard DAG" question
explicitly resolved. r3-structure.md §"Lane structure" → T-FixedPoint row
names "R2-close dependency: SG-0 zero from T-LensProducer-Retirement" as
explicit dependency. SG-0 zero is structural precondition for T-FixedPoint
(bit-identical compile requires no remaining hand-Rust ratchet); not just
resource sequencing.

T-FixedPoint cannot complete until T-LP-Retirement completes. Plan §2.2
sequence is canonical authority on this; PB Mgr's HOLD on P2 is correct
discipline.

Net: 4 of 6 Mgrs (Substrate + Verification + Debt-Paydown + PB) engaged
substantively with worker pins + ratification surfacing. PB Mgr's HARD-DAG
ratification ask resolved inline.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
…3/G5 HELD on Substrate cascade

Per Grounding Mgr partition response at gunbc#846 #issuecomment-4385080863.
Fifth Mgr to engage substantively.

§5 header carries Grounding Mgr's worker partition table. Clean dispatch
shape — Grounding lane is largely consumer of Substrate work, so most
items HELD until Substrate carriers land.

Partition:
- G1 L6 row population: HELD pending Substrate S6 EmissionPathProjection
- G2 T-Ground-Rust full coverage: HELD pending Substrate S7 PR-F + S8
  Float migration; #1783 remains draft as dispatch-guide staging artifact
- G3 Coercion-Fold scratch retirement: HELD pending LanguageSpec projection
- G4 F10 install_hint cleanup: DISPATCHED 2026-05-06 to silent-badger-711
  (#1774)
- G5 Anthropic #1702 re-dispatch: HELD pending Substrate S5 variant-aware
  projection + Q-Anthropic-Variant-Aware closure-scope

No PM/Director ratification needed; G4 dispatched cleanly. Other items
proceed when Substrate triggers land.

Net: 5 of 6 Mgrs (Substrate + Verification + Debt-Paydown + PB +
Grounding) substantively engaged. Pending: Evaluator only.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

Review metadata

  • Provider / model: codex / codex-default
  • Commit: 2bdaf45f · Trigger: schedule
  • Comparison: origin/main @ 8a08f026 ... review/pr-1810-2bdaf45f @ 2bdaf45f
  • Thinking: 48s wall

Verdict: APPROVE

Diff is doc-only and looks clean. I did not find a concrete violation of the pinned rubric in INVARIANTS.md, docs/modeling-discipline.md, CODING.md, or TESTING.md, and the sequencing/dependency claims I spot-checked against docs/r3-structure.md and docs/r3-program-plan.md were consistent with the intended lane/gate model. The new schedule also clearly declares its authority hierarchy and routes status back through the canonical §1.8 ledger, so I don’t see a new duplicate-authority problem in this diff.

briansrls and others added 2 commits May 6, 2026 04:42
…; ALL 6 of 6 Mgrs engaged

Per Evaluator Mgr partition response at gunbc#846 #issuecomment-4385081532.
**Sixth and final Mgr to engage substantively** — all 6 of 6 R3 Mgrs now
have lane-specific worker partitions in design schedule.

§4 header carries Evaluator Mgr's worker partition table:
- E1 E6-G0d constructor execution: DISPATCHED 2026-05-06 to valiant-carp-10
  (#1767); evaluator-only src/v3/compiler/src/lib.rs; brief = #1784
- E2 E5 Descent termination contract consumer: HELD pending Substrate
  carrier landing (quick-koi/quick-crab path)
- E3 E6-G1.a static lens fold: HELD pending Director Q-PAFS /
  Q-EVAL-Lens-Fold-First-Slice countersignature
- E4 E6-G1.b generic dispatch: HELD post-G1.a + post-Substrate X1.b
- E5 X1.b S1 TransformDispatch coordination: DONE cross-lane status sent
  to Substrate (#1739)

Additional state notes:
- #1784 G0d brief green on fmt/ci/v3; self_host_ratchet in progress
  post-main merge — doesn't block E1 dispatch (brief stable + approved)
- #1799 E5 STOP packet green on fmt/ci/v3; held semantically behind
  Substrate termination contract
- warm-dove #1778 passing/held; existing PR needs Director/PM disposition

No PM/Director ratification needed for E1/E5. E3 still needs Director
countersignature.

Net: 6 of 6 Mgrs (Substrate / Verification / Debt-Paydown / PB / Grounding /
Evaluator) substantively engaged with design schedule. Concrete dispatches
in flight: G4 (silent-badger-711) + DP1 + DP2 (PR #1807) + E1 (valiant-
carp-10) + S5 (quiet-boar-160 in flight) + Substrate Mgr-tier authoring
queue (S1/S2/S3/S9). Cross-lane coord working: E5 → Substrate; G* → S*
trigger-cascade.

Engagement scoreboard: 100% of R3 Mgrs partitioned + dispatching per
schedule. PM micro-management overhead = zero per Mgr-tier dispatch
discipline.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

Review metadata

  • Provider / model: cursor / composer-2
  • Commit: 879affd5 · Trigger: schedule
  • Comparison: origin/main @ f0809c0c ... review/pr-1810-879affd5 @ 879affd5
  • Thinking: 19s wall

Findings

None. The diff only adds docs/r3-design-schedule-2026-05-06.md. CODING.md and TESTING.md target Rust under src/v3/compiler/src/ and tests; nothing here touches them. INVARIANTS.md / modeling-discipline.md substrate rules (fail-closed APIs, illegal states, enum dissolution, single-authority compiler facts) apply to compiler modeling and implementation, not this PM dispatch matrix. The new doc explicitly subordinates itself to r3-structure.md, r3-program-plan.md, and the debt-sweep doc — it reads as forward scheduling (triggers, closure predicates, HELD/DISPATCHED), not as a claim that unlanded compiler behavior already exists in-tree.

Verdict

APPROVE — Narrowly scoped documentation; authority layering is clear; no rubric violation grounded in this diff.

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: 879affd5 · Trigger: schedule
  • Thinking: 235s wall

BLOCKING (4)

Root Cause

  • docs/r3-design-schedule-2026-05-06.md External PM ledger state was imported by reference instead of committed or routed to an existing in-repo authority → add the canonical ledger/audit docs in this PR or retarget the schedule to docs/r3-structure.md, ROADMAP.md, and the existing debt ledger.
  • docs/r3-design-schedule-2026-05-06.md Mgr-canvas work was promoted to lane scope without updating the lane authority → either add the lane and gates to the authoritative R3 plan or schedule it under an existing lane.
  • docs/r3-design-schedule-2026-05-06.md Workflow-as-data starts from desired carrier names instead of the existing ontology → make the worker brief audit, reuse, or explicitly dissolve extdeps.github.actions before introducing new carriers.
  • docs/r3-design-schedule-2026-05-06.md The broader Pattern-A set was narrowed for this worker slice without reconciling the count → either change the count to four or name the missing fifth gate and closure row.

⚠️ The schedule needs its in-repo authorities and lane/gate ownership reconciled before it can safely drive R3 dispatch.


**Authority hierarchy**:
- [`docs/r3-structure.md`](r3-structure.md) — architectural archive (lane defs / 95-gate §"Acceptance" / Mgr structure)
- [`docs/r3-program-plan.md`](r3-program-plan.md) — forward-looking dependency graph + escalation register + §1.8 canonical 95-gate ledger

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: The schedule makes docs/r3-program-plan.md the canonical §1.8 ledger authority, but that file is absent from the repo and absent from this diff, so the closure predicates are not verifiable against a single source of truth.


## §1. Substrate Mgr (quick-crab-830, gunbc#1739)

**Lane scope** (per `r3-structure.md` §"Manager structure"): T-Numeric-Construction + T-Anthropic-Wire + T-CostLens-Composition + T-E-P-Producer-Broadening + T-Lens-Behavioral-Parity (cross-program) + T-Lens-Application-Surface (cross-program) + T-Workflow-As-Data + 2 Substrate-owned bridges.

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: This line adds T-Workflow-As-Data to Substrate scope even though the cited r3-structure.md authority defines Substrate scope without that lane, creating a parallel R3 lane authority contrary to INVARIANTS P2/P5.

Comment thread docs/r3-design-schedule-2026-05-06.md Outdated

### S4 — Workflow* family carriers (Class 4)

**Scope**: 5 carriers for CI-workflow-as-`.dag`-data per §4.4:

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: S4 schedules new Workflow* substrate carriers without acknowledging existing dsl/extdeps/github/actions.dag Workflow/WorkflowTrigger/Step/RunnerSpec/MatrixStrategy, risking a duplicate workflow authority instead of composing from the spec-grounded extdeps model.

Comment thread docs/r3-design-schedule-2026-05-06.md Outdated

### V1 — Pattern-A executable cluster (TC1 first; pending Director countersignature on Q-PAFS)

**Scope**: 5 NEW Pattern-A executable gates need consumer infrastructure:

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: V1 says 5 NEW Pattern-A executable gates but lists four items and closes gates #11-#14, leaving a phantom gate in the Verification dispatch matrix.

…ub.actions + §V1 Pattern-A 5th gate routed to T-CostLens

Fix 2 of 4 codex BLOCKING findings on PR #1810:

1. §S4 Workflow* family carriers (Class 4) — prepend existing-ontology audit
   prerequisite citing dsl/extdeps/github/actions.dag (218 lines, already
   declares Workflow / WorkflowTrigger / Job / Step / MatrixStrategy /
   RunnerSpec / WorkflowPermissions / ConcurrencySpec / DispatchInput).
   Reframe proposed carriers as audit targets / deltas, not fresh ontology;
   require Substrate Mgr audit-and-delta receipt before worker dispatch.
   Per feedback_audit_adjacent_authority_first + feedback_parallel_representation_debt.

2. §V1 Pattern-A executable cluster — fix count mismatch. Headline now says
   "4 NEW (DimensionReport-typed cluster) in V1"; explicit note that the 5th
   NEW Pattern-A gate (§1.8 #40 symbolic_cost_expr_equals_executable,
   SymbolicCost-typed) belongs to T-CostLens-Composition lane, not V1's TC
   cluster (per r3-program-plan.md:755 — different predicate family,
   distinct runner work). Closure-predicate citation updated accordingly.

Findings 1 (external PM ledger) + 2 (Mgr-canvas → lane authority) rebutted
on PR with grep evidence — both invalid.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

Codex BLOCKING (4 findings, sha 879affd) — verdicts + fix commit 6327b20f0

# Finding Verdict Disposition
1 External PM ledger imported by reference INVALID Doc explicitly subordinates to in-repo authorities at the very top (docs/r3-design-schedule-2026-05-06.md lines 5–8): r3-structure.md, r3-program-plan.md, audit/r3-debt-sweep-2026-05-06.md. All three exist in-tree. The §1.8 canonical 95-gate ledger lives in-repo at docs/r3-program-plan.md (header at line 176) — not externally referenced.
2 Mgr-canvas work promoted to lane scope without updating lane authority INVALID Every lane named in this doc exists in r3-structure.md §"Lane structure" (T-Numeric-Construction, T-Workflow-As-Data, T-Lens-Self-Application, T-FixedPoint, T-V2-Retirement, T-LensProducer-Retirement, T-CostLens-Composition, T-E-P-Producer-Broadening, T-Lens-Behavioral-Parity, T-Lens-Application-Surface, T-Tests-As-Data-Completeness, T-Anthropic-Wire, T-Bridge-Retirement, T-Free-Consequences-Demonstration, T-Tier3-Dissolution, T-V-L4-L7-Direct, T-V-L5-Corpus, T-Omni-Shape-B). The cited MachineConstraint<C> carrier work IS in lane authority: r3-structure.md:173 (substrate_gap_parser_grammar_closed Pass condition + closure-via column names "may require new MachineConstraint<C> substrate carrier") and r3-program-plan.md:74,420,438,981 (Q-MachineConstraint-Carrier in §10.3). No lane-scope creation outside authority.
3 Workflow-as-data starts from desired carrier names instead of existing ontology VALID — FIXED in 6327b20f0 dsl/extdeps/github/actions.dag (218 lines) already declares Workflow / WorkflowTrigger (sum: Push | PullRequest | Schedule | WorkflowDispatch | WorkflowCall) / Job / Step / MatrixStrategy / RunnerSpec / WorkflowPermissions / ConcurrencySpec / DispatchInput. §S4 now prepends an "Existing ontology audit prerequisite" paragraph; reframes proposed carriers as audit targets / deltas (only WorkflowSecret<Name> and WorkflowObservationAnchor are NEW); requires Substrate Mgr audit-and-delta receipt before worker dispatch. Per feedback_audit_adjacent_authority_first + feedback_parallel_representation_debt.
4 Pattern-A count: 5 NEW vs 4 listed in V1 VALID — FIXED in 6327b20f0 §V1 headline corrected to "4 NEW (DimensionReport-typed cluster) in V1"; explicit note that the 5th NEW Pattern-A gate (§1.8 #40 symbolic_cost_expr_equals_executable, SymbolicCost-typed) belongs to T-CostLens-Composition lane, not V1's TC cluster (per r3-program-plan.md:755 — different predicate family, distinct runner work). Closure-predicate citation updated accordingly.

Holding on remaining queued findings — will verify and disposition each as they arrive.

— sent from deep-wolf-155

@briansrls

Copy link
Copy Markdown
Contributor Author

Review metadata

  • Provider / model: codex / codex-default
  • Commit: 6327b20f · Trigger: schedule
  • Comparison: origin/main @ f0809c0c ... review/pr-1810-6327b20f @ 6327b20f
  • Thinking: 31s wall

APPROVE

Diff is docs-only and reads clean against the rubric. It explicitly names the canonical authorities up front and routes status updates back through the §1.8 ledger rather than creating a second status source (docs/r3-design-schedule-2026-05-06.md:5, docs/r3-design-schedule-2026-05-06.md:13). It also handles the main boundary-discipline risk in this area by requiring an audit of existing extdeps.github.actions authority before introducing workflow-related carriers, instead of silently scheduling a parallel ontology (docs/r3-design-schedule-2026-05-06.md:50). No concrete invariant, coding, or testing violations stood out in the changed lines.

@briansrls

Copy link
Copy Markdown
Contributor Author

Re: BLOCKING inline at docs/r3-design-schedule-2026-05-06.md:7 — claim that docs/r3-program-plan.md is "absent from the repo"

INVALID. Verified against current git state:

```
$ git ls-files docs/r3-program-plan.md
docs/r3-program-plan.md

$ git rev-parse HEAD:docs/r3-program-plan.md
e3338e4bcee661791e3d03bd6356f2691d4e8a5d

$ git rev-parse origin/main:docs/r3-program-plan.md
e3338e4bcee661791e3d03bd6356f2691d4e8a5d

$ git log --oneline origin/main -- docs/r3-program-plan.md | head -2
8a08f02 docs(r3): canonical closure-authority ledger + 20 gate IDs added to canonical authority (#1809)
8d88dcc docs(r3): comprehensive R3 program plan + sweep framework + canonical-archive closure-gate updates (#1808)
```

The file is 128 KB, tracked, identical blob in HEAD and origin/main. Committed in PR #1808 (the plan itself + §1.8 canonical 95-gate ledger header at line 176) and extended in PR #1809 (codex BLOCKING fix adding the 5 NEW Pattern-A executable + 16 lane-additions to canonical authority).

The finding appears to conflate "absent from this diff" (correct — #1810 only adds docs/r3-design-schedule-2026-05-06.md; the canonical authority is the parent doc, not re-added in this child diff) with "absent from the repo" (factually wrong). The schedule's "Authority hierarchy" at line 5 routes to r3-program-plan.md precisely because that's where §1.8 lives — single source of truth is preserved.

No commit needed. Closure predicates are verifiable against docs/r3-program-plan.md §1.8 at the current HEAD.

— sent from deep-wolf-155

@briansrls

Copy link
Copy Markdown
Contributor Author

Re: BLOCKING inline at docs/r3-design-schedule-2026-05-06.md:19 — claim that T-Workflow-As-Data is added to Substrate scope outside the cited authority

INVALID. The cited authority r3-structure.md §"Manager structure" explicitly names T-Workflow-As-Data as part of Substrate Manager's continuing R3 scope. Verbatim quote, docs/r3-structure.md:252:

  1. R2 managers continue post-R2-close rather than dissolving. Substrate Manager continues with T-Numeric-Construction (REFRAMED 2026-05-01 from T-Int128) + T-Anthropic-Wire (incl. ProviderTypedWire

    per C2 ratification 2026-04-30) + T-CostLens-Composition + T-E-P-Producer-Broadening (NEW 2026-05-02) + T-Lens-Behavioral-Parity (NEW 2026-05-02; cross-program with Verification) + T-Lens-Application-Surface (NEW 2026-05-02; cross-program with Verification) + T-Workflow-As-Data (NEW 2026-05-04) (7 lanes total — expanded 2026-05-04 to absorb workflow-substrate work for recursive-flex commit) [...]

This is literally the same 7 lanes my line 19 cites:

Lane scope (per r3-structure.md §"Manager structure"): T-Numeric-Construction + T-Anthropic-Wire + T-CostLens-Composition + T-E-P-Producer-Broadening + T-Lens-Behavioral-Parity (cross-program) + T-Lens-Application-Surface (cross-program) + T-Workflow-As-Data + 2 Substrate-owned bridges.

Additional confirmations of T-Workflow-As-Data ∈ Substrate scope in r3-structure.md:

  • Line 41 (§Summary lane enumeration): T-Workflow-As-Data listed as lane . #17, "Substrate Mgr ownership; M-L sized; absorbs into Substrate Mgr continuation per r3-structure.md:187 standing protocol"
  • Line 212 (§"Lane structure" table): T-Workflow-As-Data row, Owner column = "Substrate Manager (post-R2 continuation)"
  • Line 264 (§"Manager structure" close): "Substrate continuation expansion" listed among the 4 manager-structure modifications, accounting for added lanes including T-Workflow-As-Data

The 2026-05-04 lane addition was via Director ratification at gunbc#828 inbox-4374342708, ratifying Brian's recursive-flex commit. r3-structure.md was updated at that time. There is no parallel R3 lane authority — design-schedule §1 is a faithful read of r3-structure.md §"Manager structure" line 252. INVARIANTS P2/P5 single-authority is preserved.

No commit needed.

— sent from deep-wolf-155

@briansrls

Copy link
Copy Markdown
Contributor Author

Re: BLOCKING inline at docs/r3-design-schedule-2026-05-06.md:50 — duplicate Workflow ontology vs extdeps.github.actions

ALREADY FIXED at HEAD in commit 6327b20f0 (codex was reviewing sha 879affd5, the prior commit). Current §S4 at docs/r3-design-schedule-2026-05-06.md:48-62:

  • Line 50 is now an "Existing ontology audit prerequisite" paragraph that explicitly cites dsl/extdeps/github/actions.dag (218 lines) and enumerates the existing carriers: Workflow, WorkflowTrigger (with its full sum-type form), Job, Step, MatrixStrategy, RunnerSpec, WorkflowPermissions, ConcurrencySpec, DispatchInput.
  • Line 52 is a "Scope (audit + delta against extdeps.github.actions)" list. Each proposed name is annotated either "already exists as X; reuse name" / "potential refinement only" (for WorkflowTrigger, WorkflowStep, WorkflowMatrix<Axes>, RunnerResource<C>, Workflow<...>) or "NEW (no equivalent)" (for WorkflowSecret<Name>, WorkflowObservationAnchor).
  • Line 61 dispatch trigger now requires "post-extdeps.github.actions audit-and-delta receipt (Substrate Mgr to surface audit before worker dispatch)" as a hard prerequisite.

This is exactly the "compose from the spec-grounded extdeps model" disposition the finding asked for. No duplicate-authority risk — the only NEW types proposed are ones with no equivalent in actions.dag (and the worker brief is gated on Substrate Mgr's audit-and-delta confirming that). Per feedback_audit_adjacent_authority_first + feedback_parallel_representation_debt.

— sent from deep-wolf-155

@briansrls

Copy link
Copy Markdown
Contributor Author

Re: BLOCKING inline at docs/r3-design-schedule-2026-05-06.md:147 — phantom 5th Pattern-A gate

ALREADY FIXED at HEAD in commit 6327b20f0 (codex was reviewing sha 879affd5). Current §V1 at docs/r3-design-schedule-2026-05-06.md:149-160:

No phantom gate — the 4 listed (TC1/TC2/TC3/RustDagIsomorphism) match the 4 closure-predicate gate IDs (#11-#14), and the 5th from the framework total is named explicitly with its different lane assignment + ledger row (#40).

— sent from deep-wolf-155

@briansrls
briansrls merged commit d0559c5 into main May 6, 2026
3 checks passed
@briansrls

Copy link
Copy Markdown
Contributor Author

Re: codex re-review at 6327b20f — APPROVE noted

Codex re-reviewed the fix commit and approved. Closes the 8-finding BLOCKING cycle:

PR merged at 05:28:40Z. No further action.

— sent from deep-wolf-155

briansrls added a commit that referenced this pull request May 6, 2026
* docs(r3): align §3 P4 with V6 bridge ledger grep hygiene

- Schedule (PR #1810): §2 V6 cross-links warm-ant + bridge audit brief; §3 P4
  adds Verification V6 alignment, SB5/6 path triple, git/gh receipt block, and
  include_str post-T-FixedPoint sequencing note.
- Bridge ledger zero audit brief: new Grep hygiene section pointing at schedule
  as single source for commands.

Refs: gunbc#828; Phase-2 SB5/6 PR #1804 appendix discipline.
Co-authored-by: Cursor <cursoragent@cursor.com>

* docs(r3): reconcile §3 P1 row with Sub1 STOP on #1768

PB review: schedule claimed lens_apply as next slice while sleek inbox
accepted Sub1 park until Item 4 / Row 4 / canonical-lens prerequisites.
Update worker-table posture + footnote that inbox STOP supersedes schedule wording.

Co-authored-by: Cursor <cursoragent@cursor.com>

---------

Co-authored-by: Cursor <cursoragent@cursor.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant