MGMT-21659: clarify conditions for starting the cluster install - #242
Merged
Merged
Red Hat Konflux / Red Hat Konflux / assisted-chat-saas-main-check-ecp / assisted-chat-saas-main
succeeded
Nov 3, 2025 in 7m 17s
Succeeded
Integration test for snapshot assisted-chat-saas-main-ck6wj and scenario assisted-chat-saas-main-check-ecp has passed
Details
- Pipelinerun: assisted-chat-saas-main-check-ecp-r89lr
| Task | Duration | Test Suite | Status | Details |
|---|---|---|---|---|
| verify | 28s | ✔️ 110 success(es) |
Loading