Use the default multiprocessing pool configuration. #3188
Triggered via pull request
November 15, 2024 20:27
Status
Failure
Total duration
43m 30s
Artifacts
–
ci.yml
on: pull_request
Check GitHub Organization
0s
Matrix: linux-tests
Matrix: mac-tests
tox -e format-check,lint-check,typecheck,enum-check,vendor-check,package,docs
10m 31s
Gather Final Status
0s
Annotations
20 errors
./dtox.sh -e py314-pip24_3_1-integration --shard 2/2
Process completed with exit code 1.
|
./dtox.sh -e py313-pip24_3_1-integration --shard 2/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py313-pip24_3_1-integration --shard 1/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py313-pip24_3_1-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 1/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e pypy310-pip24_3_1
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e pypy310-pip24_3_1
The operation was canceled.
|
./dtox.sh -e pypy310-pip24_3_1-integration --shard 2/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e pypy310-pip24_3_1-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py38-pip22_3_1-integration --shard 1/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py38-pip22_3_1-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 2/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e pypy310-pip24_3_1-integration --shard 1/2
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e pypy310-pip24_3_1-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e py27-pip20-integration
The job was canceled because "py314-pip24_3_1-integra_2" failed.
|
./dtox.sh -e py27-pip20-integration
The operation was canceled.
|
tox -e py313-pip24_3_1-integration --shard 2/2
Process completed with exit code 1.
|
tox -e py313-pip24_3_1-integration --shard 1/2
The job was canceled because "_3_13_py313-pip24_3_1-i_2" failed.
|