test/extended/prometheus: temporarily disable scheduler metrics checks#22574
Conversation
|
For explanation: all of the PRs referenced in the comment need to be merged for this test to be green again, so we're disabling it, waiting to see the PRs go green, and then re-enabling it. |
|
/lgtm |
|
We need this to avoid the chicken and egg problem switching over scheduler metrics to secure ports. /lgtm |
|
(as a follow up, the monitoring config for the scheduler and controller-manager will be moved out of the cluster-monitoring-operator to the respective second level operator, as each team/component owns its own monitoring configuration, then situation like this won't have to involve the monitoring team in the future) |
|
/lgtm |
|
[APPROVALNOTIFIER] This PR is APPROVED This pull-request has been approved by: brancz, mfojtik, s-urbaniak, sttts The full list of commands accepted by this bot can be found here. The pull request process is described here DetailsNeeds approval from an approver in each of these files:
Approvers can indicate their approval by writing |
|
/test e2e-aws-serial |
|
/retest |
5 similar comments
|
/retest |
|
/retest |
|
/retest |
|
/retest |
|
/retest |
/cc @brancz @sttts @paulfantom