Repository navigation
Numeric grounding lane - #7245
Closed
gunbai-bot[bot] wants to merge 34 commits into
Closed
gunbai-bot[bot] wants to merge 34 commits into
gunbai-bot[bot] wants to merge 34 commits into
Conversation
… checkpoint table Fixes the WIP commit's uncommitted edit to 05_emit_rust.dag.
# Conflicts: # src/v2/std/integer.dag
…ssion/eager-crane-304
…sign-off Regenerated via gunbc generated_artifact_gate main_wet after editing the single-authority source (dag/gunbc/design_document.dag) — a hand-edit of DESIGN.md alone drifts and gets reverted by CI auto-heal. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
The header still read DRAFT / no-implementation-until-signed while DESIGN.md already recorded the sign-off and this same PR lands the implementation — two authorities on one lane (cursor/composer-2.5 review on #7197). Flip to SIGNED + IMPLEMENTED, matching DESIGN.md.
Addresses cursor/composer-2.5 REQUEST_CHANGES (review on PR #7197): DESIGN.md/design_document.dag DRAFT+SIGNED contradiction already fixed in ca3e1e3/b5066db2e0; this closes the second finding — §5 still threatened "not accepted as a fix" with no before/after receipt. Fills in the actual post-fix measurement: COPRODUCT_NATIVE_NUMERIC marker zero across all 7 deep-seven modules, materialization_carriers Measure residue named and handed off, not absorbed. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Per sharp-bee-290 mandate msg_7a83651e — state the completion construction once (§0), instantiate at additive strength (GroupCompletion, done) and multiplicative strength (FieldOfFractions, model signed, realization drafted for sign in §7.3). No v2 fork exists for FieldOfFractions (confirmed by corpus grep), so §7.2 has no de-fork step, unlike §7.1's GroupCompletion specimen. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
…for this PR) An auto-commit swept a local verification edit (bodying FieldOfFractions to test seed-build-greenness per sharp-bee-290's mandate) into this branch. The experiment is done and its result reported out-of-band; the actual model change lands in a fresh PR after #7197 merges, per explicit sequencing instruction not to perturb this PR's review state. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Fixes the orphan-doc pre-push gate (doc_graph_has_no_orphan_docs) that was blocking push after the wall design note landed unlinked. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
…dmap_css re-pin, migration-debt ratchet updates)
The merge of origin/main into session/eager-crane-304 resolved DESIGN.md/ design_document.dag conflicts by taking main's side, which dropped the branch's own bullet linking docs/plans/groupcompletion-pair-construction-design.md, orphaning it and failing the doc-reachability CI gate. Add an accurate (not-yet-merged) status bullet back to the numeric-tower open-thread with the link, and regenerate DESIGN.md via main_wet.
Contributor
Author
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Auto-opened by session-dashboard for session
witty-otter-765.Pushing to
session/witty-otter-765advances this PR.Worker attestation
Before flipping this PR to ready for review, confirm each item:
npm test,cargo test) and the result.Closes #Ndirective.Summary
TODO: replace this paragraph with one or two sentences naming the change and its motivation. Reviewers read this first.
Test plan