Skip to content

Go worksheets post-#4149 reconciliation (R2b int64 anchor, SG-1 §3.1 dual-name, Go RCA lane) - #4195

Closed
briansrls wants to merge 4 commits into
mainfrom
session/zesty-otter-480
Closed

briansrls wants to merge 4 commits into
mainfrom
session/zesty-otter-480

Conversation

@briansrls

Copy link
Copy Markdown
Contributor

Auto-opened by session-dashboard for session zesty-otter-480.
Pushing to session/zesty-otter-480 advances this PR.

Worker attestation

Before flipping this PR to ready for review, confirm each item:

  • Title describes the change (not the session id or branch).
  • PR body summarises what and why (replace the TODO below).
  • Tests run: name the command (e.g. npm test, cargo test) and the result.
  • If this closes a work item, the body contains a Closes #N directive.
  • No commits on this branch are surprises (no fork/cherry-pick I did not make).
  • No secrets / credentials / large binaries staged.

Summary

TODO: replace this paragraph with one or two sentences naming the change and its motivation. Reviewers read this first.

Test plan

  • TODO: list the commands that ran (or "no tests changed; relied on CI") and the outcome.

@briansrls
briansrls marked this pull request as ready for review June 1, 2026 13:36

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: d8abdb8b · Trigger: schedule
  • Thinking: 236s wall

Non-blocking — Strengths

  • docs/planning/v4-go-leaf-model-verification-worksheet-2026-06-01.md R2b now consistently anchors on go_facts_int64, matching the int64 fixtures and Go integer-overflow semantics at https://go.dev/ref/spec#Integer_overflow.
  • docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md The SG-1 dual-name text keeps TargetAtomRealization as the single row authority while making the leaf-model fact_id projection explicit.

✅ Docs-only reconciliation is consistent with the thesis, P2/P5, and the inspected v4 Go/Rust authority patterns; no blocking concerns found.

@briansrls

Copy link
Copy Markdown
Contributor Author

Review metadata

  • Provider / model: openai-pro / gpt-5-5-pro
  • Commit: d8abdb8b · Trigger: manual
  • Comparison: main @ 9e33792c ... session/zesty-otter-480 @ d8abdb8b
  • Conversation: View conversation

1. Story of the diff

This PR is a post-#4149 planning reconciliation for the Go worksheet lane. It fixes the Go R2b leaf-model path so the claim no longer says “platform int overflow” while the fixture is actually an int64 overflow exercise: the CI runner worksheet, verification worksheet, and authority map now all route R2b through leaf_model_claim_go_r2b_int64_silent_overflow_truncates and the go_facts_int64 bundle, while leaving R2a on platform go_facts_int as before.

The second thread is SG-1 naming/dispatch cleanup for Go TargetAtomRealization: the worksheet now makes the Rust-style dual-name pattern explicit, with go_target_atom_realization_symbol as the actual TargetAtomRealization row and go_atom_realization_symbol as the fact-id symbol consumed by leaf-model R3. That is paired with a lane ownership clarification: Arbiter owns the shared carrier shape, while Go RCA owns the Go rows, fact ids, and emit-consumption dispatch.

2. Invariant categories

  1. LAYER MODEL (substrate vs implementation).

Compliant — the diff is documentation/planning only, but it is substrate-adjacent because it directs future go.dag facts. The important modeling decision is correct: R2b is anchored to the width-specific go_facts_int64 bundle rather than the platform-int go_facts_int bundle at docs/planning/v4-go-leaf-model-verification-worksheet-2026-06-01.md:139 and reinforced at :143/:175. The SG-1 side also preserves the shared substrate carrier by saying src/v4/std/target_model.dag remains canonical and by reusing TargetAtomRealization rather than creating a Go-local carrier at docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md:5, :70-73, and :92.

  1. INVARIANTS.md + modeling-discipline.md.

Compliant — P1/P2 are handled directly. P1 modeling faithfulness is improved because the claim now matches the fixture width: go_facts_int64 + int64 source, with R2a explicitly remaining on platform go_facts_int at docs/planning/v4-go-leaf-model-verification-worksheet-2026-06-01.md:139 and :143. P2 single-authority is also handled: the SG-1 worksheet says go_atom_realization_symbol is a fact id naming the go_target_atom_realization_symbol row, i.e. one row with two named projections, at docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md:48-49 and :70-73. This is shared reads of one resolved fact, not parallel representations. The diff introduces no coproducts, predicate helpers, walkers, hand-rolled validators, or undeclared sums.

  1. CODING.md.

Compliant — no Rust implementation code is changed. For the Markdown planning surface, the new prose is load-bearing and compact: docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md:66-73 adds a role/consumer table instead of a long explanatory block, and :86 replaces a potentially ambiguous “Coordination” handoff with a concrete dispatch boundary. I do not see comment/prose bloat that would obscure the decision being made.

  1. TESTING.md.

N/A — this is a worksheet/authority-map reconciliation, not executable code or a landed .dag claim implementation. The diff does update the downstream test/CI contract by changing the R2b runner row to the new claim id at docs/planning/v4-go-leaf-model-ci-runner-worksheet-2026-06-01.md:59 and by keeping R2b on go run/go test only at docs/planning/v4-go-leaf-model-verification-worksheet-2026-06-01.md:139-143; no same-PR test is required for a planning-only rename/anchor correction.

  1. LOCKED DESIGN DECISIONS.

N/A — the PR does not edit a locked design document or alter a locked carrier shape. It preserves the high-level target-model direction: target facts remain modeled in go.dag, and the shared TargetAtomRealization carrier remains in src/v4/std/target_model.dag.

  1. TRACKED vs UNTRACKED DEBT.

Compliant — I do not see new unbounded TODOs, temporary scaffolds, or “later” shapes. The only staged dependency is explicit and bounded: the R3-external dependency requires both go_target_atom_realization_symbol and go_atom_realization_symbol to land together or in the same implementation wave at docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md:16-18, with the checklist repeating the dual-name receipt and Go RCA dispatch ownership at :95-96.

2.5. Top-down PM intent review

Compliant — this PR strengthens the PM-level intent rather than diluting it. The thesis requires target primitives and target realization to be structurally modeled, with target grounding failing closed rather than falling back to name-keyed shortcuts; the R2b change makes the Go worksheet’s proof surface match the actual int64 fixture instead of claiming a platform-int fact. chatgpt-review-aa834e4c-12d3-43…

The SG-1 clarification also fits the “model local, derive global” intent: Go authors its target row and fact id once, while consumers read the appropriate projection instead of inventing a second carrier. The diff’s lane change does not postpone the work or create permanent scaffolding; it assigns Go-specific rows and emit consumption to Go RCA while keeping the shared carrier under Arbiter ownership at docs/planning/v4-go-target-atom-realization-worksheet-2026-06-01.md:86.

3. Verdict

APPROVE. The diff consistently reconciles the Go R2b width anchor and the SG-1 dual-name contract across the affected planning surfaces, without introducing new substrate shapes, parallel carriers, untracked debt, or implementation/test drift.

@briansrls

Copy link
Copy Markdown
Contributor Author

Closing as SUPERSEDED. These were Jun-1 planning worksheets (Go leaf-model/target-atom-realization/CI-runner). The emit-ladder authority is now ctrl#1489 (the 8-tier ladder); per the doc-authority ledger principle these worksheet docs are not a parallel ledger to maintain. Go target work routes through the T1+ ladder under Mgr-SPINE. Operator-authorized close (via still-raven-546).

@briansrls briansrls closed this Jun 8, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant