docs(planning): v4 dep graph refresh 2026-05-31T06:30Z — post-cascade snapshot + #4091 anchor - #4094

Merged
briansrls merged 2 commits into
mainfrom
session/pm-dep-graph-2026-05-31T06
May 31, 2026
Merged

briansrls merged 2 commits into
mainfrom
session/pm-dep-graph-2026-05-31T06

Conversation

@briansrls

@briansrls briansrls commented May 31, 2026 •

Copy link
Copy Markdown
Contributor

Summary

Forward-projection refresh of the v4 predicate dependency graph for the 2026-05-31 wave-collapse window. Supersedes #4058 baseline for current state; #4058 retained for historical baseline.

Operator requested a fresh dep graph for upcoming/current progress + asked for references to #4091 (in-flight elastic CI redesign exploration).

What changed since #4058 (2026-05-30T00:48Z baseline)

Critical paths forward

Decisions named for operator

  • P2-B bridge deletion authorization
  • Structural-bridge replacement dispatch (coordinate with CI #4091 ratification)
  • CI #4091 ratification posture

Cross-refs

Test plan

  • Docs-only change; no code paths exercised
  • CI: expect fmt + discipline + affected to pass; ci_v4 SKIPPED on docs-only diff
  • Cursor + Claude dashboard review for accuracy on predicate state + CI #4091 alignment

🤖 Generated with Claude Code

… snapshot + #4091 anchor

Forward-projection update to docs/planning/v4-predicate-dependency-graph-2026-05-30.md (#4058) for the
2026-05-31 wave-collapse window. Captures: P2 scope (a) PROVEN via P2-A probe (44-source compiler
closure, 0 diagnostics, no bridge); P3 7951→6991 rustc with 8 receipt-producing classes routed per
#4086 catalog; P5-PROVEN 2/3 gates closed (Wa-1 #4079 + P5-D tranche-2 #4089 LANDED); Wave 1 EXIT
achieved via #4082. Names Path A (P5 final-flip) as shortest critical path forward; identifies P2-B
bridge deletion + structural-bridge replacement as latent operator gates. References #4091 elastic
CI redesign exploration at §3.5 / §6 / §8 / §9 / §10 so any structural-bridge replacement authoring
aligns with the in-flight design rather than being re-shaped post-ratification.

Definitions cited per src/v4/TASKS.md:806-817. Authoritative state defers to merry-badger burn-down,
sharp-otter MW-D8 ledger + P1 roster + post-SG-1 catalog (#4086), and quick-tern's tranche state.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@briansrls
briansrls marked this pull request as ready for review May 31, 2026 06:35
… split + dispatch board + watchlist

Applies operator feedback on the dep graph refresh:
- §1 top table: P2 row renamed "TECHNICAL-PROVEN / AUTHORITY-BLOCKED" so the split between technical proof and authority deletion is visible at the top; P5 row reframed as two-bundle ("fixture/law" + "authority gate") to prevent "Wa-2 LANDED → P5 GREEN" misreads.
- §3.2 P2: explicit Layer 1 / Layer 2 framing matching the top table; P2-B authorization listed as decision-node.
- §3.3 P3 table: adds `state` column (routed / worksheet-needed / authoring / in-review / route-pending) + explanatory note on the 9-rows-for-8-classes structure cursor flagged on the prior commit.
- §3.5 P5: Layer 1 fixture/law bundle 3/3 CLOSED (Wa-2 #4080 dca5ce7 LANDED while operator was writing feedback); Layer 2 authority gate OPEN; explicit anti-misread sentence.
- §4 Path A: step 1 marked complete; structural-bridge step references #4091 §3.
- §6.5 NEW Current Dispatch Board: priority-ordered table per operator suggestion (Wa-2 done; structural-bridge DFS unstaffed; P2-B operator-gated; SG-RC-LAYERING authoring; SG-6 #4085 in cursor RC; SG-1b routed; #4091 ratification posture).
- §7: inverted "no dispatches needed" framing to name the two authoring blockers (SG-RC-LAYERING + structural-bridge replacement) as active items to monitor/escalate; operator-gated decisions surfaced.
- §8: removed Wa-2 risk (closed); added explicit "first concrete CiUpsertStep replacement under #4091" framing for the structural bridge.
- §10 renamed "Forecast (pre-bed read)" → "Watchlist (receipt-state, not time-based)" per operator's no-timeline discipline; consolidated PM-actionables into "decisions blocking forward progress" so it reads as receipt-state rather than time-adjacent.

No code paths changed; docs-only.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@briansrls
briansrls merged commit 7a25f9b into main May 31, 2026
10 checks passed
briansrls added a commit that referenced this pull request May 31, 2026
… graph refresh (#4096)

Reflects two state changes from 2026-05-31T06:28-07:04Z:

1. **#4091 elastic CI redesign MERGED** (squash c05a5a8, 07:04Z) — flips from "draft / exploration" to ratified substrate authority across §3.5 (P5 Layer 2 framing), §6 (blockers table), §6.5 (dispatch board priority 7), §7 (operator-gated decisions list), §8 (risk section), §9 (cross-refs), §10 (watchlist).

2. **Wave 2 TR-lane COMPLETE** — SG-6 #4085 MERGED 06:28Z (squash 2ac52f2); lively-eagle archived. Updates §6.5 priority 5 from "cursor RC" to "LANDED ✓ + Wave 2 TR-lane COMPLETE".

3. **proud-pike scope clarification (msg_6287177d)**: #4095 elastic compute fabric DFS worksheet is scoped to `dsl/std` + `v4.std` substrate vocabulary only (per #4091 §4.0f/§4.0g); explicitly out-of-scope for `ci.dag`/`ci.yml`/shell bridge deletion. Separate downstream §10.0 worksheet still required for structural-bridge replacement — the "first concrete CiUpsertStep replacement under #4091" per operator framing. §3.5 + §6 + §6.5 updated to reflect.

4. **Operator decisions resolved per #4094 review**: D3 (SG-RC vs SG-1b prioritization) = PARALLEL (proud-pike confirms separate sibling worksheet, not amendment); D5 (CI risk posture) = operational nuisance NOT merge-blocker until ci_v4 fail-rate climbs above ~1-in-3.

5. **sharp-otter M2 probe dispatched** as P2-B safety-net receipt (full corpus compile w/o bridge step) so operator has artifact when authorizing P2-B deletion.

No code paths changed; docs-only.

Co-authored-by: Claude Opus 4.7 <noreply@anthropic.com>
briansrls added a commit that referenced this pull request May 31, 2026
…6991 rustc

Refresh maturation tracker after #4094/#4096 cascade: MW-D8 5/5 EXIT (#4082),
Wave 2 TR-lane complete, P5 Layer 1 3/3 closed, #4091 ratified, CI runtime drops,
6991 rustc residual per #4086 catalog.

Co-authored-by: Cursor <cursoragent@cursor.com>
briansrls added a commit that referenced this pull request May 31, 2026
…6991 rustc (#4098)

Refresh maturation tracker after #4094/#4096 cascade: MW-D8 5/5 EXIT (#4082),
Wave 2 TR-lane complete, P5 Layer 1 3/3 closed, #4091 ratified, CI runtime drops,
6991 rustc residual per #4086 catalog.

Co-authored-by: Cursor <cursoragent@cursor.com>
@briansrls
briansrls deleted the session/pm-dep-graph-2026-05-31T06 branch June 1, 2026 18:42
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant