docs(planning): tighten Phase 4 rung-4 branch/loop fixture specs - #4048
Conversation
Clarify headline ordering, blocked-aggregate FAIL, modeling vs execution gaps, loop_bound_edge routing, and Phase 4 scope; fix loop baseline table. Co-authored-by: Cursor <cursoragent@cursor.com>
|
Review metadata
1. Story of the diffThis PR tightens two Phase 4 rung-4 fixture planning specs so future workers do not confuse “rung blocked by missing execution infrastructure” with “fixture evaluation attempted and failed.” For both 2. Invariant categories
N/A — the diff is planning-doc-only; it does not touch
Compliant — Boundary Discipline / single-authority is improved: both specs name one headline ordering chain instead of leaving per-cell SKIP receipts and headline status partially conflated. Branch dispatch does this at
Compliant — although this is markdown, the comment/prose discipline analogue is handled well: the worker briefs now use named fields (
N/A — no executable behavior or test harness is changed. The docs clarify expected blocked aggregate state and future PASS/FAIL transition semantics rather than adding a new behavior needing a test:
Compliant — the PR does not alter a locked substrate/design decision; it narrows scope language to avoid overclaiming Phase 4 completion. Both specs explicitly say rung 4 only and preserve the broader Phase 4 remaining-rungs scope at
Compliant — the PR does not introduce new untracked scaffolding. Existing gaps are named with bounds and routing: closure/runtime roster work is fixture activation follow-up ( 2.5. Top-down PM intent reviewCompliant — the highest-level intent here is to make rung-4 planning dispatchable without semantic dilution: prove emit-equals-eval only after execution infrastructure exists, keep blocked aggregate state honest, and avoid turning fixture-local planning docs into modeling authority. The diff preserves that intent by separating execution gaps from modeling gaps ( 3. VerdictAPPROVE. The PR is a docs/planning clarification that improves single-authority dispatch semantics and reduces overclaim risk. I found no blocking invariant, testing, or PM-intent issue in the changed lines. |
Summary
Addresses review feedback on the DRAFT rung-4 fixture-binding specs for
phase4/branch_dispatchandphase4/loop_linear_bound:modeling_gapvsexecution_gapin worker briefs (no implied SG dispatch from these docs)loop_bound_edgefailures route through existing T-12 / SG-1 Loop-bound laneFAILwith allSKIPcellsTest plan