Skip to content

Pin ops to version 2.3.0 #415

Pin ops to version 2.3.0

Pin ops to version 2.3.0 #415

Triggered via pull request July 5, 2023 10:07
Status Cancelled
Total duration 6h 40m 36s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
5s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
4s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
2s
integration-tests / Build rock / Get rocks
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

3 errors
integration-tests / Integration tests / Integration tests
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
integration-tests / Integration tests / Integration tests
The operation was canceled.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
discourse-k8s-charm Expired
2.25 MB