Skip to content

evidence(OMN-14141): bind omnibase_infra PR 2235 handler_routing flat-schema fail-closed guard + CI gate - #3701

Merged
jonahgabriel merged 2 commits into
devfrom
jonah/omn-14141-occ-evidence
Jul 8, 2026
Merged

jonahgabriel merged 2 commits into
devfrom
jonah/omn-14141-occ-evidence

Conversation

@jonahgabriel

Copy link
Copy Markdown
Contributor

Summary

Net-new central OCC evidence companion for omnibase_infra#2235 (OMN-14141), the systemic fix + CI gate for the handler_routing flat-schema silent-zero-parse defect class. Unblocks #2235's occ-preflight / eligibility, which was failing solely because the PR body had no Evidence-Source: line and no OCC companion existed.

What this adds (all NET-NEW files)

  • contracts/OMN-14141.yaml — ticket contract with 4 dod_evidence items.
  • drift/dod_receipts/OMN-14141/dod-infra-pr-2235/command.yaml — binds omnibase_infra#2235 open @ head 5fde0829c59f7f45196dcb3bc3bd39b1f2b53f13.
  • drift/dod_receipts/OMN-14141/dod-local-validation/command.yaml — records the implementation PR's local validation (111/111 contracts discover clean, 354 auto_wiring tests green, 11 new guard tests green).
  • drift/dod_receipts/OMN-14141/dod-deploy-scope/command.yaml — loader/validator/CI/pre-commit/contract/test change only; rides normal dev deploy cadence, no .201 or prod mutation.
  • drift/dod_receipts/OMN-14141/dod-occ-self/command.yaml — self-binding.

All four receipts pin contract_sha256: sha256:f8dd5c232a127f3a84a5ccceff178d8e7d885c31ebfe22c885b43f4f4631374e (computed after normalization-symmetry + yamlfmt).

Verification

  • Local eligibility validator (omnibase_core@main validate_occ_merge_eligibility) against this evidence + chore(OMN-12749): add runtime adapter delegation evidence #2235 metadata → eligible: true.
  • Receipt Honesty Gate (OMN-12791): 0 violations. Receipt Hardening Gate (OMN-13060): pass. dod-evidence-required: pass. validate-yaml: OK. Full pre-commit green on commit.

Authored by an independent verifier (did not implement #2235); no self-authored implementation evidence.

Closes OMN-14141
Evidence-Ticket: OMN-14141

…-schema fail-closed guard + CI gate

Net-new central OCC evidence companion binding omnibase_infra#2235
(head 5fde0829c59f7f45196dcb3bc3bd39b1f2b53f13) to OMN-14141. Adds
contracts/OMN-14141.yaml plus four PASS dod_receipts (dod-infra-pr-2235,
dod-local-validation, dod-deploy-scope, dod-occ-self), all pinning
contract_sha256 sha256:f8dd5c232a127f3a84a5ccceff178d8e7d885c31ebfe22c885b43f4f4631374e.

Closes OMN-14141
Evidence-Ticket: OMN-14141
@coderabbitai

coderabbitai Bot commented Jul 8, 2026 •

Copy link
Copy Markdown

Warning

Review limit reached

You’ve reached a temporary PR review limit under our Fair Usage Limits Policy.

Your recent review volume is higher than typical usage, so adaptive limits are currently applied.

Next review available in: 14 minutes

Enable usage-based reviews in Billing to review now. Otherwise, wait until the next included review is available.
You're only billed for reviews past your plan's rate limits ($0.25/file).

How can I continue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews.

How do review limits work?

CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability.

For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window.

Please refer docs for additional details.

Review details
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro

Run ID: 3043b3b1-f439-43eb-b719-52fbcb8b5625

📥 Commits

Reviewing files that changed from the base of the PR and between d6d03b4 and 7df678d.

📒 Files selected for processing (5)
  • contracts/OMN-14141.yaml
  • drift/dod_receipts/OMN-14141/dod-deploy-scope/command.yaml
  • drift/dod_receipts/OMN-14141/dod-infra-pr-2235/command.yaml
  • drift/dod_receipts/OMN-14141/dod-local-validation/command.yaml
  • drift/dod_receipts/OMN-14141/dod-occ-self/command.yaml
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch jonah/omn-14141-occ-evidence

Comment @coderabbitai help to get the list of available commands.

@jonahgabriel
jonahgabriel enabled auto-merge (squash) July 8, 2026 10:30
…_mismatch fix)

The OCC self-PR eligibility requires at least one PASS receipt bound to the
OCC PR itself. Rebinds dod-occ-self to onex_change_control#3701 via
pr_number: 3701 and commit_sha 3e97687; contract_sha256 unchanged.

Evidence-Ticket: OMN-14141
@jonahgabriel
jonahgabriel merged commit 22ed2f9 into dev Jul 8, 2026
42 checks passed
@jonahgabriel
jonahgabriel deleted the jonah/omn-14141-occ-evidence branch July 8, 2026 10:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant