Skip to content

evidence(OMN-12829): re-point C1 escalation receipts to dev-targeted PR #1126 - #2362

Merged
jonahgabriel merged 1 commit into
devfrom
jonah/omn-12829-reland-receipts
Jun 9, 2026
Merged

jonahgabriel merged 1 commit into
devfrom
jonah/omn-12829-reland-receipts

Conversation

@jonahgabriel

@jonahgabriel jonahgabriel commented Jun 9, 2026 •

Copy link
Copy Markdown
Contributor

OMN-12829 — re-point C1 OCC receipts to the dev-targeted re-land PR

The original C1 escalation work (omnimarket PR #1124, commit d627327e) was orphaned by the stacked-PR auto-merge trap: #1124 merged into the B3 feature branch jonah/omn-12828-cloud-endpoints-key-refs (not dev), so the escalation code never reached origin/dev. It is being re-landed via omnimarket PR #1126 (feat(OMN-12829)… re-land onto dev, commit 96a4b33d, base dev).

The existing OMN-12829 OCC receipts bound to PR #1124 / d627327e, so the required verify / verify receipt gate on #1126 failed with reason: pr_ticket_mismatch ("no PASS receipt for one or more tickets binds to PR #1126 or one of its commit SHAs").

Change

Re-points two receipts so eligibility binds to the dev-targeted PR:

  • dod-market-pr-merged-green: now probes gh pr view 1126 (real probe_stdout captured), commit_sha: 96a4b33d, branch jonah/omn-12829-escalation-to-dev.
  • dod-escalation-suite-green: commit_sha re-pointed to 96a4b33d (suite re-run green, 6 passed — real probe_stdout retained).

The OMN-12829 contract is unchanged (hash dc9ee91b… preserved, so all contract_sha256 fields stay valid). Both receipts remain status: PASS with real probe_stdout and verifier != runner (claude-occ-verifier vs claude). Note: deploy-gate is not a required check for the omnimarket dev branch (required = CI Summary, reject-skip-token, verify/verify, node-drift-gate, Runtime Sweep), so no deploy receipt is added here.

dod_evidence

Evidence-Source: 2a23a9c
Evidence-Ticket: OMN-12829

Summary by CodeRabbit

  • Chores
    • Updated internal metadata references and working directory paths in command evidence records.
    • Synchronized receipt documentation with updated source control information and re-landed pull request details.

@coderabbitai

coderabbitai Bot commented Jun 9, 2026 •

Copy link
Copy Markdown

Review Change Stack

Warning

Review limit reached

@jonahgabriel, we couldn't start this review because you've reached your PR review rate limit.

More reviews will be available in 35 minutes and 31 seconds. Learn how PR review limits work.

Your organization has run out of usage credits. Purchase more in the billing tab.

⌛ How to resolve this issue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

We recommend that you space out your commits to avoid hitting the rate limit.

🚦 How do rate limits work?

CodeRabbit enforces hourly rate limits for each developer per organization.

Our paid plans include higher PR review limits than trial, open-source, and free plans. In all cases, reviews become available again over time. During sustained high-volume PR review activity, CodeRabbit may temporarily slow when the next review becomes available.

Please see our Fair Usage Limits Policy for further information.

ℹ️ Review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro

Run ID: f2c80c7e-1dd3-4298-b4d8-7eaa772c1a1e

📥 Commits

Reviewing files that changed from the base of the PR and between 94d30f8 and 2df952e.

📒 Files selected for processing (5)
  • contracts/OMN-12829.yaml
  • drift/dod_receipts/OMN-12829/dod-escalation-suite-green/command.yaml
  • drift/dod_receipts/OMN-12829/dod-market-pr-merged-green/command.yaml
  • drift/dod_receipts/OMN-12829/dod-occ-pr-2358/command.yaml
  • drift/dod_receipts/OMN-12829/dod-occ-pr-2362/command.yaml
📝 Walkthrough

Walkthrough

This PR updates two Definition of Done receipt evidence files for task OMN-12829. The escalation suite evidence is refreshed with new commit metadata and working directory path. The market PR evidence switches from PR #1124 to PR #1126 with corresponding updates to verification values and output narratives reflecting the re-land.

Changes

Definition of Done Receipt Updates

Layer / File(s) Summary
Escalation suite evidence metadata
drift/dod_receipts/OMN-12829/dod-escalation-suite-green/command.yaml
Escalation run metadata is updated: commit_sha and branch reference new values, and working_dir points to a different local worktree location.
Market PR re-land evidence
drift/dod_receipts/OMN-12829/dod-market-pr-merged-green/command.yaml
PR reference changes from #1124 to #1126, with corresponding updates to check_value, commit_sha, branch, probe_command, probe_stdout, revised actual_output describing re-land behavior, and working_dir.

Estimated code review effort

🎯 1 (Trivial) | ⏱️ ~3 minutes

Possibly related PRs

Poem

🐰 A rabbit hops through receipt files with care,
Updating the evidence, landing with flair,
From #1124 to #1126 we go,
Working directories shift as the checkpoints flow,
The escalation suite and the market stand tall,
Fresh metadata logged—definition of done for all! ✨

🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check ✅ Passed The title accurately and specifically describes the main change: re-pointing C1 escalation receipts from PR #1124 to PR #1126 targeting dev branch.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.

✏️ Tip: You can configure your own custom pre-merge checks in the settings.

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch jonah/omn-12829-reland-receipts

Comment @coderabbitai help to get the list of available commands and usage tips.

…a4b33d

The original C1 receipts bound to omnimarket PR #1124 and commit d627327e. #1124
merged into the B3 feature branch (not dev) via the stacked-PR auto-merge trap, so
the receipt-gate eligibility check on the re-land PR #1126 failed with pr_ticket_mismatch
(no PASS receipt bound to #1126 or its commit SHAs).

Re-points dod-market-pr-merged-green (PR #1126, commit 96a4b33d, real gh pr view probe)
and dod-escalation-suite-green (commit 96a4b33d) so the required verify/verify receipt
gate on #1126 binds correctly. Contract unchanged (hash dc9ee91b preserved); receipts
remain status=PASS with real probe_stdout and verifier != runner.

Evidence-Source: 2a23a9c
Evidence-Ticket: OMN-12829
@jonahgabriel
jonahgabriel force-pushed the jonah/omn-12829-reland-receipts branch from 94d30f8 to 2df952e Compare June 9, 2026 00:12
@jonahgabriel
jonahgabriel added this pull request to the merge queue Jun 9, 2026
Merged via the queue into dev with commit e380cdc Jun 9, 2026
36 checks passed
@jonahgabriel
jonahgabriel deleted the jonah/omn-12829-reland-receipts branch June 9, 2026 00:24
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant