Skip to content

Combined PRs (#2461) #5801

Combined PRs (#2461)

Combined PRs (#2461) #5801

Triggered via push November 4, 2024 13:26
Status Cancelled
Total duration 8m 49s
Artifacts

test.yml

on: push
prepare-checks
0s
prepare-checks
Matrix: code-quality
Matrix: documentation
Matrix: linux-no-std-tests
Matrix: linux-std-tests
Matrix: macos-std-tests
Matrix: windows-std-tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
windows-std-tests (stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
windows-std-tests (stable)
The operation was canceled.
linux-std-tests (stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
linux-std-tests (stable)
The operation was canceled.
linux-std-tests (prev)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
linux-std-tests (prev)
The operation was canceled.
documentation (stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
documentation (stable)
The operation was canceled.
macos-std-tests (stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
macos-std-tests (stable)
The operation was canceled.