Skip to content

Vectorstore

Vectorstore #3

Triggered via pull request January 16, 2024 17:44
Status Failure
Total duration 50s
Billable time 4m
Artifacts

lint.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.8)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
The operation was canceled.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.