Skip to content
This repository was archived by the owner on Jan 22, 2025. It is now read-only.
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Original file line number Diff line number Diff line change
Expand Up @@ -39,7 +39,9 @@ From these simulated _Inflation Schedules_, we can also project ranges for token

Finally we can estimate the _Staked Yield_ on staked SOL, if we introduce an additional parameter, previously discussed, _% of Staked SOL_:

%~\text{SOL Staked} = \frac{\text{Total SOL Staked}}{\text{Total Current Supply}}
$$
\%~\text{SOL Staked} = \frac{\text{Total SOL Staked}}{\text{Total Current Supply}}
$$

In this case, because _% of Staked SOL_ is a parameter that must be estimated (unlike the _Inflation Schedule_ parameters), it is easier to use specific _Inflation Schedule_ parameters and explore a range of _% of Staked SOL_. For the below example, we’ve chosen the middle of the parameter ranges explored above:

Expand Down