feat: schedule Galileo and GalileoV2 on Scroll mainnet#1264
Conversation
WalkthroughUpdated Scroll mainnet chain configuration to activate Galileo and GalileoV2 forks with concrete timestamps (1765868400 and 1766041200 respectively), replacing nil pointers. Concurrently bumped the package version from 5.9.19 to 5.10.0. Changes
Estimated code review effort🎯 1 (Trivial) | ⏱️ ~2 minutes
Possibly related PRs
Suggested labels
Suggested reviewers
Poem
Pre-merge checks and finishing touches✅ Passed checks (3 passed)
✨ Finishing touches
🧪 Generate unit tests (beta)
📜 Recent review detailsConfiguration used: CodeRabbit UI Review profile: CHILL Plan: Pro 📒 Files selected for processing (2)
⏰ Context from checks skipped due to timeout of 90000ms. You can increase the timeout in your CodeRabbit configuration to a maximum of 15 minutes (900000ms). (2)
🔇 Additional comments (2)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
1. Purpose or design rationale of this PR
Schedule the two Galileo hard forks on Scroll mainnet.
1765868400(Tue Dec 16 2025 07:00 UTC)1766041200(Thu Dec 18 2025 07:00 UTC)Rationale:
2. PR title
Your PR title must follow conventional commits (as we are doing squash merge for each PR), so it must start with one of the following types:
3. Deployment tag versioning
Has the version in
params/version.gobeen updated?4. Breaking change label
Does this PR have the
breaking-changelabel?Summary by CodeRabbit
✏️ Tip: You can customize this high-level summary in your review settings.