Skip to content
Merged
Show file tree
Hide file tree
Changes from 2 commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
4 changes: 2 additions & 2 deletions AGENTS.md
Original file line number Diff line number Diff line change
Expand Up @@ -322,7 +322,7 @@ security ──► quality ──┬──► build ──► lighthouse
├──► storybook
└──► vrt
build (main, non-PR) ──► upload-pages-artifact
deploy (main, non-PR) needs: build + e2e ──► GitHub Pages
deploy (main, non-PR) needs: ci-success ──► GitHub Pages
Comment thread
coderabbitai[bot] marked this conversation as resolved.
```

### Jobs
Expand Down Expand Up @@ -551,7 +551,7 @@ Central orchestration layer for all background worker tasks — since ADR-0015,
| `docs/CODEANT-REVIEW-LOOP.md` | Canonical PR review-correction loop procedure (any bot) |
| `docs/DEPENDABOT-TRIAGE.md` | Dependabot PR triage policy — ecosystem/grouping config, why there's no auto-merge, merge sequencing |
| `docs/adr/` | Architecture Decision Records, incl. ADR-0021 (Qt/GPUI native desktop strategy) |
| `docs/native/ROADMAP-QT-GPUI-DESKTOP.md` | Qt 6 + GPUI native desktop roadmap — 24-wave plan superseding Tauri, CEF retired |
| `docs/native/ROADMAP-QT-GPUI-DESKTOP.md` | Qt 6 + GPUI native desktop roadmap — 26-wave plan (Wave 0–24 plus Wave 4.5) superseding Tauri, CEF retired |
| `docs/native/CORE-MIGRATION-LEDGER.md` | Rust Core extraction priority order (what's moved out of TS vs. deferred) |
| `docs/DEPLOYMENT.md` | GitHub Pages + Vercel + Cloudflare Pages |
| `docs/ACCESSIBILITY.md` | A11y architecture (live regions, focus, WCAG 2.2, Lighthouse 0.95 gate) |
Expand Down
3 changes: 3 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -12,6 +12,9 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
- **Renderer-neutral Rust Core seed:** `crates/worldscript-project` now provides headless project
schema, validation, migration, plain JSON I/O, and a test/CLI harness, with one narrow Tauri
validation command wired through the cross-workspace path dependency.
- **Qt Early Killer-Gate qualification:** the native roadmap now requires cheap, evidence-backed
lifecycle, accessibility/input, packaging/update-trust, crash/recovery, and security checks
before substantial Qt UI work can create sunk cost.

### Changed

Expand Down
2 changes: 1 addition & 1 deletion CLAUDE.md
Original file line number Diff line number Diff line change
Expand Up @@ -90,7 +90,7 @@ WorldScript Studio is an offline-first PWA — a React 19 SPA with Google Gemini

### Native desktop strategy (ADR-0021) — read before touching desktop/native code

CEF (Chromium Embedded Framework) is **retired from the target architecture**, not deferred (2026-08-20). Current direction, decided in `docs/adr/0021-qt-gpui-native-desktop-strategy.md` (supersedes ADR-0019/0020): React/PWA stays the first-class web product → **Tauri 2 is transitional only** and is itself retired once Qt reaches Stable (not a permanent third runtime) → an authoritative **Rust Core** (`crates/`, independent Cargo workspace from `src-tauri/Cargo.toml` — see below) → **Qt 6/Qt Quick (QML)** as the primary native desktop product ("Hardened Edition") → **GPUI** admitted much later as a secondary native product ("Vision Edition") behind a strict gate. Full 24-wave roadmap and gates: `docs/native/ROADMAP-QT-GPUI-DESKTOP.md`. If you find CEF referenced as a *future* target anywhere in the repo, that's stale history (see `docs/historical/cef/README.md`) — flag it.
CEF (Chromium Embedded Framework) is **retired from the target architecture**, not deferred (2026-08-20). Current direction, decided in `docs/adr/0021-qt-gpui-native-desktop-strategy.md` (supersedes ADR-0019/0020): React/PWA stays the first-class web product → **Tauri 2 is transitional only** and is itself retired once Qt reaches Stable (not a permanent third runtime) → an authoritative **Rust Core** (`crates/`, independent Cargo workspace from `src-tauri/Cargo.toml` — see below) → **Qt 6/Qt Quick (QML)** as the primary native desktop product ("Hardened Edition") → **GPUI** admitted much later as a secondary native product ("Vision Edition") behind a strict gate. Full 26-wave roadmap (Wave 0–24 plus Wave 4.5) and gates: `docs/native/ROADMAP-QT-GPUI-DESKTOP.md`. If you find CEF referenced as a *future* target anywhere in the repo, that's stale history (see `docs/historical/cef/README.md`) — flag it.

**Rust Core extraction is in progress.** `crates/worldscript-project` (Wave 2 first slice) is a renderer-neutral project schema/validation/migration/plain-I/O crate mirroring `types.ts`'s `StoryProject`/`Character`/`World`/`StorySection` as plain `Vec<T>` (not Redux's `EntityState<T>` union — a real frontend caller needs a normalization adapter first, not yet built). Proven headless (`cargo test` + `wsproj` CLI, zero GUI/Tauri deps) and wired to one real Tauri command, `worldscript_project_validate` (`src-tauri/src/commands/project_core.rs`), via a **path dependency across two independent Cargo workspaces** — `crates/worldscript-project` is a member of the `crates/` workspace, `src-tauri/Cargo.toml` depends on it by path without unifying the workspaces; this compiles and links cleanly. `docs/native/CORE-MIGRATION-LEDGER.md` sets the capability-priority order for what's extracted next (logger/diagnostics and task-orchestration expansion before IDB storage/encryption or `features/project/` domain logic). CI: new `core-rust` job mirrors `rust-tauri`'s fmt/check/clippy/test but needs no GTK/WebKit apt-get steps (zero GUI deps); both are path-scoped via the `changes` job and legitimately show `skipping` on PRs that don't touch their respective directories.

Expand Down
3 changes: 2 additions & 1 deletion README.md
Original file line number Diff line number Diff line change
Expand Up @@ -777,7 +777,8 @@ See **[`CONTRIBUTING.md`](CONTRIBUTING.md)** for the full dev setup, Biome / Vit
| [`docs/DEEPSOURCE-REVIEW-LOOP.md`](docs/DEEPSOURCE-REVIEW-LOOP.md) | DeepSource static-analysis correction loop (living runbook; complements the CodeAnt loop) |
| [`docs/DEEPSOURCE-REMEDIATION-PLAN.md`](docs/DEEPSOURCE-REMEDIATION-PLAN.md) | Prioritised DeepSource backlog tracker (P0-security→P5-docs) with triage decisions |
| [`docs/adr/`](docs/adr/README.md) | Architecture Decision Records — state-management boundaries, local-AI stack layering, WorkerBus v2 hybrid routing |
| [`docs/native/ROADMAP-QT-GPUI-DESKTOP.md`](docs/native/ROADMAP-QT-GPUI-DESKTOP.md) | Qt 6 + GPUI native desktop roadmap (ADR-0021) — 24-wave plan: renderer-neutral Rust Core → Qt Hardened Edition → GPUI Vision Edition, succeeding Tauri; CEF retired, historical record in `docs/historical/cef/` |
| [`docs/native/ROADMAP-QT-GPUI-DESKTOP.md`](docs/native/ROADMAP-QT-GPUI-DESKTOP.md) | Qt 6 + GPUI native desktop roadmap (ADR-0021) — 26-wave plan (Wave 0–24 plus Wave 4.5): renderer-neutral Rust Core → Qt Hardened Edition → GPUI Vision Edition, succeeding Tauri; CEF retired, historical record in `docs/historical/cef/` |
| [`docs/native/QT-EARLY-KILLER-GATES.md`](docs/native/QT-EARLY-KILLER-GATES.md) | Evidence-first Qt feasibility qualification — lifecycle, accessibility/input, packaging/update trust, crash/recovery, and security checks before substantial native UI investment |
| [`docs/native/CORE-MIGRATION-LEDGER.md`](docs/native/CORE-MIGRATION-LEDGER.md) | Rust Core extraction priority order — what's moved out of TypeScript vs. deferred, and why |
| [`docs/architecture/native-readiness.md`](docs/architecture/native-readiness.md) | Native-Readiness scorecard (see ADR-0021) — cross-cutting architecture-quality checklist, re-scored at every architecture-changing PR |
| [`docs/ACCESSIBILITY.md`](docs/ACCESSIBILITY.md) | A11y architecture (live regions, focus, WCAG 2.2, Lighthouse 0.95 gate) |
Expand Down
47 changes: 47 additions & 0 deletions docs/adr/0022-qt-pre-g2-qualification-harness.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,47 @@
# ADR 0022: Bounded pre-G2 Qt qualification harness

**Status:** Accepted — clarifying amendment to [ADR-0021](0021-qt-gpui-native-desktop-strategy.md)
**Date:** 2026-08-20
**Clarifies:** ADR-0021, Decision point 7 and the G2/Wave 5 boundary

## Context

ADR-0021 correctly prohibits production Qt or GPUI UI before the applicable admission gates. Its
wording did not explicitly distinguish a disposable feasibility probe from production UI, while
the adopted roadmap now requires early Wave 4.5 evidence before G2. That ambiguity could either
block a necessary early risk check or let a pre-G2 spike grow into an unadmitted product shell.

## Decision

A bounded, non-product Qt learning/qualification harness under Wave 4.5 is explicitly permitted
before G2 and is not “production UI code”. It exists only to falsify lifecycle, provisional bridge,
accessibility/input, packaging/update trust, crash/recovery, and security-boundary assumptions at
the smallest useful cost. Its non-goals and evidence limits are defined in
[`docs/native/QT-EARLY-KILLER-GATES.md`](../native/QT-EARLY-KILLER-GATES.md).

The harness must remain disposable and isolated:

- no editor, plot board, AI panel, design-system port, or product shell;
- no Qt WebEngine or embedded browser shortcut;
- no generic command executor, broad FFI, or renderer-owned product truth;
- a provisional bridge candidate may be used for the probe, while G2 retains the final bridge
scorecard confirmation informed by the Wave 4.5 evidence;
- no production packaging promise, Tauri retirement, or G2/G3/G4 checklist shortcut follows from
a passing probe.

This is an additive clarification, not a reversal or replacement of ADR-0021. The existing
prohibition on production Qt/GPUI UI before admission remains unchanged, and all later production
gates remain mandatory.

## Consequences

- Agents have an explicit authorization boundary for early Qt feasibility work.
- Contract and lifecycle probes may start as soon as the Rust Core exposes a typed probe call,
parallel to storage and R-15 work; packaging, recovery, and security qualification still wait
for the relevant Core semantics.
- Wave 4.5 can falsify fatal assumptions before feature-port sunk cost without becoming a hidden
Qt implementation wave.
- Wave 5 turns accepted probes into a reusable learning harness and adds its remaining capability
checks; it does not duplicate the Wave 4.5 admission decision.
- G2 remains the formal Qt implementation-admission gate, including final license, version, bridge,
learning-harness, IME, accessibility, and packaged roundtrip decisions.
1 change: 1 addition & 0 deletions docs/adr/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -27,6 +27,7 @@ than editing history.
| [0019](0019-cef-desktop-runtime-strategy.md) | CEF as the next-generation WorldScript Studio desktop runtime | Superseded by 0021 |
| [0020](0020-cef-binding-choice-thin-cpp-host.md) | CEF integration choice — thin C++ host + Rust core (Option B) | Superseded by 0021 |
| [0021](0021-qt-gpui-native-desktop-strategy.md) | Qt 6 + GPUI native desktop strategy; CEF retired | Accepted |
| [0022](0022-qt-pre-g2-qualification-harness.md) | Bounded pre-G2 Qt qualification harness | Accepted clarification of 0021 |

**Format:** Context → Decision → Consequences (incl. rejected alternatives). Keep each ADR to one
decision. Link related records with `[[slug]]`.
121 changes: 121 additions & 0 deletions docs/native/QT-EARLY-KILLER-GATES.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,121 @@
# Qt Early Killer-Gate Qualification

**Status: PLANNED — sequencing approved in the Qt/GPUI roadmap; no Qt production UI is admitted.**

This document defines the cheap, evidence-producing feasibility checks that must happen before
substantial Qt feature porting. It applies the lesson from the retired CEF path: a native direction
must be able to falsify its most dangerous assumptions before the project has accumulated UI
sunk cost.

The qualification is an additive prerequisite between Wave 4 (R-15 implementation) and Wave 5
(the Qt executable learning harness). It does not replace the later G2, G3, or G4 production gates.
Those gates remain necessary because a small feasibility spike cannot prove production completeness.
The pre-G2 authorization boundary is recorded as the clarifying amendment
[`ADR-0022`](../adr/0022-qt-pre-g2-qualification-harness.md); it does not supersede ADR-0021.

## Decision rule

The Qt direction advances only when each gate has a reproducible evidence record, a named owner,
and a result at the appropriate maturity level:

```text
planned → locally proven → CI-proven → packaged-proven → admitted
```

Documentation alone is not a pass. A gate that is not applicable must include a written rationale
and an architecture decision; it must not be silently skipped. A failed kill gate stops Qt work at
the smallest possible investment and returns the program to architecture review.

## Qualification order

The order is deliberately front-loaded by cost and irreversibility. The formal Wave 4.5 exit is
recorded after Wave 4, but its dependency-aware lanes start earlier:

1. **Contract and threat-boundary review** — static and design evidence after the typed Core probe
exists; may run in parallel with Waves 3 and 4.
2. **Provisional bridge selection** — choose one candidate implementation for the disposable probe,
record rejected alternatives, and state that G2 retains the final scorecard decision.
3. **Executable lifecycle/bridge spike** — prove that a minimal Qt process can safely host the
renderer-neutral Core boundary.
4. **Accessibility and input feasibility** — falsify the most important writing-workflow risks
before custom controls are built.
5. **Packaging, updater, and rollback trust** — test the distribution trust model with throwaway
artifacts before product packaging work grows around it.
6. **Crash diagnostics and recovery feasibility** — prove useful failure evidence without weakening
the sandbox or recovery invariants.
7. **Security and permission posture** — validate IPC/FFI, filesystem, network, and updater
boundaries under the intended runtime conditions.
8. **Admission review** — use the evidence to confirm or reject the bridge scorecard, record
residual risks, and only then begin larger
Qt shell or feature work.

Gates 1–2 may begin once Wave 2 has a typed Core probe call and do not depend on R-15. Gate 3 may
follow the lifecycle probe. Gates 4–6 wait for the relevant Wave 4 storage/crypto/recovery and
security semantics; Gate 8 waits for every lane. The admission decision remains conjunctive: one
unresolved kill gate blocks Qt implementation.

## Gate matrix

| Gate | Minimum proof | Kill condition |
|---|---|---|
| Contract/threat boundary | Qt-facing contract inventory identifies every IPC/FFI crossing, data owner, permission, cancellation path, and failure mode; no domain truth moves into QML/C++. | The bridge requires renderer-specific domain rules, arbitrary command execution, or a new broad unsafe/FFI architecture. |
| Lifecycle and Core bridge | A disposable Qt 6/QML probe proves the minimum viability path: process/window creation, QML load, one typed Rust call, one Rust event to QML, one bounded async/cancellation path, clean shutdown, and three repeated launch/close cycles. It records the bridge/lifetime/threading model; it does not build the reusable Wave 5 harness. | Lifetime/threading behavior is nondeterministic, cancellation cannot be bounded, or the Core cannot remain GUI-independent. |
| Accessibility and input | A real Qt Quick control sample exposes a stable accessibility tree and proves keyboard/focus, accessible errors, high contrast, scalable text, RTL/BiDi, and IME smoke behavior on a supported Linux environment. | Required semantics are not observable, custom controls require inaccessible workarounds, or IME/BiDi breaks core writing input. |
| Packaging and updater trust | A packaged hello-world/Core roundtrip starts from a clean environment; signed update metadata, artifact identity, downgrade policy, rollback, and tamper rejection are exercised with test credentials. | Artifact identity or rollback cannot be trusted, updates accept tampered input, or the packaging model requires bypassing repository signing policy. |
Comment thread
coderabbitai[bot] marked this conversation as resolved.
Outdated
| Crash and recovery | An intentional harness crash produces actionable diagnostics and symbols for project-owned code; restart/recovery behavior is deterministic and does not corrupt test data. | Diagnostics require weakening sandbox/process isolation, recovery loses acknowledged data, or failures cannot be reproduced from packaged evidence. |
| Security and permissions | Runtime review covers process boundaries, filesystem/network allowlists, secret handling, updater privileges, temporary files, and least-privilege IPC; negative tests prove denied operations stay denied. | A capability needs arbitrary native execution, broad filesystem/network access, plaintext secret exposure, or weakened encryption/identity binding. |
| Admission decision | A signed/ reviewed scorecard records evidence links, residual risks, owners, expiry/retest conditions, and explicit GO/NO-GO for Wave 5. | Any Critical/High security issue, unowned residual risk, or missing evidence remains at the decision meeting. |

## Minimum evidence package

The qualification work should produce a small, reviewable package rather than a premature product
framework:

- `qt-early-killer-gates.md` scorecard with commit/run links and maturity labels;
- disposable Qt feasibility probes, with no WorldScript feature UI and no Qt WebEngine;
- deterministic probe results covering repeated start/close, cancellation, and clean shutdown;
- an accessibility/input fixture with machine-observable tree and keyboard/IME assertions;
- a clean-environment packaged artifact and a test-key update/rollback fixture;
- a crash fixture with a project-owned symbolized frame and recovery-state assertion;
- a permission-negative-test record covering denied filesystem, network, and native-command paths;
Comment thread
coderabbitai[bot] marked this conversation as resolved.
Outdated
- an architecture decision record for residual risks before Wave 5 admission.

The harness may use a narrow C++/Rust bridge where Qt requires it, but authoritative product
semantics remain in the renderer-neutral Rust Core. It must not become a second product shell,
generic command bridge, or hidden Qt-specific domain layer.

## Required execution environments

The early qualification should use the cheapest environment that can falsify each risk and then
repeat the meaningful checks in CI:

1. **Developer smoke:** fast lifecycle, keyboard, IME, and accessibility-tree checks on the
supported Linux desktop used for development.
2. **Linux CI:** clean build, repeated lifecycle, headless display/compositor smoke, security
negative tests, crash artifact collection, and deterministic result assertions.
3. **Clean packaged runtime:** install/launch/update/rollback/tamper tests against the actual
artifact layout rather than the build tree.
4. **Later platform evidence:** Windows UI Automation, macOS VoiceOver/accessibility APIs, and
supported compositor/GPU matrices remain part of G2/G3/G4; the early Linux spike does not claim
cross-platform parity.

## Explicit non-goals

- no editor, plot board, AI panel, or broad design-system port;
- no Qt WebEngine or embedded Chromium shortcut;
- no GPUI implementation or Qt/GPUI parity race;
- no Tauri retirement before Qt Stable plus the documented field window;
- no R-15 shortcut, renderer-local encryption, or altered identity binding;
- no broad FFI, unsafe runtime, or generic native command executor;
- no production packaging promise based only on an unpackaged developer binary.

## Relationship to later gates

Wave 4.5 answers **“is Qt still technically and operationally plausible?”** cheaply and supplies
the evidence needed to confirm or reject the provisional bridge candidate. Wave 5
turns the accepted disposable probes into the reusable executable learning harness and adds the
remaining file-dialog and clipboard evidence; it does not repeat Wave 4.5's kill-gate work. G2 answers
**“is Qt admitted for implementation?”** with the approved license/version/bridge strategy and
the learning harness. G3 and G4 still require project compatibility, accessibility, security,
packaging, updater, recovery, performance, signing, support, and field evidence at production
quality. Passing this qualification must never be used to check those later boxes early.