[DNM] [FDP] [release-4.17] Pre-release testing for OVN 24.03.#2830
[DNM] [FDP] [release-4.17] Pre-release testing for OVN 24.03.#2830linup2011 wants to merge 1 commit intoopenshift:release-4.17from
Conversation
Signed-off-by: jishi <jishi@redhat.com>
|
/test e2e-aws-ovn-fdp-qe |
|
[APPROVALNOTIFIER] This PR is NOT APPROVED This pull-request has been approved by: linup2011 The full list of commands accepted by this bot can be found here. DetailsNeeds approval from an approver in each of these files:Approvers can indicate their approval by writing |
|
/retest-required |
|
@linup2011: The following tests failed, say
Full PR test history. Your PR dashboard. DetailsInstructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here. |
|
GCP OVN Techpreview lane failed due to different test in two attempts. First attempt [sig-arch][Late][Jira:"kube-apiserver"] all tls artifacts must be registered [Suite:openshift/conformance/parallel]
{ fail [github.com/openshift/origin/test/extended/operators/certs.go:123]: Unexpected error:
<*errors.errorString | 0xc000ebfeb0>:
pod e2e-collect-certificate-7c587 in namespace e2e-collect-certificate-qd5lr didn't start: timed out waiting for the condition
{
s: "pod e2e-collect-certificate-7c587 in namespace e2e-collect-certificate-qd5lr didn't start: timed out waiting for the condition",
}
occurred
Ginkgo exit error 1: exit with code 1}
Second attempt [sig-auth][Feature:ProjectAPI] TestProjectWatch should succeed [apigroup:project.openshift.io][apigroup:authorization.openshift.io][apigroup:user.openshift.io] [Suite:openshift/conformance/parallel]
first run
{ fail [github.com/openshift/origin/test/extended/project/project.go:239]: timeout: e2e-test-project-api-qm6fz
Ginkgo exit error 1: exit with code 1}
second run
5m15s
{ fail [github.com/openshift/origin/test/extended/project/project.go:239]: timeout: e2e-test-project-api-ctrvx
Ginkgo exit error 1: exit with code 1}
Based on triage they can be considered flakes. The PR is OK to be closed |
Issues fixed in ovn24.03-24.03.6-54.el9fdp: