Skip to content

Conversation

@kuiwang02
Copy link
Contributor

No description provided.

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Oct 9, 2025
@openshift-ci-robot
Copy link

@kuiwang02: This pull request explicitly references no jira issue.

Details

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Oct 9, 2025
@openshift-ci openshift-ci bot requested review from bertinatto and tkashem October 9, 2025 08:16
@openshift-ci openshift-ci bot added the e2e-images-update Related to images used by e2e tests label Oct 9, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 9, 2025

@kuiwang02: This PR was included in a payload test run from openshift/operator-framework-operator-controller#508
trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-ipv6-techpreview

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/4830f310-a4ec-11f0-85f6-8de0f114b59e-0

@kuiwang02 kuiwang02 changed the title [WIP]NO-ISSUE: Add webhook image for the olmv1 tests NO-ISSUE: Add webhook image for the olmv1 tests Oct 9, 2025
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Oct 9, 2025
@kuiwang02
Copy link
Contributor Author

@bertinatto Hi, I am from OLM team. and there is new feature webhook of OLMv1 for GA, but before GA, we are required to enable olmv1 webhook case in disconnected env, so we create this PR. could you please help mirror it to quay.io/openshift/community-e2e-images so that we can continue to try olmv1 webhook case? thanks

Copy link
Member

@bertinatto bertinatto left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Oct 9, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 9, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: bertinatto, kuiwang02

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Oct 9, 2025
@kuiwang02
Copy link
Contributor Author

/verified by @kuiwang02

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Oct 9, 2025
@openshift-ci-robot
Copy link

@kuiwang02: This PR has been marked as verified by @kuiwang02.

Details

In response to this:

/verified by @kuiwang02

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD 889c2dd and 2 for PR HEAD 592bd86 in total

@openshift-trt
Copy link

openshift-trt bot commented Oct 9, 2025

Job Failure Risk Analysis for sha: 592bd86

Job Name Failure Risk
pull-ci-openshift-origin-main-e2e-vsphere-ovn-upi IncompleteTests
Tests for this run (23) are below the historical average (3162): IncompleteTests (not enough tests ran to make a reasonable risk analysis; this could be due to infra, installation, or upgrade problems)

@camilamacedo86
Copy link
Contributor

/retest-required

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD 7343864 and 1 for PR HEAD 592bd86 in total

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD bb9f65a and 0 for PR HEAD 592bd86 in total

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 9, 2025

@kuiwang02: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/okd-scos-e2e-aws-ovn 592bd86 link false /test okd-scos-e2e-aws-ovn

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 10, 2025

@kuiwang02: This PR was included in a payload test run from openshift/operator-framework-operator-controller#508
trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-ipv6-techpreview

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/b27282c0-a56e-11f0-997c-3c786d788ca2-0

@openshift-merge-bot openshift-merge-bot bot merged commit 79ff1db into openshift:main Oct 10, 2025
19 of 20 checks passed
@camilamacedo86
Copy link
Contributor

camilamacedo86 commented Oct 10, 2025

/retitle OPRUN-4184: Add webhook image for the olmv1 tests

@openshift-ci openshift-ci bot changed the title NO-ISSUE: Add webhook image for the olmv1 tests OPRUN-4184: Add webhook image for the olmv1 tests Oct 10, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. e2e-images-update Related to images used by e2e tests jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants