Skip to content

Bug 1946479: UPSTREAM: 101950: Make watch order conformance test reliable#786

Merged
openshift-merge-robot merged 1 commit intoopenshift:masterfrom
marun:fix-watch-consistency-e2e
Jun 3, 2021
Merged

Bug 1946479: UPSTREAM: 101950: Make watch order conformance test reliable#786
openshift-merge-robot merged 1 commit intoopenshift:masterfrom
marun:fix-watch-consistency-e2e

Conversation

@marun
Copy link

@marun marun commented Jun 3, 2021

Already merged upstream, will be included with next point release.

This fix needs to merge to o/k and be vendored into origin before #714 can pass the fips job. Fips is running the watch consistency test out of origin.

Already merged upstream, will be included with next point release.
@openshift-ci-robot openshift-ci-robot added the backports/validated-commits Indicates that all commits come to merged upstream PRs. label Jun 3, 2021
@openshift-ci-robot
Copy link

@marun: the contents of this pull request could be automatically validated.

The following commits are valid:

@openshift-ci openshift-ci bot requested review from deads2k and soltysh June 3, 2021 16:04
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jun 3, 2021
@deads2k
Copy link

deads2k commented Jun 3, 2021

/lgtm
/approve

once this shows as having run ci/prow/k8s-e2e-conformance-aws , we can override the rest

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Jun 3, 2021
@openshift-ci
Copy link

openshift-ci bot commented Jun 3, 2021

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: deads2k, marun

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-bot
Copy link

/retest

Please review the full test history for this PR and help us cut down flakes.

@deads2k
Copy link

deads2k commented Jun 3, 2021

test passed

/override ci/prow/e2e-gcp

@deads2k deads2k changed the title UPSTREAM: 101950: Make watch order conformance test reliable Bug 1946479: UPSTREAM: 101950: Make watch order conformance test reliable Jun 3, 2021
@deads2k deads2k added the bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. label Jun 3, 2021
@deads2k
Copy link

deads2k commented Jun 3, 2021

/refresh

@openshift-ci
Copy link

openshift-ci bot commented Jun 3, 2021

@marun: An error was encountered querying GitHub for users with public email (kewang@redhat.com) for bug 1946479 on the Bugzilla server at https://bugzilla.redhat.com. No known errors were detected, please see the full error message for details.

Full error message. Post "http://ghproxy/graphql": dial tcp 172.30.229.2:80: i/o timeout

Please contact an administrator to resolve this issue, then request a bug refresh with /bugzilla refresh.

Details

In response to this:

Bug 1946479: UPSTREAM: 101950: Make watch order conformance test reliable

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@marun
Copy link
Author

marun commented Jun 3, 2021

/bugzilla refresh

@openshift-ci
Copy link

openshift-ci bot commented Jun 3, 2021

@marun: An error was encountered querying GitHub for users with public email (kewang@redhat.com) for bug 1946479 on the Bugzilla server at https://bugzilla.redhat.com. No known errors were detected, please see the full error message for details.

Full error message. Post "http://ghproxy/graphql": dial tcp 172.30.229.2:80: i/o timeout

Please contact an administrator to resolve this issue, then request a bug refresh with /bugzilla refresh.

Details

In response to this:

/bugzilla refresh

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@openshift-ci
Copy link

openshift-ci bot commented Jun 3, 2021

@deads2k: Overrode contexts on behalf of deads2k: ci/prow/e2e-gcp

Details

In response to this:

test passed

/override ci/prow/e2e-gcp

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@openshift-merge-robot openshift-merge-robot merged commit 2dfc46b into openshift:master Jun 3, 2021
@openshift-ci
Copy link

openshift-ci bot commented Jun 3, 2021

@marun: Some pull requests linked via external trackers have merged:

The following pull requests linked via external trackers have not merged:

These pull request must merge or be unlinked from the Bugzilla bug in order for it to move to the next state. Once unlinked, request a bug refresh with /bugzilla refresh.

Bugzilla bug 1946479 has not been moved to the MODIFIED state.

Details

In response to this:

Bug 1946479: UPSTREAM: 101950: Make watch order conformance test reliable

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. backports/validated-commits Indicates that all commits come to merged upstream PRs. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. lgtm Indicates that a PR is ready to be merged.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

6 participants