Skip to content

[release-4.21] NO-JIRA: build(operator): drop hypershift-no-cgo from operator container images - #8753

Closed
openshift-cherrypick-robot wants to merge 1 commit into
openshift:release-4.21from
openshift-cherrypick-robot:cherry-pick-8601-to-release-4.21
Closed

openshift-cherrypick-robot wants to merge 1 commit into
openshift:release-4.21from
openshift-cherrypick-robot:cherry-pick-8601-to-release-4.21

build(operator): drop hypershift-no-cgo from operator container images

5513269
Select commit
Loading
Failed to load commit list.
Red Hat Konflux / Red Hat Konflux / enterprise-contract-mce-211 / hypershift-release-mce-211 cancelled Jun 17, 2026 in 15m 8s

Failed

Integration test for component hypershift-release-mce-211 snapshot scenario enterprise-contract-mce-211 has not run and is considered as failed because the build pipelinerun failed and snapshot was not created

Details

build pipelinerun crt-redhat-acm-tenant/hypershift-release-mce-211-on-pull-request-8q6wm failed, so that snapshot is not created. Please fix build pipelinerun failure and try again.