Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
build: update action to close stale PRs
My original plan of adding a lable to limit those initially process as outlined in #48051 does not work I think because adding a lable updates the last update time. - Removing the need for the lable - Remove the cron scheduling so that it only runs when I run it manually - Fix the display name for the action as I missed updating that after cut and paste from existing action The plan will be to find stop dates that should only affect a reasonable number of PRs at a time and then run in batches using that instead. Signed-off-by: Michael Dawson <[email protected]> PR-URL: #48196 Reviewed-By: Mestery <[email protected]>
- Loading branch information