Skip to content

More fixes to test-infra#158

Merged
knative-prow-robot merged 1 commit intoknative:masterfrom
adrcunha:fix-go
Oct 1, 2018
Merged

More fixes to test-infra#158
knative-prow-robot merged 1 commit intoknative:masterfrom
adrcunha:fix-go

Conversation

@adrcunha
Copy link
Copy Markdown
Contributor

@adrcunha adrcunha commented Oct 1, 2018

  • Readd dummy.go to the root dir: Because we dep the root dir of test-infra, it must contain go code.
  • Ignore kubetest failures in e2e-tests.sh: Cluster teardown failures shouldn't affect the test results.

@knative-prow-robot
Copy link
Copy Markdown
Collaborator

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: adrcunha

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@knative-prow-robot knative-prow-robot added approved Indicates a PR has been approved by an approver from all required OWNERS files. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. labels Oct 1, 2018
@srinivashegde86
Copy link
Copy Markdown
Contributor

/lgtm

@knative-prow-robot knative-prow-robot added the lgtm Indicates that a PR is ready to be merged. label Oct 1, 2018
@jessiezcc
Copy link
Copy Markdown
Contributor

/lgtm

@srinivashegde86
Copy link
Copy Markdown
Contributor

/test pull-knative-test-infra-integration-tests

* Readd dummy.go to the root dir: Because we `dep` the root dir of `test-infra`, it must contain go code.
* Ignore `kubetest` failures in `e2e-tests.sh`: Cluster teardown failures shouldn't affect the test results.
@knative-prow-robot knative-prow-robot removed the lgtm Indicates that a PR is ready to be merged. label Oct 1, 2018
@srinivashegde86
Copy link
Copy Markdown
Contributor

/lgtm

@knative-prow-robot knative-prow-robot added the lgtm Indicates that a PR is ready to be merged. label Oct 1, 2018
@adrcunha adrcunha changed the title Readd dummy.go to the root dir More fixes to test-infra Oct 1, 2018
@knative-prow-robot knative-prow-robot merged commit c21d3a8 into knative:master Oct 1, 2018
knative-prow-robot pushed a commit to knative/serving that referenced this pull request Oct 1, 2018
Unflake E2E tests due to teardown failures (knative/test-infra#158)
bbrowning pushed a commit to bbrowning/serving that referenced this pull request Oct 5, 2018
Unflake E2E tests due to teardown failures (knative/test-infra#158)
Cynocracy pushed a commit to Cynocracy/test-infra that referenced this pull request Jun 13, 2020
* add the commit id constant

* add changeset lib

* add doc.go with explanation
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants