Skip to content

Attempt to fix post-submit #2#2797

Merged
istio-testing merged 2 commits intoistio:masterfrom
kyessenov:attempt_to_fix2
Apr 9, 2020
Merged

Attempt to fix post-submit #2#2797
istio-testing merged 2 commits intoistio:masterfrom
kyessenov:attempt_to_fix2

Conversation

@kyessenov
Copy link
Contributor

re-enable RBE
build before pushing so that k8-fastbuild is populated with generated files.

Signed-off-by: Kuat Yessenov <kuat@google.com>
Signed-off-by: Kuat Yessenov <kuat@google.com>
@kyessenov kyessenov requested a review from a team April 9, 2020 17:35
@istio-testing istio-testing added the size/M Denotes a PR that changes 30-99 lines, ignoring generated files. label Apr 9, 2020
@googlebot googlebot added the cla: yes Set by the Google CLA bot to indicate the author of a PR has signed the Google CLA. label Apr 9, 2020
@kyessenov
Copy link
Contributor Author

cc @bianpengyuan if RBE is set up the same way on pre-post submits, then the issue I think is that we switch bazel options in post-submit to opt/dbg inside scripts. the easy workaround is to do just a normal build first (fastbuild).

@istio-testing istio-testing merged commit ab00158 into istio:master Apr 9, 2020
@kyessenov
Copy link
Contributor Author

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

cla: yes Set by the Google CLA bot to indicate the author of a PR has signed the Google CLA. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants