Skip to content

Update deps

Update deps #733

Triggered via push October 3, 2024 12:40
Status Failure
Total duration 1m 21s
Artifacts

test.yml

on: push
Matrix: check-rust-compat
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (ubuntu-latest)
Process completed with exit code 101.
test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
test (macos-latest)
Process completed with exit code 101.
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
test (windows-latest)
The operation was canceled.
check-rust-compat (1.75)
Process completed with exit code 101.
check-rust-compat (1.76)
The job was canceled because "_1_75" failed.
check-rust-compat (1.76)
The operation was canceled.
check-rust-compat (1.78)
The job was canceled because "_1_75" failed.
check-rust-compat (1.78)
The operation was canceled.