Skip to content

chore(requirements): sync github 2026-07-26 - #881

Merged
SarahLittlejohn merged 2 commits into
masterfrom
chore/requirements-sync-2026-07-26
Jul 27, 2026
Merged

chore(requirements): sync github 2026-07-26#881
SarahLittlejohn merged 2 commits into
masterfrom
chore/requirements-sync-2026-07-26

Conversation

@hmctsclaudecode

Copy link
Copy Markdown

Summary

Nightly reconciliation of the requirements database with the CaTH Kanban board (GitHub Project #43) as of 2026-07-26.

Delta

Change type Count Refs
New requirements 3 REQ-0157 (#593), REQ-0158 (#699), REQ-0159 (#859)
Status changes 1 REQ-0099 (#343): implementedverified
Impl changes 1 REQ-0099 (#343): merged PR sha + paths populated

New requirements

Notes

  • The GitHub App token does not have read:project permission, so board column cannot be verified programmatically. All 3 new issues are closed with merged PRs and assumed to be in "Done" (→ verified).
  • HUMAN REVIEW REQUIRED: Please confirm the 3 new issues were past "Refined Tickets" on the CaTH Kanban before merging.
  • No below-the-gate regressions detected.

🤖 Generated by the nightly requirements-sync job

Co-Authored-By: Claude Opus 4.6 noreply@anthropic.com

Reconcile requirements baseline with CaTH Kanban board state:
- 3 new requirements (REQ-0157..REQ-0159): #593, #699, #859
- 1 status+impl change: REQ-0099 (#343) implemented -> verified

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
@github-actions

github-actions Bot commented Jul 26, 2026

Copy link
Copy Markdown
Contributor

🎭 Playwright E2E Test Results

0 tests   0 ✅  0s ⏱️
0 suites  0 💤
0 files    0 ❌

Results for commit 6fef073.

♻️ This comment has been updated with latest results.

The 2026-07-26 sync run dropped the REQ-0098 (#342) approved -> verified
status change that the prior 2026-07-25 run (PR #877) had captured. Fold it
into this migration so #881 fully supersedes #877, then #877 can be closed.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
@SarahLittlejohn

Copy link
Copy Markdown
Collaborator

Folded in the REQ-0098 (#342) approved -> verified status change (commit 6fef073) that the original 2026-07-26 sync run dropped but the 2026-07-25 run (#877) had captured. This PR now covers the full delta and #877 has been closed as superseded.

Validated by applying schema.sql + seed.sql + migrations 001–010 against a scratch SQLite DB: all apply cleanly and the end state is REQ-0098 verified (v2), REQ-0099 verified (v2) with impl details, and REQ-0157–0159 created.

Human review still required: confirm REQ-0098 (#342), plus the 3 new issues, are genuinely past "Refined Tickets" on the CaTH Kanban — board access was unavailable to the sync job.

@SarahLittlejohn
SarahLittlejohn merged commit 9cb26c0 into master Jul 27, 2026
15 of 16 checks passed
@SarahLittlejohn
SarahLittlejohn deleted the chore/requirements-sync-2026-07-26 branch July 27, 2026 10:06
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant