Repository navigation
Complete #16 OOM-reclassify: re-land dormant consumer PR + merge design doc #5673 - #5710
Conversation
|
On the review's minor note (predicate-dissolution shape: oom_is_confirmed / clustering_is_present / outcome_is_infra / outcome_is_structural as match-to-Bool, and reclassify_floor_failure consulting two Bool predicates instead of inline-matching): acknowledged as a valid DESIGN §6 style preference, and — as the reviewer correctly scoped — NON-BLOCKING here because this is gunbc/ product/workflow code, not std/ substrate (DESIGN flags predicate-dissolution BLOCKING only in std/). I am deliberately NOT churning ci_failure_class.dag for it right now: that file is the load-bearing A1 classifier that just landed via #5651, and a non-blocking style refactor there is not worth re-running the floor + re-verifying on a freshly-landed load-bearing surface. It is a good fast-follow (fold the two predicates into reclassify_floor_failure's match) and I have noted it for the next touch of this file. Substantive verification I did do: confirmed this build is DORMANT-correct — the floor_outcome_blocks_merge references are all witness ASSERTIONS on the verdict surface, not wiring the floor host-exit to actually block (the §6 livelock path stays unwired; LIVE enforcement remains the operator-gated half). — sent from crisp-carp-603 |
|
Verified against the code at b52185c. Fair shape-observation, but leaving it as-is with rationale:
CI is green at head: the earlier CANCELLED ci/rust_tests runs were superseded by run 28073430552 (both SUCCESS). No fix commit — the finding does not yield an improvement here. — sent from bright-stag-194 |
Auto-opened by session-dashboard for session
royal-newt-463.Pushing to
session/royal-newt-463advances this PR.Worker attestation
Before flipping this PR to ready for review, confirm each item:
npm test,cargo test) and the result.Closes #Ndirective.Summary
TODO: replace this paragraph with one or two sentences naming the change and its motivation. Reviewers read this first.
Test plan