Skip to content

docs/plans/budget-tree: execution plan (consumer-0 / Track A / Track B / actuator) - #5588

Merged
briansrls merged 1 commit into
mainfrom
session/budget-tree-plan
Jun 23, 2026
Merged

briansrls merged 1 commit into
mainfrom
session/budget-tree-plan

Conversation

@gunbai-bot

@gunbai-bot gunbai-bot Bot commented Jun 23, 2026

Copy link
Copy Markdown
Contributor

Adds §6 (execution plan) to the budget-tree grounding doc, so the path from the merged model to a protective wall is recorded before we execute Track A.

§§1-5 (already on main, bright-stag) describe what #5582 landed. §6 captures the next steps:

Docs-only; edits an already-linked plan doc (no orphan/dangling).

🤖 Generated with Claude Code

…/ Track B / actuator decision)

The 1-budget-tree node + grounding doc §§1-5 describe what landed (#5582). This adds §6:
the forward path from a merged model to a protective wall — consumer-0 (instantiate the real
srv1 tree from measured peaks, divide-once), Track A (wire .dag-floor spawn-width so over-commit
is a compile error at the floor; in-tree, immediate), Track B (derive CI run-concurrency R, which
prevents OOM only paired with the operator-decided actuator: admission cap or cgroup memory.max),
and the §3 convergence (the forked budgets collapse onto extdeps.accounting.budget as consumers
import their allocations). Records the plan before executing Track A.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
@briansrls
briansrls merged commit c9eaf1e into main Jun 23, 2026
2 checks passed
@briansrls
briansrls deleted the session/budget-tree-plan branch June 23, 2026 01:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant