Repository navigation
§8 ratification log maintenance — decisions, reasoning, cross-refs audit trail - #4173
Conversation
|
Addressed the cursor REQUEST_CHANGES in commit Verified against the current head:
Targeted stale-phrase grep and |
|
Investigated the CI failure on current head Findings:
I do not see a valid fix to push in this ratification-log PR without taking unrelated P3/M1 emitted-Rust work. The PR is review-clean, but merge remains blocked by the baseline |
briansrls
left a comment
There was a problem hiding this comment.
Review metadata
- Provider / model:
codex/unknown - Commit:
22924934· Trigger:schedule - Thinking:
216s wall
BLOCKING (1)
Root Cause
docs/planning/v4-predicate-dependency-graph-2026-06-01-eod.mdpartial stale-spawn wording removal → update §8.6 to the same proud-fox Arbiter state or explicitly mark the old keen-heron/Acting-DFS protocol historical.
|
|
||
| **Next dispatch actions (post-#4137 merge)**: | ||
| - Spawn Modeling DFS Arbiter (per §8.5 #4-#5) | ||
| - Continue implementation dispatch from Modeling DFS Arbiter approvals already recorded by `proud-fox-405` (per §8.5 #4-#5) |
This comment was marked as resolved.
This comment was marked as resolved.
Sorry, something went wrong.
|
Investigated the CI failure on current head Findings:
Per manager ruling, I am not pushing the 7,776-error M1 substrate repair or cherry-picking #4179 into this docs-only ratification PR. #4173 should remain held until #4179/main repairs |
briansrls
left a comment
There was a problem hiding this comment.
Review metadata
- Provider / model:
codex/unknown - Commit:
82a7402f· Trigger:schedule - Thinking:
238s wall
Non-blocking — Strengths
docs/planning/v4-modeling-dfs-ratification-log-2026-06-01.mdThe new log preserves approvals as an audit trail while keeping worksheets as the implementation-scope authority.
✅ No blocking concerns.
|
Review metadata
1. Story of the diffThis PR turns scattered ratification status into an explicit audit trail. The active authority map now links to the new ratification log and records that the audit trail was added ( The rest of the diff reconciles the predicate dependency graph and SG-8 addendum from “arbiter/ratification pending” to “ 2. Invariant categories
Compliant — this is a
Compliant — Boundary Discipline / single authority is handled directly: “Worksheets remain the single authority for implementation scope,” “This log does not replace any worksheet,” and “This log is a navigation aid, not an acceptance substitute” (
N/A — no Rust implementation, helper extraction, method/API shape, error/result surface, or implementation comments are changed. The prose here is the planning artifact itself, not explanatory code comments that could be replaced by clearer implementation structure.
N/A — docs/status-only update with no executable behavior or generated surface. The diff preserves the test-relevant gate by continuing to state that P5 strict GREEN requires the runtime to ship and the suite to execute and pass (
Compliant — no locked design doc is altered, and the diff does not weaken the project’s structural TestClaim direction. The thesis requires proof/test surfaces to be structurally derived from
Compliant — no TODO, temporary code path, scaffold, or new bridge is introduced. The “Open / Pending Entries” section is bounded and explicit about why those items are not approved here: SG-COLLECTION-PROJECTION still needs a worksheet, Python L1/L2 remain draft, and SG-2/stable-band/E0308 drafts grant no implementation authority until §8 closes ( 2.5. Top-down PM intent reviewCompliant — the high-level intent is preserved. This PR updates ratification state without diluting the plan into “approval equals done”: P5 remains open until runtime ships and the suite executes/passes ( 3. VerdictAPPROVE I found no blocking invariant violation. The PR consolidates §8 ratification history while preserving worksheet authority, keeping P5 non-green until runtime execution receipts exist, and keeping pending residual lanes non-dispatchable until their own §8 closure. |
Auto-opened by session-dashboard for session
merry-ibex-873.Pushing to
session/merry-ibex-873advances this PR.Worker attestation
Before flipping this PR to ready for review, confirm each item:
npm test,cargo test) and the result.Closes #Ndirective.Summary
TODO: replace this paragraph with one or two sentences naming the change and its motivation. Reviewers read this first.
Test plan