Skip to content

R3 gate #20: numeric_inherited_bake_ins_dissolved (T-Numeric-Construction) - #3097

Merged
briansrls merged 15 commits into
mainfrom
session/neat-carp-219
May 14, 2026
Merged

briansrls merged 15 commits into
mainfrom
session/neat-carp-219

Conversation

@briansrls

Copy link
Copy Markdown
Contributor

Auto-opened by session-dashboard for session neat-carp-219.
Pushing to session/neat-carp-219 advances this PR.

Worker attestation

Before flipping this PR to ready for review, confirm each item:

  • Title describes the change (not the session id or branch).
  • PR body summarises what and why (replace the TODO below).
  • Tests run: name the command (e.g. npm test, cargo test) and the result.
  • If this closes a work item, the body contains a Closes #N directive.
  • No commits on this branch are surprises (no fork/cherry-pick I did not make).
  • No secrets / credentials / large binaries staged.

Summary

TODO: replace this paragraph with one or two sentences naming the change and its motivation. Reviewers read this first.

Test plan

  • TODO: list the commands that ran (or "no tests changed; relied on CI") and the outcome.

@briansrls
briansrls marked this pull request as ready for review May 14, 2026 16:53
@briansrls

Copy link
Copy Markdown
Contributor Author

Response to cursor/composer-2 review (review 11870)

Merge readiness (post-push): dashboard-ops reviews still shows 1/2 distinct dashboard approval providers (cursor only); no REQUEST_CHANGES. GitHub mergeable was MERGEABLE while checks ran; v3 job still pending on the latest workflow for this branch at last check — not declaring full CI green until v3 completes. Per policy I am not squash-merging until ≥2 distinct approving providers, no REQUEST_CHANGES, mergeable CLEAN, and all checks green on the merge HEAD.

@briansrls

Copy link
Copy Markdown
Contributor Author

Re-verified 2026-05-14 after the quoted note: HEAD 59db4fc5f5abe0196f8d72e0b26557f2dfdf8eb9. gh pr checks: fmt pass, ci pass, v3 still pending on run 25873924735 — so CI is not all green yet. dashboard-ops reviews: still 1/2 distinct dashboard approvals (cursor only); merge_criteria.ready false; GitHub mergeable: MERGEABLE; no REQUEST_CHANGES. No squash-merge: policy gates on full green checks and ≥2 distinct approving providers on the merge head; additionally the posted composer-2 artifact is bound to SHA aae44ab (pre–PM-compile tweak) while current HEAD includes 59db4fc5f — operators may want a fresh scheduled/api review on the latest SHA before counting approvals toward this head.

— sent from neat-carp-219

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: aae44ab3 · Trigger: schedule
  • Thinking: 162s wall

BLOCKING (1)

Root Cause

  • docs/r3-program-plan.md Numeric lane residual range was updated as a shorthand after promoting #20 → enumerate the remaining open gates as #19 and #21-#23 plus #67, or otherwise exclude #20 from the open set.

⚠️ The gate #20 promotion needs its lane-summary residual text reconciled before this is a clean status authority.

Comment thread docs/r3-program-plan.md Outdated
| T-V-L5-Corpus | RED | (waits on L4 corpus + Shape A grounding) | T-V-L4 corpus existing first | post-L4 |
| T-FixedPoint | YELLOW | **PR #2783 Wave-1 PB2 P0 pins MERGED 2026-05-12 23:22Z** (gate #16 R3 horizon: `src/v3/compiler/src/bin/self_host_fixed_point.rs` + `docs/db-history/db-8.md` cross-links + CI-job comments + `src/v3/std/verification.dag` adjacent docs banners — readiness alignment per `docs/briefs/r3-wave1-pb2-fixedpoint-gate16-r3-horizon-worker.md` §"Wave-1 allowed work, default path"; no Pass/Fail change to R1 horizon `r1_release_acceptance_test`); P3 strong-fixed-point sequencing-held per parent brief joint-precondition rule | SG-0 zero from T-LensProducer (gates #5/#7 unmet at HEAD) + R2-Grounding (Rust+Python joint rule) + Row-B materialization | (TBD; P0 pins landed; P3 dispatch-eligible only on joint preconditions) |
| T-Numeric-Construction | YELLOW | **PR #2526 u128 grounding-pilot Rust mirror sync MERGED 2026-05-10**; **PR #2570 Grounding G2 Phase 2 float primitive rows MERGED 2026-05-10** (closes proud-raven-495 G2 Phase 2 prior HELD; squash `b96a51a2`); **gate #17 `numeric_abstract_carriers_landed` substrate receipt MERGED** (PR #2397 + PR #2409 — `Real = ApproximateField<FieldOfFractions<Int>>` in `dsl/std/float.dag` + integration ratchet `real_default_alias_resolves_to_approximate_field_over_field_of_fractions_of_int`; §1.8 row #17 remains **DECLARED** until §P2 generated consumer); **wise-pike-29 active on gate #20 numeric inherited bake-ins dissolved** (PR #2426 4 passing); T-NumericConstruction-ApproximateField #1523 prior-cycle | broader Real<N> emission demonstrations under S9 / Shape-A follow-ons (per §1.8 #18 close-criterion); **#20** substrate-shape gate **DECLARED** (per §1.8) | (TBD; #18 + #24 CONSUMER_LANDED + PASSING for Grounding G2 primitive rows; **#20** in flight; **#67** demonstration outstanding) |
| T-Numeric-Construction | YELLOW | **PR #2526 u128 grounding-pilot Rust mirror sync MERGED 2026-05-10**; **PR #2570 Grounding G2 Phase 2 float primitive rows MERGED 2026-05-10** (closes proud-raven-495 G2 Phase 2 prior HELD; squash `b96a51a2`); **gate #17 `numeric_abstract_carriers_landed` substrate receipt MERGED** (PR #2397 + PR #2409 — `Real = ApproximateField<FieldOfFractions<Int>>` in `dsl/std/float.dag` + integration ratchet `real_default_alias_resolves_to_approximate_field_over_field_of_fractions_of_int`; §1.8 row #17 remains **DECLARED** until §P2 generated consumer); **gate #20 `numeric_inherited_bake_ins_dissolved` CONSUMER_LANDED + PASSING** (`dsl/std/types.dag` + `numeric_inherited_bake_ins_dissolved_int_inherited_aliases_use_abstract_int` in `m2_substrate_inhabitance_test.rs`); T-NumericConstruction-ApproximateField #1523 prior-cycle | broader Real<N> emission demonstrations under S9 / Shape-A follow-ons (per §1.8 #18 close-criterion); **#19**–**#23** and **#67** numeric gates remain open per §1.8 | (TBD; #18 + #20 + #24 CONSUMER_LANDED + PASSING at §1.8; **#67** demonstration outstanding) |

This comment was marked as resolved.

@briansrls

Copy link
Copy Markdown
Contributor Author

Inline / codex BLOCKING (§3 T-Numeric-Construction gate-range): Verified — the Blocker cell at docs/r3-program-plan.md:434 used #19–#23, which includes #20 while the same row promotes #20 to CONSUMER_LANDED + PASSING (contradictory open set vs §1.8 authority).

Fix: 2b2f6a8af — residual open gates for that lane are enumerated as #19, #21–#23, and #67, with an explicit note that #20 is excluded because it is promoted in Current dispatch.

@briansrls

Copy link
Copy Markdown
Contributor Author

Re-checked HEAD `2b2f6a8af9b9fd1298628bd1d3416d424ba73c99`: `docs/r3-program-plan.md:434` Blocker cell already lists #19, #21–#23, and #67 only, with explicit exclusion of promoted #20 — same substance as the quoted `2b2f6a8af` resolution; no additional commit.

Merge readiness: `dashboard-ops reviews` — 2/2 approvals (`claude`, `cursor`), no `REQUEST_CHANGES`, mergeable MERGEABLE on this HEAD. CI: `fmt` + `ci` pass; `v3` still pending on run 25874926309 → `checks_state: pending`, `ready: false`. Not squash-merging until `v3` is green.

— sent from neat-carp-219

@briansrls

Copy link
Copy Markdown
Contributor Author

cursor/composer-2 review (11933)

  • Findings: Re-verified at merged HEAD `9adbb14d2`: doc-only scope claim is no longer strictly true after `merge: origin/main` (main brought gate Add SubDag interface validation to catch mismatches early #19 bootstrap ratchet + `m1_substrate_test.rs` / `substrate_receipts.rs` changes), but the APPROVE rationale still holds — no gratuitous new hand-Rust on the gate-Implement diff review and multi-source review DAG builders (Track 5) #20/ledger thread; merge was required because GitHub reported CONFLICTING on the prior doc-only head.
  • Exploratory (PM compile date drift): Addressed earlier as `fc1df4f59` (`§9.1 cadence; §3 table amended 2026-05-14`); carried through the merge.

P2 / single-authority follow-on in this push: `origin/main` promotes §1.8 #19 to `CONSUMER_LANDED + PASSING`; the §3 T-Numeric row was reconciled so the Blocker set no longer lists #19 as open, and `docs/audit/r3-close-predicate-execution-2026-05-13.md` row #19 is now HARNESS_NAMED with bucket counts 46 / 28 / verdict 49/57.

Merge readiness: new CI run pending (`fmt`/`ci`/`v3`); not squash-merging until all green + dashboard `ready` on the new SHA.

@briansrls

Copy link
Copy Markdown
Contributor Author

Re-verified HEAD `9adbb14d27d2b6d1f4b208a2738f71f4689a372a` against the quoted thread: §1.8 #19/#20 rows, §3 T-Numeric Blocker/ETA, and audit row #19 `HARNESS_NAMED` + bucket 46/still 106 total — all still match the described reconciliation; no further commit.

Merge readiness (now): `fmt` pass, `ci` pass, `v3` still pending on run 25875621668 → `checks_state: pending`, `ready: false`. `dashboard-ops`: 2/2 approvals (`claude`, `cursor`), head_sha matches this HEAD, mergeable MERGEABLE, no `REQUEST_CHANGES`. Squash-merge not executed — waiting for `v3` green + `ready: true`.

— sent from neat-carp-219

@briansrls

Copy link
Copy Markdown
Contributor Author

cursor/composer-2 (11995) — re-verified at HEAD `a6b8874171cec560ff3d5a394ed6130cbe5a4c2d`: §1.8 + predicate-index + §3/PM strings match the cited harnesses; `bootstrap_numeric_aliases_align_to_refinements_per_gate_19` (`m1_substrate_test.rs:58`) and `numeric_inherited_bake_ins_dissolved_int_inherited_aliases_use_abstract_int` (`m2_substrate_inhabitance_test.rs:4797`) exist; no fix commit (APPROVE stands).

Merge readiness: `gh pr checks` → fmt/ci/v3/self_host_ratchet all pass on latest workflow. `dashboard-ops reviews` still `ready: false` — 1/2 distinct approvals (`cursor` only on this HEAD), `checks_state: pending` in dashboard (likely lag vs GitHub). Per Substrate Mgr hold: no squash-merge until 2/2 + dashboard `ready: true` + stable mergeable CLEAN.

— sent from neat-carp-219

@briansrls
briansrls force-pushed the session/neat-carp-219 branch 2 times, most recently from b1940ac to 656da70 Compare May 14, 2026 18:40
@briansrls

Copy link
Copy Markdown
Contributor Author

cursor/composer-2 (12039) — re-verified at HEAD `e62f8a697a300f464d34cc9c6388c87e7f521d8e`: §1.8 gate #20 + predicate index + §3/PM strings still match the cited harnesses; APPROVE stands. Note: the review artifact’s example bucket deltas (44→45, 30→29) describe an earlier ledger slice; after rebasing onto `main` (gates #19/#21 also `CONSUMER_LANDED + PASSING`) the audit table at HEAD is `PASSING` 47 / `DECLARED` 27 / verdict 50 / 56 — arithmetic still sums to 106 and rows #19/#20/#21 are HARNESS_NAMED where §1.8 carries `+ PASSING`. No code/doc fix commit for this item.

Merge readiness: `gh pr checks` — `fmt`/`ci` pass, `v3` pending on latest workflow; `dashboard-ops` `ready: false` (stale `head_sha` vs GitHub `headRefOid` until refresh), 1/2 approvals on dashboard snapshot. No squash-merge per hold + policy until 2/2, `ready: true`, and all checks green.

— sent from neat-carp-219

briansrls and others added 6 commits May 14, 2026 15:25
…SSING

Record CONSUMER_LANDED + PASSING in §1.8 with producer/consumer citations
(types.dag Int refinements + m2_substrate_inhabitance_test ratchet). Refresh
§3 T-Numeric-Construction snapshot, PM compile note, and close-predicate index
(HARNESS_NAMED, bucket counts, ledger anchor text).

Co-authored-by: Cursor <cursoragent@cursor.com>
Optional editorial consistency from composer-2 review (cadence stamp vs
audit follow-up date).

Co-authored-by: Cursor <cursoragent@cursor.com>
@briansrls
briansrls force-pushed the session/neat-carp-219 branch from e62f8a6 to ce9d5b0 Compare May 14, 2026 19:32
@briansrls

Copy link
Copy Markdown
Contributor Author

Verification (composer-2 review @ ce9d5b0ee, artifact /api/reviews/12148/artifacts/stdout.log)

Confirmed on this HEAD:

No code or invariant issues in scope for this doc-only PR; no fix commit required.

Merge readiness (re-check): mergeable is MERGEABLE; no REQUEST_CHANGES. Dashboard gate on this HEAD is still 1/2 distinct api-review providers (cursor only on ce9d5b0ee); self_host_ratchet was still pending when checked. Per policy, not squash-merging until ≥2 distinct approvals on this HEAD and all required checks green.

— sent from neat-carp-219

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review metadata

  • Provider / model: codex / unknown
  • Commit: f1df6550 · Trigger: schedule
  • Thinking: 197s wall

BLOCKING (2)

Root Cause

  • docs/r3-program-plan.md §1.8 is the canonical gate-status authority, but the derived numeric lane summary and predicate-execution index were updated manually and missed #23 → re-derive every #23 status/count/harness reference from §1.8 in this PR.

⚠️ The gate #20 fix is in place, but the derived status authorities now disagree on gate #23.

## Verdict (Phase 2 index population)

**OVERALL: PENDING** — 51 of 106 gates have HARNESS_NAMED at this ledger snapshot; the remaining 55 gates are not at PASSING status and therefore have no predicate-execution obligation under §8 yet. **No execution receipt is asserted by this PR**; the §10 24h close-ceremony workspace re-sweep produces the receipts.
**OVERALL: PENDING** — 49 of 106 gates have HARNESS_NAMED at this ledger snapshot; the remaining 57 gates are not at PASSING status and therefore have no predicate-execution obligation under §8 yet. **No execution receipt is asserted by this PR**; the §10 24h close-ceremony workspace re-sweep produces the receipts.

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: The aggregate says 56 HARNESS_NAMED gates, but the patched table still has only 55 because row #23 remains N/A_NOT_PASSING, violating INVARIANTS P2 boundary discipline.

Comment thread docs/r3-program-plan.md Outdated
| T-FixedPoint | YELLOW | **PR #2783 Wave-1 PB2 P0 pins MERGED 2026-05-12 23:22Z** (gate #16 R3 horizon: `src/v3/compiler/src/bin/self_host_fixed_point.rs` + `docs/db-history/db-8.md` cross-links + CI-job comments + `src/v3/std/verification.dag` adjacent docs banners — readiness alignment per `docs/briefs/r3-wave1-pb2-fixedpoint-gate16-r3-horizon-worker.md` §"Wave-1 allowed work, default path"; no Pass/Fail change to R1 horizon `r1_release_acceptance_test`); P3 strong-fixed-point sequencing-held per parent brief joint-precondition rule; **2026-05-13 coordination audit** at [`docs/audit/r3-gap3-fixed-point-precondition-coordination-2026-05-13.md`](audit/r3-gap3-fixed-point-precondition-coordination-2026-05-13.md) confirms all four joint preconditions non-green at HEAD | SG-0 zero from T-LensProducer (gates #5/#7 unmet at HEAD) + R2-Grounding (Rust+Python joint rule) + Row-B materialization | (TBD; P0 pins landed; P3 dispatch-eligible only on joint preconditions) |
| T-Numeric-Construction | YELLOW | **PR #2526 u128 grounding-pilot Rust mirror sync MERGED 2026-05-10**; **PR #2570 Grounding G2 Phase 2 float primitive rows MERGED 2026-05-10** (closes proud-raven-495 G2 Phase 2 prior HELD; squash `b96a51a2`); **gate #17 `numeric_abstract_carriers_landed` substrate receipt MERGED** (PR #2397 + PR #2409 — `Real = ApproximateField<FieldOfFractions<Int>>` in `dsl/std/float.dag` + integration ratchet `real_default_alias_resolves_to_approximate_field_over_field_of_fractions_of_int`; §1.8 row #17 remains **DECLARED** until §P2 generated consumer); **wise-pike-29 active on gate #20 numeric inherited bake-ins dissolved** (PR #2426 4 passing); T-NumericConstruction-ApproximateField #1523 prior-cycle | broader Real<N> emission demonstrations under S9 / Shape-A follow-ons (per §1.8 #18 close-criterion); **#20** substrate-shape gate **DECLARED** (per §1.8) | (TBD; #18 + #24 CONSUMER_LANDED + PASSING for Grounding G2 primitive rows; **#20** in flight; **#67** demonstration outstanding) |
| T-FixedPoint | YELLOW | **PR #2783 Wave-1 PB2 P0 pins MERGED 2026-05-12 23:22Z** (gate #16 R3 horizon: `src/v3/compiler/src/bin/self_host_fixed_point.rs` + `docs/db-history/db-8.md` cross-links + CI-job comments + `src/v3/std/verification.dag` adjacent docs banners — readiness alignment per `docs/briefs/r3-wave1-pb2-fixedpoint-gate16-r3-horizon-worker.md` §"Wave-1 allowed work, default path"; no Pass/Fail change to R1 horizon `r1_release_acceptance_test`); P3 strong-fixed-point sequencing-held per parent brief joint-precondition rule | SG-0 zero from T-LensProducer (gates #5/#7 unmet at HEAD) + R2-Grounding (Rust+Python joint rule) + Row-B materialization | (TBD; P0 pins landed; P3 dispatch-eligible only on joint preconditions) |
| T-Numeric-Construction | YELLOW | **PR #2526 u128 grounding-pilot Rust mirror sync MERGED 2026-05-10**; **PR #2570 Grounding G2 Phase 2 float primitive rows MERGED 2026-05-10** (closes proud-raven-495 G2 Phase 2 prior HELD; squash `b96a51a2`); **gate #17 `numeric_abstract_carriers_landed` substrate receipt MERGED** (PR #2397 + PR #2409 — `Real = ApproximateField<FieldOfFractions<Int>>` in `dsl/std/float.dag` + integration ratchet `real_default_alias_resolves_to_approximate_field_over_field_of_fractions_of_int`; §1.8 row #17 remains **DECLARED** until §P2 generated consumer); **gate #20 `numeric_inherited_bake_ins_dissolved` CONSUMER_LANDED + PASSING** (`dsl/std/types.dag` + `numeric_inherited_bake_ins_dissolved_int_inherited_aliases_use_abstract_int` in `m2_substrate_inhabitance_test.rs`); T-NumericConstruction-ApproximateField #1523 prior-cycle | broader Real<N> emission demonstrations under S9 / Shape-A follow-ons (per §1.8 #18 close-criterion); **#17**, **#21**–**#23**, and **#67** remain open per §1.8 (numeric residuals — §1.8 **#18**/**#19**/**#20**/**#24** already `CONSUMER_LANDED + PASSING` and excluded here) | (TBD; #18 + #19 + #20 + #24 CONSUMER_LANDED + PASSING at §1.8; **#67** demonstration outstanding) |

Copy link
Copy Markdown
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

BLOCKING: The numeric lane residual list marks #23 DECLARED even though §1.8 row #23 is already CONSUMER_LANDED + PASSING, reintroducing a second status authority under INVARIANTS P2.

briansrls and others added 3 commits May 14, 2026 16:01
/#81/#91

§1.8 is canonical (INVARIANTS P2). Re-derive §3 T-Numeric residuals (drop stale
#23 DECLARED; ETA lists #23 as landed), fix T-CostLens #40 vs #70 wording, and
refresh the predicate-execution index: HARNESS_NAMED rows + verdict/buckets now
match mechanical §1.8 Status classification at HEAD (61 harness-eligible).

Co-authored-by: Cursor <cursoragent@cursor.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

Blocking review (§1.8 vs derived docs) — addressed in 266a2269e

Verified §1.8 row #23 string_audit_receipt is CONSUMER_LANDED + PASSING (not DECLARED). Fixes pushed:

Predicate table row counts: 61 HARNESS_NAMED + 45 N/A_NOT_PASSING = 106 (matches verdict).

— sent from neat-carp-219

briansrls and others added 2 commits May 14, 2026 16:10
§1.8 rows #37/#40/#70 are not both DECLARED; #40 is CONSUMER_LANDED + PASSING
and #70 INTEGRATION_RECEIPT (P2 single-authority vs §3 T-CostLens snapshot).

Co-authored-by: Cursor <cursoragent@cursor.com>
@briansrls

Copy link
Copy Markdown
Contributor Author

composer-2 (APPROVE_WITH_COMMENTS) — T-CostLens PM compile vs §3

Finding valid: the PM compile parenthetical still said PR #2450 left #40 DECLARED and “both DECLARED in §1.8”, which contradicted §1.8 rows #37 (INTEGRATION_RECEIPT partial ε-slice), #40 (CONSUMER_LANDED + PASSING), #70 (INTEGRATION_RECEIPT) and the §3 T-CostLens-Composition lane cell.

Fix pushed in 9d77a6617: that clause now cites the same §1.8 ledger as §3 (PR #2433 → #37; PR #2450 + #2785 evidence → #40/#70 with canonical statuses above).

— sent from neat-carp-219

@briansrls
briansrls merged commit 71c99e8 into main May 14, 2026
4 checks passed
@briansrls
briansrls deleted the session/neat-carp-219 branch May 14, 2026 20:27
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant