Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
3 changes: 2 additions & 1 deletion docs/audit/r3-sg0-trajectory-tracker.md
Original file line number Diff line number Diff line change
Expand Up @@ -52,10 +52,11 @@ echo "$(date -u +%Y-%m-%d) | $sha | non_test=$non_test test=$test fragments=$fra
| **2026-05-09 EOD** | **eb2cc15cd** (last commit before 2026-05-10 UTC) | **53** | **107** | **2** | **162** | **+12 (retroactive correction; 9-day total: +42)** | 12 entries landed during 2026-05-09 evening: T-CostLens γ-ratification (#2283), R3 plan audit (#2501), 21-PR cycle (R3 P0 dissolutions + gate landings + audit + bridge retirements) | retroactive baseline correction; previous tracker row (150) was taken mid-day on 2026-05-09 before the evening cycle landed; honest EOD count is 162 |
| **2026-05-10 (00:38Z)** | **f1588bcc8** | **53** | **107** | **1** | **161** | **−1 (vs 2026-05-09 EOD)** | (none) — 1 fragment removed (`parse_corpus_manifest.txt`-class transient) between eb2cc15cd and f1588bcc8 | Director-receipted intermediate reading at gunbc#828 c#4414054598 (committed on `session/gentle-newt-665` branch as 88e6fca99; never merged to main due to session archival). Director framing: "Trajectory NOT yet inflected toward shrink — bulk events queued (gate #6 wise-crane-831 ACTIVE, F2 PR #2473, T-Tier3 D2a PR #2285, carve-promotion #81/#82/#83/#95) but pre-land at snapshot. Alarm 1 + Alarm 2 tripped on extrapolation against the (then-stale) 150 baseline." Honest delta vs corrected EOD baseline (162) is **−1** (a marginal shrinkage), not +11 |
| **2026-05-10 (later)** | **cea1fbe87** | **53** | **108** | **2** | **163** | **+2 (vs f1588bcc8 intermediate; +1 vs 2026-05-09 EOD)** | PR #2506 [codex] add anthropic wire demo (1 test entry + 1 fragment re-added: `anthropic_messages_wire_demo_test.rs` + manifest fragment) | **velocity is steady, not anomalous** (prior +13 framing was a baseline-comparison artifact; Director's +11 framing was the same artifact against the 150 baseline). True 1-day delta vs 2026-05-09 EOD is +1 entry net; cumulative 10-day total is +43 (+30 prior + +12 retroactive 2026-05-09 evening + +1 today). Velocity tripwire (≥3:1 introduction:dissolution, 7-day): **status pending/uncomputed** — 7-day cumulative ratio not yet computed in this snapshot; will be computed once Cluster M Phase 1 lands |
| **2026-05-11** | **31acf4357** | **53** | **112** | **2** | **167** | **+4 (vs 2026-05-10 cea1fbe87)** | 4 new test entries from gate-related PR landings during 2026-05-10 → 2026-05-11 window: `lens_behavioral_parity_demonstration_test.rs` (PR #2525 / gate #73 evidence), `r3_gate_87_lens_cementing_regen_receipts_test.rs` (PR #2639 / gate #87 evidence), `r3_lens_producer_retirement_executable_witness_test.rs` (PR #2595), `t_ci_workflow_as_data_demo_test.rs` (T-Workflow-As-Data demo). PR-merge evidence accrued for many gates (T-Tests-As-Data #86 **CONSUMER_LANDED + PASSING** via PR #2645; #87 **CONSUMER_LANDED** via PR #2639 (not yet PASSING — 8 regen harnesses still `Compiles`-only placeholders per §1.8 close-criterion); #85 carriers landed via PR #2647 but **CONSUMER_LANDED not yet claimed** (§1.8 status remains **DECLARED**); #84 **DECLARED** in §1.8 — cannot promote until EXPECTED_HAND_AUTHORED_TEST = 0; T-Bridge-Retirement gate #31 + T-LensProducer gates #5/#6 + T-V-L7 gate #10 PR-merged with separate §1.8 status drift sweep pending). **Cluster M Phase 3 bulk port NOT yet kicked in to shrink census; PR-merge evidence ≠ §1.8 gate-PASSING per separate status drift sweep step.** | gate-landing/related PR-merges accrue evidence toward the 96 §1.8 gates GREEN target via separate drift sweeps; canonical §1.8 status authoritative per row. SG-0 census still accumulating until Phase 3 bulk-port worker migration completes (calm-newt-602 + silent-swift-300 active). True 1-day delta vs 2026-05-10 EOD is +4 test entries; cumulative 11-day total is +47. Velocity tripwire (≥3:1, 7-day): **status pending/uncomputed** — will be computable once Phase 3 bulk port migration begins shrinking census |

## §4. Velocity-to-zero math

**Current state** (2026-05-10): 163 entries (53 non_test + 108 test + 2 fragments). True 10-day average is **+4.3/day** (43 entries over 2026-04-30 → 2026-05-10 window); 1-day delta vs 2026-05-09 EOD is **+1** (anthropic_messages_wire_demo_test.rs). Earlier "+13 anomaly" framing was a baseline-comparison artifact corrected here.
**Current state** (2026-05-11): 167 entries (53 non_test + 112 test + 2 fragments). True 11-day average is **+4.3/day** (47 entries over 2026-04-30 → 2026-05-11 window); 1-day delta vs 2026-05-10 EOD is **+4** (gate-landing tests from #73 / #87 / lens-producer retirement witness / T-Workflow-As-Data demo). Census still accumulating (Cluster M Phase 3 bulk port not yet kicked in).

**Required for R3 close**: 0 + 0 + 0.

Expand Down
Loading