Roadmap: consequence standing, extension law, scenario evaluation, customer CI failover - #13826

Merged
gunbai-bot[bot] merged 2 commits into
mainfrom
fabric-decision-roadmap
Oct 13, 2026
Merged

gunbai-bot[bot] merged 2 commits into
mainfrom
fabric-decision-roadmap

Conversation

@gunbai-bot

@gunbai-bot gunbai-bot Bot commented Oct 13, 2026 •

Copy link
Copy Markdown
Contributor

Adds four roadmap nodes under fabric-bringup. They extend fabric-demand-objective (#13801) with what the operator side-chat discussion established and no PR yet carried.

Node Depends on Target
fabric-consequence-standing fabric-demand-objective Every candidate carries one disposition per required consequence dimension: observed, estimated, bounded, irrelevant or unestablished. Unknown setup or reconstruction is never zero.
fabric-dimension-extension-law fabric-consequence-standing A new dimension enters through the shared evaluation, never as a side controller. Every extension ships a must-change and a must-preserve control through the real decision path.
fabric-scenario-evaluation fabric-consequence-standing, fabric-dimension-extension-law Seeded joint scenarios (coupled facts drawn together) produce per-dimension outcome distributions. Old and new MODEL revisions are compared on identical seeds under a fixed decision authority, gated on safety, dominance, the extension law's preservation control and regret. The REDs are structural: an undeclared loss ratchet crosses an invariant, and ownership history changes a selection among equivalent offers.
fabric-customer-ci-failover fabric-demand-objective, fabric-consequence-standing Customer CI failover, balancing, cloud burst and return-to-owned-capacity are one allocation on the shared decision interface. The transition plan is part of each candidate; disruption stays decomposed; scarce capacity is selected under the affected demands' declared objectives and contracts, with normalized delay as an axis reading or constraint, not a universal rule. The red control is the eight-case receipt.

Each node states boundary, displaced cost, first slice, RED control, out of scope and handback. Customer CI failover joins the conformance-decision consumer list in that node's first slice; it is not added here, because #13825 is open against the same rows.

Verification: a remote __no_such_function__ run returns NoSuchFunction, so the roadmap authority resolves and typechecks. ROADMAP.md is not regenerated: #13810 (open) stops committing it, and the cutover owner asked lanes not to regenerate it meanwhile.

🤖 Generated with Claude Code

…io evaluation, customer CI failover

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Requesting bounded structural repairs at 4b49ac7.

The stack's top-down decomposition is right. #13801 is the sound root: the demand's declared objective governs resource choices. #13825 adds the shared onboarding/conformance interface. This PR then correctly separates (a) consequence standing, (b) the extension law, (c) deterministic joint-scenario evaluation, and (d) customer CI failover as another consumer rather than another scheduler.

Three issues block this head:

  1. The roadmap dependencies do not close over what the nodes consume. fabric-customer-ci-failover requires the consequence-standing carrier in its own first slice (spend, time to accepted result, repeated work, liability, plus startup/storage unknowns), but it is held only by fabric-demand-objective. That permits it to dispatch before the shared consequence carrier and re-mint those dispositions locally. Add a dependency on fabric-consequence-standing. Likewise, fabric-scenario-evaluation claims the extension law's must-preserve gate; either hold it behind fabric-dimension-extension-law or state a single ownership direction so these do not become two preservation authorities.

  2. Customer-CI arbitration hard-codes a local priority rule: Scarce recovery capacity ... goes by delay relative to each customer's own allowance. Delay relative to allowance is a useful axis, and a contract may explicitly select a max-normalized-disruption policy, but it is not the universal winner across customer objectives. As written this repeats the exact problem the shared interface removes: one local score stands above cost, accepted work, SLO constraints, release criticality and other contract terms. Carry normalized delay as a declared consequence/constraint; let the owning contract/objective select among the non-dominated allocation candidates.

  3. Scenario regression needs a fixed decision authority. A new policy must beat the old one / regret no worse is only meaningful when subject, objective, constraints, candidate field and evaluation metric are held fixed. #13801 deliberately requires different objectives to produce different winners; a latency-sensitive policy must not be gated as a regression against debt-payoff under one shared regret score. Scope the paired gate to model/implementation revisions under the same decision authority, and treat a changed objective as a new decision. The historical controls should name discriminating scenarios/invariants rather than claim universal economic inferiority. In particular, history-keyed-limit ... loses to the current policy is presently ambiguous because the live ctrl policy introduced by #2333 is itself history-keyed.

Stack note: #13825 remains blocked on the one wording repair already requested there. A declared bounded feedback/update law must be allowed to consume a loss observation without an operator policy revision on every step; otherwise this PR's black-box/convergence work is classified as a permanent departure. #13801 is merged and remains the correct foundation.

No other blocker found. The consequence disposition, unknown-never-zero rule, joint-scenario requirement, transition-as-candidate framing, storage-as-supply treatment, fencing/readback cases, and deterministic seeded corpus all fit the intended system.

At review time witnesses and heal were still in progress.

…tration, fixed-authority revision comparison

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

@briansrls briansrls left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

APPROVE at 542a07b.

The three requested repairs are present and close the prior blockers:

  1. Dependency closure: customer CI failover now depends on consequence standing; scenario evaluation now also depends on the dimension-extension law, and the node explicitly states that the scenario runner is the implementation consumed by that law's preservation control.
  2. Customer-CI arbitration: normalized delay is now an axis reading or contract constraint, not a universal score. Scarce capacity is selected over the complete candidate field under the affected demands' declared objectives and constraints; a contract may explicitly choose minimax normalized disruption.
  3. Fixed-authority evaluation: paired scenario comparisons now hold subject, objective/valuations, constraints, candidate-field authority, horizon and outcome interpretation fixed. A changed objective is a different decision, and the historical REDs are structural rather than unsupported universal profitability claims.

I rechecked the complete one-file diff and edge additions. The four-node decomposition remains coherent: demand objective -> consequence standing -> extension law / deterministic joint-scenario evaluation, with customer CI failover consuming the shared objective and consequence carrier. No further blocker found.

Land once required checks pass; heal and witnesses were still in progress at my last check.

@gunbai-bot
gunbai-bot Bot merged commit b6006da into main Oct 13, 2026
3 checks passed
@gunbai-bot
gunbai-bot Bot deleted the fabric-decision-roadmap branch October 13, 2026 01:52
gunbai-bot Bot pushed a commit that referenced this pull request Oct 13, 2026
…et, #13825/#13826 roadmap+conformance) into session/tidy-owl-279
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant