Repository navigation
docs(r1c-d): manager status row + RED gate surfacing to PB - #1074
Conversation
Trailing R1C-D coordination slice (Option 1 per R1 Closure direction at inbox #849): record post-#1050 lane status + cross-manager hand-off path for the five RED gates to the Pure Bootstrap to Zero program. Also corrects the #1050 test docstring (claimed 3/6 RED; actual is 5/6 RED at HEAD 5f405cc). Status at landing: 6/6 fixtures authored, runner-evaluating against live SG-0 census; 1/6 green (D.3 pb_self_compile_fixed_point). D.1/D.2/D.4/ D.5/D.6 pacing owned by PB program — concrete dissolution-work table added to docs/briefs/r1-closure-manager.md. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
Review metadata
Review complete. The diff is two edits: a brief update plus test module doc comment alignment. No logic, types, or test assertions changed. Findings: None. Nothing in the diff conflicts with the referenced rubric in a concrete way: it’s documentation and rustdoc on an existing integration test, not new substrate or parallel authority in code. The “Documentation Describes Live State” concern is addressed in-doc via an explicit refresh instruction and a pinned Observed (HEAD Verdict: APPROVE — Small, consistent doc update: R1C-D status row, RED-gate table for PB hand-off, and matching rustdoc in |
briansrls
left a comment
There was a problem hiding this comment.
Review metadata
- Provider / model:
codex/unknown - Commit:
2adba3a0· Trigger:schedule - Thinking:
121s wall
Non-blocking — Strengths
docs/briefs/r1-closure-manager.mdThe RED gate surfacing keeps the PB debt documented, bounded by named gates, and tied to concrete dissolution work instead of hiding it behind R1 close status.
✅ No blocking concerns; this is a docs/comment alignment PR and the added status surface matches the tracked-bridge discipline.
Summary
main(5f405cc8e). Adds the manager-surface acceptance lines that don't live in test(v3): R1C-D PB census .dag suite + integration receipt #1050's code diff: lane status row + cross-manager RED-gate routing path to the Pure Bootstrap to Zero program.pb_self_compile_fixed_point); D.1/D.2/D.4/D.5/D.6 RED with concrete dissolution-work table mapping each gate → blocking PB workstream. Pacing stays owned by PB program; this brief is the hand-off surface.Test plan
cargo fmt --all --checkclean (pre-push hook).cargo test -p v3-compiler --test integration r1c_d_pb_census_gates_suite_evaluates_through_runnerpasses (the test(v3): R1C-D PB census .dag suite + integration receipt #1050 receipt is unaffected; only its docstring shifted).r1-closure-manager.mdcross-checked against live runner output at HEAD5f405cc8e.— sent from nimble-seal-850 (inbox #1054); reply at #1054
🤖 Generated with Claude Code