Skip to content

Execute the deleted-lane countable on the required floor - #10447

Merged
briansrls merged 12 commits into
mainfrom
session/cool-hawk-528
Sep 5, 2026
Merged

briansrls merged 12 commits into
mainfrom
session/cool-hawk-528

Conversation

@gunbai-bot

@gunbai-bot gunbai-bot Bot commented Sep 4, 2026 •

Copy link
Copy Markdown
Contributor

Finding

Run 33889629622's uploaded required_floor_disposition.tsv shows that all 12 declarations in witness_floor_workflow_consolidation_witness_test were discovered and all 12 were declined_outside_gate_closure. The apparent 8/4 split in the log is the floor-cost-debt split: eight identities are already declared debt, while four—including w_RED_the_deleted_lanes_do_not_return—were neither debt-held nor recurring executions.

The cause is the module's absence from required_gate_prefixes, not candidate-list construction.

Change

  • admit the exact workflow-consolidation module to the required floor
  • pin the three rung drops' cited identity as Planned in the discovery-census witness
  • retain the existing eight cost-debt dispositions; the four non-debt witnesses now execute
  • narrow two newly executing rows from whole-workflow YAML generation to the typed job/roster producers they judge, keeping them inside the per-claim CPU ceiling

This is a partial climb under gunbc.rung_drop.required_gate_bankruptcy, following its 2026-08-31 generated-artifact precedent. It restores four identities in one exact module and does not retire that drop: the restoration trigger remains a required run whose population is derived from the change over the whole corpus.

Price

The first admission receipt (run 33899564106) resolved 2,339 modules versus 2,209 in adjacent predecessor run 33889629622 (+130). Strict preparation was 635,645 ms versus 630,511 ms (+5,134 ms); this is an adjacent-run observation, not a causal estimate. Two whole-workflow assertions were right-censored above the 500 ms ceiling, prompting the typed-producer narrowing.

Green run 33907907019 then planned and passed all four newly recurring identities at 1 ms, 59 ms, 457 ms, and 451 ms CPU. The exact cited row w_RED_the_deleted_lanes_do_not_return passed at 451 ms.

Severity boundary

No other witness found in the corpus covers all three deleted jobs or the full FABRIC_EVIDENCE/calibration spelling set. fabric_evidence_gating and emit_copy_qualification_without_a_consumer therefore cited an uncovered capability. required_lane_claim_agreement_witness_test independently covers only the rust-unit-tests roster absence, so rust_unit_tests_off_the_merge_path has partial independent coverage but still cites the wrong artifact for the broader claim.

Verification

  • git diff --check
  • full 4,835-file DAG parse sweep passed remotely
  • run 33907907019: build, floor, generated artifacts, and aggregate witnesses all passed; floor verdict FloorClean, adjudication PASSED, blockers 0
  • disposition artifact: all four newly recurring identities planned and passed
  • per-claim cost artifact: 1/59/457/451 ms CPU

Executed RED control

The countable is authorable, not merely planned. In falsification run 33924210916 (temporary PR #10476), removing the negation around the injected ["fabric-evidence"] control made test.claim.witness_floor_workflow_consolidation_witness_test.w_RED_the_deleted_lanes_do_not_return return Bool(false) in 480,283 ns; adjudication recorded cause=claim_failed, and the floor reported exactly one failed claim. In production run 33921261763 on head 706a721, the same identity was planned and passed. Together these runs distinguish a live absence wall from a vacuous always-empty projection.

Scope and permanence

This change retires none of the three citing drops and does not alter their capability-grain restoration triggers. It makes their shared countable real: a deleted lane returning while those rows still stand now makes the required floor fail. Under DESIGN §4b(4), the now-observed RED is a permanent regression control and must remain enrolled for as long as any of the three drops stands.

@briansrls
briansrls merged commit 457e3f1 into main Sep 5, 2026
4 checks passed
@briansrls
briansrls deleted the session/cool-hawk-528 branch September 5, 2026 03:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant