Skip to content

Fix merge conflicts #11

Fix merge conflicts

Fix merge conflicts #11

Triggered via push March 15, 2024 05:10
Status Failure
Total duration 6h 0m 24s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build and Test (17, windows-latest)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
Build and Test (17, windows-latest)
The operation was canceled.
Build and Test (11, windows-latest)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
Build and Test (11, windows-latest)
The operation was canceled.
Build and Test (17, ubuntu-latest)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
Build and Test (17, ubuntu-latest)
The operation was canceled.
Build and Test (11, ubuntu-latest)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
Build and Test (11, ubuntu-latest)
The operation was canceled.