6 changes: 4 additions & 2 deletions docs/cli/plan-mode.md
Original file line number Diff line number Diff line change
Expand Up @@ -68,8 +68,10 @@ You can enter Plan Mode in three ways:
1. **Requirements:** The agent clarifies goals using `ask_user`.
2. **Exploration:** The agent uses read-only tools (like [`read_file`]) to map
the codebase and validate assumptions.
3. **Planning:** A detailed plan is written to a temporary Markdown file.
4. **Review:** You review the plan.
3. **Design:** The agent proposes alternative approaches with a recommended
solution for you to choose from.
4. **Planning:** A detailed plan is written to a temporary Markdown file.
5. **Review:** You review the plan.
- **Approve:** Exit Plan Mode and start implementation (switching to
Auto-Edit or Default approval mode).
- **Iterate:** Provide feedback to refine the plan.
Expand Down
66 changes: 41 additions & 25 deletions packages/core/src/prompts/snippets.ts
Original file line number Diff line number Diff line change
Expand Up @@ -428,34 +428,50 @@ ${options.planModeToolsList}
- You are restricted to writing files within this directory while in Plan Mode.
- Use descriptive filenames: \`feature-name.md\` or \`bugfix-description.md\`

## Workflow Rules
1. Sequential Execution: Complete ONE phase at a time. Do NOT skip ahead or combine phases.
2. User Confirmation: Wait for user input/approval before proceeding to the next phase.
3. Step Back Protocol: If new information discovered during Exploration or Design invalidates previous assumptions or requirements, you MUST pause, inform the user, and request to return to the appropriate previous phase.

## Workflow Phases

**IMPORTANT: Complete ONE phase at a time. Do NOT skip ahead or combine phases. Wait for user input before proceeding to the next phase.**

### Phase 1: Requirements Understanding
- Analyze the user's request to identify core requirements and constraints
- If critical information is missing or ambiguous, ask clarifying questions using the ${formatToolName(ASK_USER_TOOL_NAME)} tool
- When using ${formatToolName(ASK_USER_TOOL_NAME)}, prefer providing multiple-choice options for the user to select from when possible
- Do NOT explore the project or create a plan yet

### Phase 2: Project Exploration
- Only begin this phase after requirements are clear
- Use the available read-only tools to explore the project
- Identify existing patterns, conventions, and architectural decisions

### Phase 3: Design & Planning
- Only begin this phase after exploration is complete
- Create a detailed implementation plan with clear steps
- The plan MUST include:
- Iterative development steps (e.g., "Implement X, then verify with test Y")
- Specific verification steps (unit tests, manual checks, build commands)
- File paths, function signatures, and code snippets where helpful
- Save the implementation plan to the designated plans directory

### Phase 4: Review & Approval
### Phase 1: Requirements
- Analyze the user's request to identify core requirements and constraints.
- Proactively identify ambiguities, implicit assumptions, and edge cases.
- Categorize questions: functional requirements, non-functional constraints (performance, compatibility), and scope boundaries.
- Use the ${formatToolName(ASK_USER_TOOL_NAME)} tool with well-structured options to clarify ambiguities. Prefer providing multiple-choice options for the user to select from when possible.

### Phase 2: Exploration
- Only begin this phase after requirements are clear.
- Use the available read-only tools to explore the project.
- Map relevant code paths, dependencies, and architectural patterns.
- Identify existing utilities, patterns, and abstractions that can be reused.
- Note potential constraints (e.g., existing conventions, test infrastructure).
- Output: Summarize key findings to the user before proceeding to design.

### Phase 3: Design
- Only begin this phase after exploration is complete.
- **Identify Approaches:**
- For Complex Tasks: Identify at least 2 viable implementation approaches. Document the approach summary, pros, cons, complexity estimate, and risk factors for each.
- For Canonical Tasks: If there is only one reasonable, standard approach (e.g., a standard library pattern or specific bug fix), detail it and explicitly explain why no other viable alternatives were considered.
- Mandatory User Interaction: Present the analysis to the user via ${formatToolName(ASK_USER_TOOL_NAME)} and recommend a preferred approach.
- Wait for Selection: You MUST pause and wait for the user to select an approach before proceeding. Do NOT assume the user will agree with your recommendation.

### Phase 4: Planning
- Pre-requisite: You MUST have a user-selected approach from Phase 3 before generating the plan.
- Create a detailed implementation plan and save it to the designated plans directory.
- **Document Structure:** The plan MUST be a structured Markdown document (focused on implementation guidance, not workflow logging) using exactly these H2 headings:
- \`## Problem Statement\` - Describe the problem or need this change addresses.
- \`## Proposed Solution\` - Provide technical details of the implementation.
- \`## Implementation Plan\` - List ordered steps with specific file paths and the nature of each change.
- \`## Verification Plan\` - Define specific tests or manual steps to verify the change works and breaks nothing else.
- \`## Risks & Mitigations\` - Identify potential failure modes and mitigation strategies.
- \`## Alternatives Considered\` - Provide a brief analysis of other approaches considered and why they were rejected.

### Phase 5: Approval
- Present the plan and request approval for the finalized plan using the ${formatToolName(EXIT_PLAN_MODE_TOOL_NAME)} tool
- If plan is approved, you can begin implementation
- If plan is rejected, address the feedback and iterate on the plan
- If plan is approved, you can begin implementation.
- If plan is rejected, address the feedback and iterate on the plan.

${renderApprovedPlanSection(options.approvedPlanPath)}