Skip to content

All Core Devs - Testing (ACDT) #53 | Sep 15 2025 #1719

@danceratopz

Description

@danceratopz

UTC Date & Time

Sep 15, 2025, 14:00 UTC

Agenda

Happy Merge 3rd Anniversary! 🥳

Image

Fusaka

Fusaka Devnet Updates
  • Devnet-3 update (https://dora.fusaka-devnet-3.ethpandaops.io/).

    • Regained finalization, but lagging as of 2025-09-15 11:00 UTC.
    • ethpandaops will investigate this "unplanned" non-finalization ))
  • Devnet-5 launched on Wed 2025-09-10 14:00 UTC.

    • @felix314159 verified correct EL client configurations pre-launch via eth_config using a new execution-spec-tests command, more info:
    • Current overview by @barnabasbusa
      • 3 BPOs so far (https://dora.fusaka-devnet-5.ethpandaops.io/).
      • Next BPO scheduled for Tues 2025-09-16 06:32 UTC
      • PSA: tysm ethpandaops diagnostic nodes: Modified Prysm nodes with some additional monitoring.
      • PSA: watchtower is not ran for devnet-5: If you need your client image to be updated, reach out to one of the pandas (from #interop).
      • @tersec reported nimbus-Nethermind issues. These are on the Nethermind side as confirmed by @flcl42: These involve a complex reorg condition, a fix is WIP.
      • Teku non-critical Prometheus exception, a fix is WIP.
      • Teku-reth block building issue resolved (reth regression that was almost immediately resolved).
      • @tersec brought up a kzg-issue that Nimbus is debugging with Prysm #interop message link, still a WIP.
      • @tersec shared that Nimbus can't currently run consensus-specs release alpha.6 with kzg libraries 2.1.2 (but passes with kzg 2.1.1). @tbenr confirmed the same behavior when testing Teku and these KZG library versions. It's suspected that a client can't in general pass the alpha.6 tests fully without a column ID ordering which 2.1.2 (but not 2.1.1) enforce. @jtraglia will check the issue and create a new release.

No Shadow fork testing update.

eth_calls and EIP-7825 TX Limit Cap Interaction
New Hive Simulator for EIP-7934

New Hive Simulator eest/consume-sync (live since Wed 2025-09-10) @fselmo

Image
EL Consensus Test Overview

Fusaka EL Hive results overview by @spencer-tb

  • Fusaka Dashboard now contains all EEST and ethereum/tests state tests filled for PragueToOsaka, Osaka and all OsakaToBPO* transition forks, ~20,000 tests.
  • Results are good: Mainly non-critical (e.g., exception message matching). Remaining failures should be resolved over the course of next week.
  • Subsequently: Focus on results for other forks on the "Generic" dashboard.

Gas limit testing update

STEEL/EEST:

Prototyping:

Glamsterdam

BALs

ePBS

Other Topics

Reth mainnet stall.

Call Series

All Core Devs - Testing

🔧 Meeting Configuration

Duration

60 minutes

Occurrence Rate

weekly

Use Custom Meeting Link (Optional)

  • I will provide my own meeting link

Facilitator Emails (Optional)

[email protected]

Display Zoom Link in Calendar Invite (Optional)

  • Display Zoom link in invite

YouTube Livestream Link (Optional)

  • Create YouTube livestream link

Metadata

Metadata

Assignees

No one assigned

    Labels

    ACDType: All Core Dev calls - execution & consensusprotocol-callAutomatically applied by issue template

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions