Skip to content

[8.19] [Rule Details] Update tooltip copy for Investigation Guide/Related Dashboards (#224142)#224952

Merged
kibanamachine merged 1 commit intoelastic:8.19from
kibanamachine:backport/8.19/pr-224142
Jun 23, 2025
Merged

[8.19] [Rule Details] Update tooltip copy for Investigation Guide/Related Dashboards (#224142)#224952
kibanamachine merged 1 commit intoelastic:8.19from
kibanamachine:backport/8.19/pr-224142

Conversation

@kibanamachine
Copy link
Contributor

Backport

This will backport the following commits from main to 8.19:

Questions ?

Please refer to the Backport tool documentation

…shboards (elastic#224142)

## Summary

Resolves elastic#221426.

Adds tooltip content for the Related Dashboards and Investigation Guide
fields on the Details segment of the rule create/edit flow.

<img width="1039" alt="image"
src="https://github.com/user-attachments/assets/6f812ebc-7a4c-42d5-ae20-c557665a7f17"
/>

## Testing this PR

Hover over the info tips on the form row for the Investigation Guide and
Related Dashboard fields.

Ensure that they work and you can view the copy.

### Technical Writer Feedback

The tooltips for these two fields are the main area we'd like additional
feedback/refinement. If you have thoughts, please leave a review:

- [Investigation
guide](https://github.com/elastic/kibana/pull/224142/files#diff-f61636ed67a25004232d29347e88ca18b9ef0c8551dab5e192c64b524c6f077eR326)
- [Related
dashboards](https://github.com/elastic/kibana/pull/224142/files#diff-f61636ed67a25004232d29347e88ca18b9ef0c8551dab5e192c64b524c6f077eR117)

For additional context:

- Investigation guide: at the moment it is a basic text field that
allows users to include links and other information related to their
rule to help with diagnosing/managing alerts.
- Related dashboards: the user may choose to associate existing
dashboards with their rule. These dashboards are likewise then shown on
alerts that are subsequently triggered by the rule.

(cherry picked from commit 69a57a7)
@kibanamachine kibanamachine merged commit 4dcda7c into elastic:8.19 Jun 23, 2025
11 checks passed
@elasticmachine
Copy link
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Test Failures

  • [job] [logs] FTR Configs #76 / ESQL execution logic API @ess @serverless ES|QL rule type, alert suppression with exceptions should apply exceptions

Metrics [docs]

Module Count

Fewer modules leads to a faster build time

id before after diff
apm 1980 1981 +1
discover 1360 1361 +1
infra 1488 1489 +1
ml 2475 2476 +1
monitoring 741 742 +1
observability 1336 1337 +1
observabilityLogsExplorer 430 431 +1
slo 1221 1222 +1
synthetics 1275 1276 +1
transform 725 726 +1
triggersActionsUi 905 906 +1
uptime 807 808 +1
total +12

Async chunks

Total size of all lazy-loaded chunks that will be downloaded as the user navigates the app

id before after diff
apm 2.7MB 2.7MB +399.0B
discover 1.1MB 1.1MB +400.0B
infra 1.2MB 1.2MB +399.0B
ml 5.5MB 5.5MB +402.0B
monitoring 688.4KB 688.8KB +400.0B
observability 1.3MB 1.3MB +426.0B
observabilityLogsExplorer 290.6KB 291.0KB +400.0B
slo 1015.0KB 1015.4KB +400.0B
synthetics 1.0MB 1.0MB +400.0B
transform 655.6KB 655.9KB +400.0B
triggersActionsUi 1.5MB 1.5MB +419.0B
uptime 510.5KB 510.9KB +400.0B
total +4.7KB

cc @justinkambic

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants