Skip to content

[8.18] [Playground chat] Change the text for Elastic LLM (#217591)#217698

Merged
kibanamachine merged 1 commit intoelastic:8.18from
kibanamachine:backport/8.18/pr-217591
Apr 9, 2025
Merged

[8.18] [Playground chat] Change the text for Elastic LLM (#217591)#217698
kibanamachine merged 1 commit intoelastic:8.18from
kibanamachine:backport/8.18/pr-217591

Conversation

@kibanamachine
Copy link
Contributor

Backport

This will backport the following commits from main to 8.18:

Questions ?

Please refer to the Backport tool documentation

## Summary

This PR changes the name from **Elastic LLM** to **Elastic Managed LLM**
in the playground.

<img width="860" alt="Screenshot 2025-04-08 at 2 58 21 PM"
src="https://github.com/user-attachments/assets/2c92cab8-8e63-42e4-91db-b4fd05af4a0a"
/>

### Checklist

Check the PR satisfies following conditions.

Reviewers should verify this PR satisfies this list as well.

- [ ] Any text added follows [EUI's writing
guidelines](https://elastic.github.io/eui/#/guidelines/writing), uses
sentence case text and includes [i18n
support](https://github.com/elastic/kibana/blob/main/src/platform/packages/shared/kbn-i18n/README.md)
- [ ]
[Documentation](https://www.elastic.co/guide/en/kibana/master/development-documentation.html)
was added for features that require explanation or tutorials
- [x] [Unit or functional
tests](https://www.elastic.co/guide/en/kibana/master/development-tests.html)
were updated or added to match the most common scenarios
- [ ] If a plugin configuration key changed, check if it needs to be
allowlisted in the cloud and added to the [docker
list](https://github.com/elastic/kibana/blob/main/src/dev/build/tasks/os_packages/docker_generator/resources/base/bin/kibana-docker)
- [ ] This was checked for breaking HTTP API changes, and any breaking
changes have been approved by the breaking-change committee. The
`release_note:breaking` label should be applied in these situations.
- [ ] [Flaky Test
Runner](https://ci-stats.kibana.dev/trigger_flaky_test_runner/1) was
used on any tests changed
- [x] The PR description includes the appropriate Release Notes section,
and the correct `release_note:*` label is applied per the
[guidelines](https://www.elastic.co/guide/en/kibana/master/contributing.html#kibana-release-notes-process)

### Identify risks

Does this PR introduce any risks? For example, consider risks like hard
to test bugs, performance regression, potential of data loss.

Describe the risk, its severity, and mitigation for each identified
risk. Invite stakeholders and evaluate how to proceed before merging.

- [ ] [See some risk
examples](https://github.com/elastic/kibana/blob/main/RISK_MATRIX.mdx)
- [ ] ...

(cherry picked from commit 8b6e73b)
@kibanamachine kibanamachine added the backport This PR is a backport of another PR label Apr 9, 2025
@kibanamachine kibanamachine enabled auto-merge (squash) April 9, 2025 14:58
@kibanamachine kibanamachine merged commit a8b880e into elastic:8.18 Apr 9, 2025
11 checks passed
@elasticmachine
Copy link
Contributor

💚 Build Succeeded

Metrics [docs]

Page load bundle

Size of the bundles that are downloaded on every page load. Target size is below 100kb

id before after diff
stackConnectors 60.0KB 60.0KB +8.0B

cc @saikatsarkar056

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants