Skip to content

[9.0] [Search] Using plugs EUI icon (#213700)#213728

Merged
kibanamachine merged 1 commit intoelastic:9.0from
kibanamachine:backport/9.0/pr-213700
Mar 10, 2025
Merged

[9.0] [Search] Using plugs EUI icon (#213700)#213728
kibanamachine merged 1 commit intoelastic:9.0from
kibanamachine:backport/9.0/pr-213700

Conversation

@kibanamachine
Copy link
Contributor

Backport

This will backport the following commits from main to 9.0:

Questions ?

Please refer to the Backport tool documentation

## Summary

Updating the new EUI plugs icon within the Create a connector button in
the Home page

![CleanShot 2025-03-10 at 11 20
44@2x](https://github.com/user-attachments/assets/87dda36b-356d-4051-9c6f-9c75daaae364)

### Checklist

Check the PR satisfies following conditions.

Reviewers should verify this PR satisfies this list as well.

- [ ] Any text added follows [EUI's writing
guidelines](https://elastic.github.io/eui/#/guidelines/writing), uses
sentence case text and includes [i18n
support](https://github.com/elastic/kibana/blob/main/src/platform/packages/shared/kbn-i18n/README.md)
- [ ]
[Documentation](https://www.elastic.co/guide/en/kibana/master/development-documentation.html)
was added for features that require explanation or tutorials
- [ ] [Unit or functional
tests](https://www.elastic.co/guide/en/kibana/master/development-tests.html)
were updated or added to match the most common scenarios
- [ ] If a plugin configuration key changed, check if it needs to be
allowlisted in the cloud and added to the [docker
list](https://github.com/elastic/kibana/blob/main/src/dev/build/tasks/os_packages/docker_generator/resources/base/bin/kibana-docker)
- [ ] This was checked for breaking HTTP API changes, and any breaking
changes have been approved by the breaking-change committee. The
`release_note:breaking` label should be applied in these situations.
- [ ] [Flaky Test
Runner](https://ci-stats.kibana.dev/trigger_flaky_test_runner/1) was
used on any tests changed
- [ ] The PR description includes the appropriate Release Notes section,
and the correct `release_note:*` label is applied per the
[guidelines](https://www.elastic.co/guide/en/kibana/master/contributing.html#kibana-release-notes-process)

### Identify risks

Does this PR introduce any risks? For example, consider risks like hard
to test bugs, performance regression, potential of data loss.

Describe the risk, its severity, and mitigation for each identified
risk. Invite stakeholders and evaluate how to proceed before merging.

- [ ] [See some risk
examples](https://github.com/elastic/kibana/blob/main/RISK_MATRIX.mdx)
- [ ] ...

(cherry picked from commit 516c9dc)
@kibanamachine kibanamachine added the backport This PR is a backport of another PR label Mar 10, 2025
@kibanamachine kibanamachine enabled auto-merge (squash) March 10, 2025 12:56
@kibanamachine kibanamachine merged commit 51d4866 into elastic:9.0 Mar 10, 2025
12 checks passed
@elasticmachine
Copy link
Contributor

💚 Build Succeeded

Metrics [docs]

Module Count

Fewer modules leads to a faster build time

id before after diff
enterpriseSearch 1311 1310 -1

Async chunks

Total size of all lazy-loaded chunks that will be downloaded as the user navigates the app

id before after diff
enterpriseSearch 1.3MB 1.3MB -937.0B

cc @JoseLuisGJ

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants