Skip to content

Conversation

@jbudz
Copy link
Member

@jbudz jbudz commented Dec 27, 2024

#199071 introduced a daily pipeline to run acceptance tests against the latest EPR image and to promote the image if successful.

This updates our tests to start using the daily promotion except when running the acceptance tests.

@jbudz jbudz added Team:Operations Kibana-Operations Team release_note:skip Skip the PR/issue when compiling release notes backport:prev-major labels Dec 27, 2024
@jbudz jbudz marked this pull request as ready for review December 30, 2024 22:42
@jbudz jbudz requested review from a team as code owners December 30, 2024 22:42
@elasticmachine
Copy link
Contributor

Pinging @elastic/kibana-operations (Team:Operations)

@botelastic botelastic bot added the Team:Fleet Team label for Observability Data Collection Fleet team label Dec 30, 2024
@elasticmachine
Copy link
Contributor

Pinging @elastic/fleet (Team:Fleet)

Copy link
Member

@nchaulet nchaulet left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🚀

Copy link
Member

@pheyos pheyos left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM

@elasticmachine
Copy link
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Test Failures

  • [job] [logs] FTR Configs #97 / serverless observability UI Dataset Quality Dataset quality summary shows poor, degraded and good count as 0 and all dataset as healthy

Metrics [docs]

✅ unchanged

History

@jbudz jbudz merged commit 8ed7283 into elastic:main Jan 6, 2025
9 checks passed
@kibanamachine
Copy link
Contributor

Starting backport for target branches: 8.16, 8.17, 8.x

https://github.com/elastic/kibana/actions/runs/12639560859

jbudz added a commit to jbudz/kibana that referenced this pull request Jan 6, 2025
elastic#199071 introduced a daily
pipeline to run acceptance tests against the latest EPR image and to
promote the image if successful.

This updates our tests to start using the daily promotion except when
running the acceptance tests.
jbudz added a commit to jbudz/kibana that referenced this pull request Jan 6, 2025
elastic#199071 introduced a daily
pipeline to run acceptance tests against the latest EPR image and to
promote the image if successful.

This updates our tests to start using the daily promotion except when
running the acceptance tests.
jbudz added a commit to jbudz/kibana that referenced this pull request Jan 6, 2025
elastic#199071 introduced a daily
pipeline to run acceptance tests against the latest EPR image and to
promote the image if successful.

This updates our tests to start using the daily promotion except when
running the acceptance tests.
@kibanamachine
Copy link
Contributor

💔 All backports failed

Status Branch Result
8.16 Backport failed because of merge conflicts
8.17 Backport failed because of merge conflicts
8.x Backport failed because of merge conflicts

You might need to backport the following PRs to 8.x:
- [ResponseOps] Granular Connector RBAC - adding back UIs for testing connectors in stack management (#204804)
- Update @elastic/kibana-data-discovery dependencies (main) (#202622)
- [Synonyms UI] Synonyms UI base plugin (#203284)
- [ResponseOps] Granular Connector RBAC (#203503)
- [Fleet] Trigger a rollover on error when updating enabled mappings (#205532)
- [Core] [Telemetry] Update file references (#205603)
- [upgrade assistant] Borealis updates (#205345)
- [cypress/security_solution] Rebalance parallelism (#205452)

Manual backport

To create the backport manually run:

node scripts/backport --pr 205221

Questions ?

Please refer to the Backport tool documentation

@kibanamachine
Copy link
Contributor

Looks like this PR has backport PRs but they still haven't been merged. Please merge them ASAP to keep the branches relatively in sync.

@kibanamachine kibanamachine added the backport missing Added to PRs automatically when the are determined to be missing a backport. label Jan 7, 2025
@kibanamachine kibanamachine removed the backport missing Added to PRs automatically when the are determined to be missing a backport. label Jan 7, 2025
viduni94 pushed a commit to viduni94/kibana that referenced this pull request Jan 23, 2025
elastic#199071 introduced a daily
pipeline to run acceptance tests against the latest EPR image and to
promote the image if successful.

This updates our tests to start using the daily promotion except when
running the acceptance tests.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

release_note:skip Skip the PR/issue when compiling release notes Team:Fleet Team label for Observability Data Collection Fleet team Team:Operations Kibana-Operations Team v9.0.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

6 participants