Skip to content

[8.x] [ML] AIOps: Move Log Rate Analysis results callout to help popover. (#192243)#193675

Merged
kibanamachine merged 1 commit intoelastic:8.xfrom
kibanamachine:backport/8.x/pr-192243
Sep 23, 2024
Merged

[8.x] [ML] AIOps: Move Log Rate Analysis results callout to help popover. (#192243)#193675
kibanamachine merged 1 commit intoelastic:8.xfrom
kibanamachine:backport/8.x/pr-192243

Conversation

@kibanamachine
Copy link
Copy Markdown
Contributor

Backport

This will backport the following commits from main to 8.x:

Questions ?

Please refer to the Backport tool documentation

…lastic#192243)

## Summary

Moves the callout that describes some analysis details to a help
popover.

Before:

<img width="1064" alt="image"
src="https://github.com/user-attachments/assets/cb2820f9-8cdc-4d31-98ac-df199509767a">

After:

<img width="1174" alt="image"
src="https://github.com/user-attachments/assets/dc795816-6da6-4e58-bc86-d490034140ce">

### Checklist

- [x] Any text added follows [EUI's writing
guidelines](https://elastic.github.io/eui/#/guidelines/writing), uses
sentence case text and includes [i18n
support](https://github.com/elastic/kibana/blob/main/packages/kbn-i18n/README.md)
- [x] [Unit or functional
tests](https://www.elastic.co/guide/en/kibana/master/development-tests.html)
were updated or added to match the most common scenarios
- [x] This was checked for breaking API changes and was [labeled
appropriately](https://www.elastic.co/guide/en/kibana/master/contributing.html#kibana-release-notes-process)

(cherry picked from commit dc9fb65)
@kibana-ci
Copy link
Copy Markdown

💛 Build succeeded, but was flaky

Failed CI Steps

Test Failures

  • [job] [logs] Jest Tests #8 / GlobalDataTagsTable should add new tags

Metrics [docs]

Async chunks

Total size of all lazy-loaded chunks that will be downloaded as the user navigates the app

id before after diff
aiops 547.7KB 548.3KB +558.0B
dataVisualizer 726.4KB 726.5KB +98.0B
total +656.0B

To update your PR or re-run it, just comment with:
@elasticmachine merge upstream

cc @walterra

@kibanamachine kibanamachine merged commit c3d8fb4 into elastic:8.x Sep 23, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants