Skip to content

[Filebeat][Checkpoint] - Removed PR #31076 from 7.17.8 release notes#35582

Open
eyapene wants to merge 1 commit into7.17from
eyapene-patch-1
Open

[Filebeat][Checkpoint] - Removed PR #31076 from 7.17.8 release notes#35582
eyapene wants to merge 1 commit into7.17from
eyapene-patch-1

Conversation

@eyapene
Copy link

@eyapene eyapene commented May 25, 2023

Type of change

  • Docs

What does this PR do?

This PR removed the PR #31076 added in release notes for version 7.17.8

Why is it important?

The PR #31076 was tagged to backport to 8.3.0. In the 8.3 branch commit history, we can see that PR on 2022-04-04, but in the 7.17 branch commit history that commit is not there. Tested in version 7.17.10, this feature does not appear to be available.

Checklist

[ ] My code follows the style guidelines of this project
[ ] I have commented my code, particularly in hard-to-understand areas
[ ] I have made corresponding changes to the documentation
[ ] I have made corresponding change to the default configuration files
[ ] I have added tests that prove my fix is effective or that my feature works

  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

…ransport` derived from IANA number - PR 31076]

Request to update this as the PR 31076 - [checkpoint module: Add `network.transport` derived from IANA number] seems to be uncommitted in 7.17 branch commit history
@eyapene eyapene added the docs label May 25, 2023
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label May 25, 2023
@eyapene eyapene added the Team:Docs Label for the Observability docs team label May 25, 2023
@elasticmachine
Copy link
Contributor

Pinging @elastic/ingest-docs (Team:Docs)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label May 25, 2023
@elasticmachine
Copy link
Contributor

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview preview

Expand to view the summary

Build stats

  • Start Time: 2023-05-25T20:51:01.968+0000

  • Duration: 8 min 3 sec

❕ Flaky test report

No test was executed to be analysed.

🤖 GitHub comments

Expand to view the GitHub comments

To re-run your PR in the CI, just comment with:

  • /test : Re-trigger the build.

  • /package : Generate the packages and run the E2E tests.

  • /beats-tester : Run the installation tests with beats-tester.

  • run elasticsearch-ci/docs : Re-trigger the docs validation. (use unformatted text in the comment!)

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

docs Team:Docs Label for the Observability docs team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants