chore(deps): bump github.com/hashicorp/memberlist from 0.5.1 to 0.5.2 #1826
compatibility-e2e-v2.yml
on: pull_request
Matrix: compatibility_e2e_tests
Annotations
7 errors and 2 warnings
compatibility_e2e_tests (manager)
Process completed with exit code 1.
|
compatibility_e2e_tests (client)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (client)
The operation was canceled.
|
compatibility_e2e_tests (scheduler)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (scheduler)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (seed-client)
The operation was canceled.
|
compatibility_e2e_tests (manager)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
compatibility_e2e_tests (client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
dragonflyoss~dragonfly~0K9I73.dockerbuild
|
43.4 KB |
|
dragonflyoss~dragonfly~2HZTPW.dockerbuild
|
50.3 KB |
|
dragonflyoss~dragonfly~5PUG6R.dockerbuild
|
51.3 KB |
|
dragonflyoss~dragonfly~5TCSV4.dockerbuild
|
51.6 KB |
|
dragonflyoss~dragonfly~ERQENS.dockerbuild
|
50.6 KB |
|
dragonflyoss~dragonfly~JK7NFM.dockerbuild
|
44.1 KB |
|
dragonflyoss~dragonfly~T926F4.dockerbuild
|
44.6 KB |
|
dragonflyoss~dragonfly~W0MKOT.dockerbuild
|
43.8 KB |
|
manager-e2e-tests-logs
|
17.8 MB |
|
scheduler-e2e-tests-logs
|
100 MB |
|
seed-client-e2e-tests-logs
|
10 MB |
|