Skip to content

Refactor Test TDS Servers. Expand functional testing of connection pooling and transient failures.#3488

Merged
mdaigle merged 51 commits into
dotnet:mainfrom
mdaigle:dev/mdaigle/failover-tds-server
Sep 25, 2025
Merged

Refactor Test TDS Servers. Expand functional testing of connection pooling and transient failures.#3488
mdaigle merged 51 commits into
dotnet:mainfrom
mdaigle:dev/mdaigle/failover-tds-server

Add common test project to unit test restore targets.

5eee939
Select commit
Loading
Failed to load commit list.
Azure Pipelines / CI-SqlClient (Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3) cancelled Sep 4, 2025 in 1h 29m 58s

Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3 was canceled

Annotations

Check failure on line 823 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / CI-SqlClient (Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3)

Build log #L823

Error: The process '/opt/hostedtoolcache/dotnet' failed with exit code 1

Check failure on line 825 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / CI-SqlClient (Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3)

Build log #L825

Dotnet command failed with non-zero exit code on the following projects : [ '/mnt/vss/_work/1/s/build.proj' ]

Check failure on line 1280 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / CI-SqlClient (Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3)

Build log #L1280

The Operation will be canceled. The next steps may not contain expected logs.

Check failure on line 1281 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / CI-SqlClient (Ubuntu20_Azure_Sql net9_0_AnyCPU_ManagedSNI_3)

Build log #L1281

The operation was canceled.