-
Notifications
You must be signed in to change notification settings - Fork 1
Ongoing documentation of work
uekiai edited this page Oct 30, 2018
·
20 revisions
For the creation of the application Bridging 33 the design team had collectively 7 stages in which were worked by gathering of information in several forms such as:
- Academic Research
- Staff Feedback
- User testing Feedback (from target audience)
This made iterations possible with the proper refinement of ideas, and prototype features that the team brainstormed during the implementation of the final prototype. and documentation of this. The Index of Raw data is contained in the repository of code and its includes rationales and choices, made key insights and work planification. On the Design Stages are presented the key core insight of these, the main points of The Index of Raw data and presented with feedback interventions.
- To do list
- Index of Data Documentation
- Stage 2: Interviews and Questionnaire
- Stage 3: Prototype I (Interactive, mid fidelity)
- Stage 4: User Testing and Questionnaire I
- Editing Stage 5: Prototype II (Interactive, high fidelity)
- Stage 6: User Testing and Questionnaire II
- Stage 7: Prototype III (Interactive, high fidelity)
- Interviews and Features
- Consent Forms
https://www.youtube.com/watch?v=Rv_-V8pH014
- Overview
- Concept Proposal
- Sprint Plan #1
- Sprint Plan #2
- Sprint Plan #3