docs(semantic-layer): adopt target architecture for Phase B - #2184
Merged
cyberantonz merged 4 commits intoAug 4, 2026
Merged
DCO-2 / DCO
succeeded
Aug 4, 2026 in 0s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | a71b75f | docs(semantic-layer): adopt target architecture fo... | Valid sign-off found |
| 🟢 | 360a843 | docs(semantic-layer): cohorts are org-gated, not t... | Valid sign-off found |
| 🟢 | c99191c | Merge branch 'main' into docs/adopt-semantic-layer | Skipped: sign-off not required in merge commit |
| 🟢 | 19c4a20 | docs(semantic-layer): governed PRD + DESIGN, regis... | Valid sign-off found |
Loading